DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN REVIEW 26 JULY 2012
2 NEW CYLINDRICAL ROLLERS before now ROTATOR INTERFACES VERIFICATION LOAD TRANSFER BALLS
SLIDING PLATFORM mm DCAL DESIGN REVIEW 26 JULY 2012
SLIDING PLATFORM 4 DCAL DESIGN REVIEW 26 JULY 2012
5 Sliding platform vs rotator i/f verification ok
DCAL DESIGN REVIEW 26 JULY ° 20° 60° 0° Sliding platform & (°) ok
DCAL DESIGN REVIEW 26 JULY ? Rotator Rails interference with miniframe: Rails cut not in the last 3D CAD model
DCAL DESIGN REVIEW 26 JULY mm150 mm * Sliding platform vs services ok
DCAL DESIGN REVIEW 26 JULY OK ? TO BE SHORTENED OK
10 DCAL DESIGN REVIEW 26 JULY /3 SUPERMODULE PUSHING JIG
11 Drawings approved for production at DCAL Design review 12 June 2012 DCAL DESIGN REVIEW 26 JULY 2012
12 90% production done …on going -rollers machining -welding (TBD) -painting 1 week estimated working time to completion
DCAL DESIGN REVIEW 26 JULY ? -welding TBD the cut in the bracket for services
DCAL DESIGN REVIEW 26 JULY ° 20° 60° 0° Dcal bridge
DCAL DESIGN REVIEW 26 JULY Bridge production drawing final revision on going
DCAL DESIGN REVIEW 26 JULY n.8 length ~3700mm Minimum number needed n.2+2 spare n.2 length ~3300mm TBD n.4 length ~3600mm TBD n.8 length ~1600mm TBD by Manoel production drawings by whom? Bridge rails
DCAL DESIGN REVIEW 26 JULY Constraints to define rails length for 60°
DCAL DESIGN REVIEW 26 JULY DRILLING N.6 M20 HOLE X BEAM FOR BEAM HANDLING NEED FORMAL APPROVAL DCAL rails
DCAL DESIGN REVIEW 26 JULY DCAL rails LOAD TEST RAILS INSTALLATION IN SXL2 COMPLETED BY THE END OF THE WEEK
DCAL DESIGN REVIEW 26 JULY PROCEDURES Needed soon Load test in SXL2 Survey in SXL2 Survey in L3 For procedures use the template “Alice Task Description”