DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.

Slides:



Advertisements
Similar presentations
Fp7 - LEADER Slide 1 ALFRED C&S rods mechanical design FA_ ppt Task 2.4 – Mechanical Design & Drawings of LFR and ETDR Fuel Assemblies (mech. Design)
Advertisements

1. Install Your BalJak™ into floor using driver and drill.
N. Dos Santos1 TX54 Mobile Shielding Door 106th CEMESTE – N. Dos Santos/ TS-LEA Floor steel plates and anchors system Chassis assembly Chassis.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
Connection of flange plate with web
1 Installation of Delphi Frame  ITS Installation.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
DCal Meeting
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
Christelle Roy - Subatech 1 EMCal – France StatusCERN Since the Scientific Council.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Week 13 Deliverables Team Highlander. Modifications from last Mock-Up Lever assembly is offset from walker Ski assembly is now solid Levers swing upward.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Technical Specification Handling Engineering Group.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
ALICE EMCAL CATANIA FACILITY The assembly Lab Assembly Team Catania Team is composed: 1 Ricercatore Armando Palmeri 1 Assegnista Tecnologo Francesco.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
DCal Insertion Tooling 24/02/ DCal Insertion Tooling DCal Insertion System feature following main components 1. One rotator : cylindric welded structure.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
AMS TRD GAS SUPPLY SYSTEM BOX_S Mechanical Structure Corrado Gargiulo* Robert Becker** *INFN Roma1 **MIT CERN, July AMS TRD GAS SUPPLY SYSTEM.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
DCal-ALICE integration and installation plan and status A. Tauro.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Ideas on TPC Assembly Volker Prahl, Thomas Schörner-Sadenius Paris, 8/9 October /9 October 2015TSS: TPC Assembly1.
Production Planning – Designing Tooling
Roadmap for triplet cryostats
SBN Far Detector Installation & Integration
LS1 planning meeting
Cryostat procurement, status and plan, QA/QC
WP9 ITS Mechanics and Cooling
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
TPC Support and Constraint TPC Support
Station and Module Support Frames
Revision 1 July 2016.
Installation Binder / IRR – an example
LARP Phase II Secondary Collimator RC-0 and RC-1
as a prototype for Super c-tau factory
Bridge Project Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Technical Updates Gábor László NSS Lead Instrument Engineer
US-HiLumi – Shipping Post Assembly Status
Bridge Project Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials.
The CO2 Dragster TIJ 101 Upon finishing your brainstorming and Final Drawing (with dimensions and ruled lines) The following steps with be taken for fabrication.
Presentation transcript:

DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN REVIEW 26 JULY 2012

2 NEW CYLINDRICAL ROLLERS before now ROTATOR INTERFACES VERIFICATION LOAD TRANSFER BALLS

SLIDING PLATFORM mm DCAL DESIGN REVIEW 26 JULY 2012

SLIDING PLATFORM 4 DCAL DESIGN REVIEW 26 JULY 2012

5 Sliding platform vs rotator i/f verification ok

DCAL DESIGN REVIEW 26 JULY ° 20° 60° 0° Sliding platform & (°) ok

DCAL DESIGN REVIEW 26 JULY ? Rotator Rails interference with miniframe: Rails cut not in the last 3D CAD model

DCAL DESIGN REVIEW 26 JULY mm150 mm * Sliding platform vs services ok

DCAL DESIGN REVIEW 26 JULY OK ? TO BE SHORTENED OK

10 DCAL DESIGN REVIEW 26 JULY /3 SUPERMODULE PUSHING JIG

11 Drawings approved for production at DCAL Design review 12 June 2012 DCAL DESIGN REVIEW 26 JULY 2012

12 90% production done …on going -rollers machining -welding (TBD) -painting 1 week estimated working time to completion

DCAL DESIGN REVIEW 26 JULY ? -welding TBD the cut in the bracket for services

DCAL DESIGN REVIEW 26 JULY ° 20° 60° 0° Dcal bridge

DCAL DESIGN REVIEW 26 JULY Bridge production drawing final revision on going

DCAL DESIGN REVIEW 26 JULY n.8 length ~3700mm Minimum number needed n.2+2 spare n.2 length ~3300mm TBD n.4 length ~3600mm TBD n.8 length ~1600mm TBD by Manoel production drawings by whom? Bridge rails

DCAL DESIGN REVIEW 26 JULY Constraints to define rails length for 60°

DCAL DESIGN REVIEW 26 JULY DRILLING N.6 M20 HOLE X BEAM FOR BEAM HANDLING NEED FORMAL APPROVAL DCAL rails

DCAL DESIGN REVIEW 26 JULY DCAL rails LOAD TEST RAILS INSTALLATION IN SXL2 COMPLETED BY THE END OF THE WEEK

DCAL DESIGN REVIEW 26 JULY PROCEDURES Needed soon Load test in SXL2 Survey in SXL2 Survey in L3 For procedures use the template “Alice Task Description”