A Progress Report. Work Completed  All criteria have been analyzed and processed for analysis  Data ranges within each criteria have been selected.

Slides:



Advertisements
Similar presentations
Test Construction A workshop. Activity 1 Using the information you read Brown (2004) (particularly on pages 51-64), develop criteria for evaluating an.
Advertisements

SIM Delivery System Reform Status FFY Q1, SIM Delivery System Reform Driven by Maine Quality Counts Overall Delivery System Reform Status:Green.
UNSW Strategic Educational Development Grants
My portfolio in a few slides Mija RABEMANANJARA April 2014.
Marketing Research Aaker, Kumar, Day and Leone Tenth Edition Instructor’s Presentation Slides 1.
Proposal to Create and Implement a Geodatabase for Freeman Center, Texas State University San Marcos, TX.
World Printing Production Team members: Sean Whitehead,Project Manager William Shamburg,Asst. Project Manager Regan Presley,GIS Analyst Erik Olden,GIS.
User Assisted Interface Jeremiah Asher and Yi Shi.
Aaker, Kumar, Day Ninth Edition Instructor’s Presentation Slides
High School Participation Map Project Geography of Sports Spring 2011.
Virginia Teacher Performance Evaluation System
COMPREHENSIVE DATABASE FOR SPRINGS IN TEXAS Prepared by: Ben Bates, Jason Pickett, Mark Pillion, Yasmin Sierra Status Report.
Managing Projects and Clients Senior Consultant Training 23 September 2005.
The City of New Braunfels Parks and Recreations Asset Management Project.
Location Analysis for Outdoor Recycling Bin Placement Prepared for:
Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
╬Cory Vardaman Project Manager ╬Joe Clark Assistant Manager ╬Lisa Albanese GIS Technician, Web Master ╬Ethan Roberts GIS Analyst, Graphics Design.
Rachel Cavin, Manager James Dodds, Assistant Manager Taylor Dorn, GIS Analyst Kyler McNew, GIS Analyst Cartographic Modeling of Sidewalk Location Selection.
Bill Higbee April 12, 2011 Selecting an Enterprise Class Social Media Monitoring Vendor.
20 countries Over 5000 offline Europeans more then 500 telecentres.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
Lone Star Members Project Manager: Bob Armentrout Assistant Manager: Nina Castillo Web Designer: Daniel Roberts Analysts: Cade Colston, Mehs Ess, Linda.
Katy Morris: Project Manager Nick Down: Assistant Manager Travis Hamel: GIS Analyst.
Assessment Literacy Series 1 -Module 6- Quality Assurance & Form Reviews.
{ Mapping & Analysis of Wastewater Spills in the Barton Springs and Southern Segments of the Edwards Aquifer Project Manager: Katie Tritsch GIS Analyst:
The Web Site Design and Development Process There are numerous steps in the web site design and development process. From gathering initial information,
 Project Manager: Chase Chapman  Assistant Manager: Ryan Hilliard  GIS Analyst: Jason Snyder  Web Master: Marques Green.
{ Mapping & Analysis of Wastewater Spills in the Barton Springs and Southern Segments of the Edwards Aquifer Consultants: Project Manager: Katie Tritsch.
Team legado 1. Amer Al Mazrouei 2. Mohammed Sharara.
Potential Scenic Sites Analysis for the Hill Country Conservancy Nancy A. Heger, ManagerGene Sipes, Assistant Manager Matt Broadaway, GIS AnalystMatt Gray,
Flash Flood Pilot Project: Prepared for Texas Department of State Health Services and Texas Flash Flood Coalition Sarah Eason, Mark Tijerina, Cooper Sims,
San Marcos Municipal Airport Airspace Planning Project Prepared for: Texas Department of Transportation.
Evacuation Safety Planners * Jason HaycockRobert Broussard Colleen Grentz Project Manager Analyst & Webmaster Analyst & Project Designer.
Finalizing the Plan Session Four. Session Overview Finalizing SMART Goals Designing Strategies and Actions to Meet Goals Identifying Appropriate Measures.
Roadmap to successful ECM implementation Kateřina Divišová British Chamber of Commerce
 Affordable housing in San Marcos, TX is in short supply.  Housing is unavailable for certain income levels.  The ratios between rent-occupied and.
July 7, 2015 New Principal Training Financial Analysis & Training.
Iftach Pearlman City of Leesburg, GIS Keyetta Jackson Lake County, GIS Francis Franco Metropolitan Planning Organization, GIS.
Fall 2010 Mathematics Standards of Learning Assessment Update - 1 -
Cody Clarke - Project Team Leader Sherry Priddy - Project Assistant Team Leader Jason Baker - Information Analyst Les Stewart - Data Collection Randy Guzman.
T.E.E.G.S Transportation, Emergency, and Environmental GIS Services Matt Smith Project Manager Lauren Bender GIS Analyst Amanda Magera GIS Analyst Aaron.
Vers national spatial data infrastructure training program NSDI Cooperative Agreements Program (CAP) Introduction to the Cooperative Agreements.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
GEOG 370 Christine Erlien, Instructor
Manager: John Daneri Analyst: Kathleen Callahan Assistant Manager: Jacob Powell Analyst: Leah Gibson.
MSLM Consulting Inc. The Travel Experts Friday November 12,
Clayton Hahn Project Manager Jeff King Assistant Project Manager John Refolo Web-Master/GIS Analyst Shannan Brent GIS Analyst William Marthes GIS Analyst.
W. E. T. Water Elevation Technologies David Lynch Project Manager Miriam Mosher GIS Analyst Jeff Gravett GIS Analyst Clinton Buehring GIS Analyst.
Analysis of Potential Scenic Sites for the Hill Country Conservancy and Hill Country Alliance Nancy A. Heger, ManagerGene Sipes, Assistant Manager Matt.
City of Woodcreek, TX Project Proposal GEO 4427 Advanced GIS II.
Yanling Sun, Ph.D. Senior Instructional Coordinator Technology Training and Integration ADDIE: A Guide for Designing Online Courses Summer Symposium for.
Capabilities Analysis Briefing for Chancellor and Senior Leaders.
Assessment of Hill Country Land Use: Records at the County Level Loma Environmental Strategies.
Applied Mathematics 1 Applications of the Multi-Weighted Scoring Model and the Analytical Hierarchy Process for the Appraisal and Evaluation of Suppliers.
Bricks and Clicks A range of terminology has evolved to describe the new trading patterns, in particular to distinguish between traditional retailing and.
CULS Czech University of Life Science Segmentation in the marketing context.
Campus Storm Water Proposal A Storm Water Solutions Project.
Session 4 Workshop Sand Art Performance ALLOTED TIME: 30 MINUTES ONLY Designing Scoring Rubrics As a team (4 members), create your own class project rubric.
Sidewalk Strategic Plan City of Peterborough, Ontario.
ServiceNow Special Interest Group Phased WorkTemplate Information & Educational Technology 1 DRAFT
 Develop SMART Goal aligned to your building’s School Improvement Plan.  Goals should be single year goals with benchmarks throughout the.
DeWitt County Emergency Response Handbook 1 of 9 Project Manager: Robert Gannon Assistant Project Manager: Matt Ahrens GIS Analyst: George Caracostis.
APPROACH TO INSTRUCTIONAL SYSTEM DESIGN
Six Sigma DMAIC Improvement Story
Evaluating RFP’s Presented by:
DS595/CS525: Urban Network Analysis Prof. Yanhua Li
Tracey R. Hembry, Ph.D. Andrew Wiley, Ph.D.
Wednesday, December 1st Today’s Facilitators: Kim Glow & Cindy Dollman
Project Progress Summary - Week 18
SRCDS: ESP Evaluation System
Presentation transcript:

A Progress Report

Work Completed  All criteria have been analyzed and processed for analysis  Data ranges within each criteria have been selected. These ranges are based on the most even distribution of data per each category for every criteria.  A cartographic model was constructed to facilitate analysis of the data for each of the final maps tat will be produced.

Analysis Model

Work in Progress  Currently we are in the process of performing the analysis. We have done a first run of our model with equal weights for each criteria.  Creation and maintenance of metadata is underway and will be an ongoing process.  The basic website design has been created and will be online within the next two weeks.

Work Planned  We will evaluate methods for performing criterion weighing and will be conducting a sensitivity analysis to test the robustness of the results.  Cartographic model will be finalized with the appropriate formulae to calculate final vulnerability scores and show results geographically across the scope.  The final product includes a website containing web maps with the ability to zoom in on a particular county.  Other final deliverables Static maps with the results two posters with a summary of the analysis Final project analysis report DVD media containing all project data

Timeline WE ARE ON TARGET FOR DELIVERY ON MAY 11 TH 2009!

Meet the SMART team  John Daneri Project Manager  Jacob Powell Assistant Manager  Kathleen Callahan GIS Analyst  Leah Gibson GIS Analyst