HV-SQUID Compatibility Test Study the SQUID performance in a HV environment. Study the HV breakdown –in superfluid under pressure. –using different materials.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
EDM Collaboration Meeting, October 5-7, 2006 Valve R&D Steve Williamson UIUC.
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
SQUID NMR Measurements in nEDM experiment -- how to get a big signal & how to operate SQUIDs in High Voltage Environments Chen-Yu Liu.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 New baseline for the magnet cooling system Yury Ivanyushenkov Engineering and Instrumentation Department, Rutherford Appleton Laboratory.
Critical Current Probe Mid-Point Review Amy Eckerle Andrew Whittington Philip Witherspoon Team 16 NHMFL Applied Superconductivity Center 1.
Progress report on the HV-SQUID Compatibility Test
Studies of Voltage Breakdown in Superfluid 4 He May 20, 2008 Maciej Karcz, Craig Huffer, Young Jin Kim, Chen-Yu Liu, Josh Long May 20, 2008 Maciej Karcz,
DHB, nEDM Collab. Mtg, 15/16 Apr 04 UIUC Test System (Beck, Chandler, Hertzog, Kammel, Newman, Peng, Sharp, Williamson, Yoder; Blackburn, Kenyon, Thorsland)
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Results from the HV Test System Review of current design and assembly J. Long, P. Barnes, J. Boissevain, J. Gomez, S. Lamoreaux, D. Mischke, S. Penttila.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
Michelle Espy SQUID NMR Signal Outline Overview of SQUIDs in EDM: present thinking - experimental design ideas - expected signal,
Preliminary HV Results in Superfluid Helium Review of HV system design J. Long, J. Boissevain, J. Gomez, S. Lamoreaux, S. Penttila LANL Amplification and.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
1 NEDM 4 He Purifier and Other Cryogenic Issues David G. Haase North Carolina State University Update on Cryovessel Engineering Evaporative Purification.
SQUID Performance in a HV Environment
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Plans for HV R&D at LANL Vacuum chamber Supply cryostat Josh Long, Indiana U. Tests in progress Control purity, contaminants, attempt T < 1.8 K Near Future.
Dielectric Strength of Superfluid Helium Under Pressure Small Pressure-Controlled Cryostat Overview Measurement Cycle Possible Breakdown Mechanisms Dielectric.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Summary of Valve Design Status for nEDM L. Bartoszek BARTOSZEK ENGINEERING 6/20/05.
NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
Valve Update  Study several stem/seat geometries (Feb)  Demonstrate He II leak tight for 3/8, 1 in. diameter with modest (~ few psi) pressure difference.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
NEDM Cost and Schedule Review, February 11, 2005 Upper Cryostat and Valves Cost and Schedule for WBS 3.2, 3.3, 3.4, and 8.2 L. M. Bartoszek D. H. Beck.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
HV Feedthrough Tests for the LBNE Meeting Status of R&D 6/26/2016HV Feed for BNL Meeting1 Hans Jostlein.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Installation of the T600 at Fermilab Fermilab, February 15,
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
MicroBooNE High Voltage System and Feedthrough MicroBooNE Collaboration Meeting Hans Jostlein, December 3,
Specifications for the Integrated Tests II Paul Huffman.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
delivered with the compressor
Installation of the T600 at Fermilab
Cryogenic behavior of the cryogenic system
T5.2: Harmonization - Material and Component Reference
MICE Meeting at RAL, Oct-23, 2005
Progress and Issues with VTS Upgrade
Teleconference ACS – FREIA 10th May 2017
LARP Vertical Test Facility
Instructions: Adding refrigerant fluid to system
Cryomodule Assembly Plan
SC1R Cold Box PDR Assembly Sequence
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

HV-SQUID Compatibility Test Study the SQUID performance in a HV environment. Study the HV breakdown –in superfluid under pressure. –using different materials for electrodes. Craig Huffer, Chen-Yu Liu, Josh Long Indiana University

Squid Performance in HV environments Physical damage Direct HV discharge hitting the SQUID chip would destroy the SQUID. Large induced current flowing in the feedback circuit could destroy components. Large induced current flowing through the SQUID could destroy the Josephson junctions. Most of you are concerned with this. However, these extreme conditions are unlikely to happen. HV ripple and micro-discharge inside the dielectric materials in electrodes, cell, etc... High frequency components could disturb the feedback circuit and cause SQUID readings to jump randomly. increase the noise level. This could be a bigger concern. Remedy: RF shield.

LHe Volume Cap 2. G10 Ground Electrode Support 3. Macor rod for gradiometers 4. HV electrode 5. Ground electrode 6. HV feedthrough (25kV) 7. SQUID feedthrough (multi-pin) 8. LHe needle valve (superfluid- tight) 9. SQUID

HV Breakdown vs Pressurization Janis liquid helium dewar 1. pump on the reservoir to make superfluid Pressurization 2. Close superfluid-tight needle valve. 3. Test probe has a bellows at bottom. It can be pressed against the bottom of the liquid helium reservoir. 4. Temperature is maintained and controlled by the superfluid outside. 5. ~5% volume change to make 1atm. to pump 17” 7”

Some design details The HV electrode is on top, to be screwed onto the end of the HV feedthrough. The ground electrode will be attached to the G- 10 sleeve via 3 screws. The HV conductor (or cable) is placed inside a SS tube, which can be evacuated. This protect the HV from breaking down in helium vapor. A lot of room below the ground electrode to accommodate different SQUIDs & pickup coils.

Cryostat Top Flange Bellows for vertical translation of probe.

Progress Currently preparing Janis cryostat. –modify components, leak checking, etc.. Design is finalized (please comment...) –Some major components (HV feedthrough, bellows) ordered. –Physics machine shop is scheduled to machine parts (electrodes). Waiting for SQUIDs and electronics to be shipped from Los Alamos. Cool down test in ~ 1 month. Preliminary results may be possible next collaboration meeting.