11 User Pays User Committee 12th November 2009. 2 Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.

Slides:



Advertisements
Similar presentations
Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Advertisements

1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Industry Shipperless & Unregistered Working Group Wednesday 18 th April 2012.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
UNC Urgent Modification Proposal 0275 Timeline.  Day 1  User raises APP Conquest Query with requested loads (BSSOQ, SOQ, SHQ) and provides warrant from.
Chubaka Producciones Presenta :.
SGN S&U Update Lisa Warnock 1 st November Agenda Data cleansing (set to dead/extinct) Shipper interaction SGN root cause measures.
Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
1 “Data Enquiry Service” Update 5 December 2011 (by )
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
Distribution Network Interruption - Initialisation 28 September 2010.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
User Pays User Group Wednesday 30 th April Today’s Agenda  IntroductionHelen Barratt  Contract and Governance – The Way ForwardAndy Miller 
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Agency Charging Statement Overview of Consultation 11 th February 2008.
AQ Review Team August 2009 Dean Johnson Operations Manager Analytical Services Susan Prosser AQ Officer John Harris AQ Administrator.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
DRSEC Update Transmission Workstream 06 November 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
User Pays User Group 8th December Agenda  Customer voting arrangements  UPUC & UPCEG ToRs  Funding change  Contract refinements register  Future.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
User Pays User Committee 12th November 2013
Allocation of Unidentified Gas Statement - Update
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
DSC Change Committee Summary – 11th July
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
User Pays Agency Charging Statement
Release 3 Scope Selection and Plans
OCC & Standard Commodity Changes
Connected System Exit Points - Update
Deferral of Retrospective Updates Functionality
AQ BTU Form – Process & Timeline 29th September 2009
DN Interruption Phase II
Actions Updates Action 0282/006 – Exclude from AQ process
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
McDonald’s calendar 2007.
Annual Quantity (AQ) 45.
Operational Update 1.
Further Considerations
2015 January February March April May June July August September
Presentation transcript:

11 User Pays User Committee 12th November 2009

2 Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management  Change Proposal Update  Modification Update  Operational Updates  IAD Replacement  AOB

3 Agency Charging Statement

4 ACS Update  Joint Office website has been updated new location for current ACS  Any questions on process please contact; 

5 Change Management 5

6 Update on Change Process  UPCO001 - IAD Transactional Charging  EQR – Out come of Customer Voting  Next Steps

7 Update on Change Process  UPCO002 - IAD Last Access Report  EQR – Outcome of Customer Voting  Next Steps

8 Modification Update 8

9 Modifications identified as potential User Pays  0209 – Rolling AQ  0231 – Changes to the Reasonable Endeavours Scheme to better incentivise the detection of Theft  0245 – Review of arrangements regarding the detection and investigation of Theft of Gas  0246B – Quarterly NTS Entry Capacity User Commitment  0248 – Meter Reading Replacement  0253 – Facilitating a Supply Point Enquiry Service for Large Supply Points  0255 – Publication of Objection Rates for LSP Supply Points  0260 – Revision of Post-Emergency Claims Arrangements  0264 – Review of industry arrangements to accommodate reduced demand at DM supply points  0270 – Aggregated monthly Reconciliation for Smart Meters

10 Operational Update

11 Telephone Service Line No of calls Service Availability (target 95% availability) Call answering (target 90% within 30 seconds) October28, %91% September28,050100%91% August25,936100%92%

12 IAD Service Line Number of Accounts Availability (Target 97% availability during core hours) October20, % September19,500100% August19,000100%

13 Report Service Line No. of reports Performance (2 and 5 business days) October119100% September7999% August85100%

14 Portfolio Reports Reports sent in the monthPerformance standard October110 September110 August 110

15 AQ Enquiries Number of AQ Enquiries processed Performance (Target process by end of second Business Day) October17,959100% September1,072100% August764,423100%

16 IAD Account Transaction Volumes Accounts Created (normal process) Bulk Password Resets NumberWithin 10 days Number Requested Completed within Month October’ %00 September’ %282 August’ %115 July’ %84 June’ %78 May’ %192 April’ %00 March’ %258 February’ % January’ %530 December’ %82 November’ %227

17 IAD Account – Deletion volumes Accounts Deleted (normal process) NumberWithin 10 daysComments October114100% September64100% August207100%

18 AOB

19 New LSO/DLSO Request Form

20 Benefits  Introduces greater security with xoserve Customer Lifecycle validating all requests for LSO/DLSO.  Incorporates IAD LSO/DLSO to the existing request form.  Allows user to specify which applications the LSO/DLSO will be responsible for.

21 New LSO/DLSO form

22 Key Dates  Proposed implementation – 1 st January 2010 The introduction of the new form was previously discussed in the September meeting and agreement is now sought to introduce the form in line with the above date.

23 Unique Sites User Pays reports

24 Unique Sites User Pays reports  To date, xoserve has provided the Unique Sites User Pays portfolio split over tabs – one per site type (NTS, RTS, Interconnector)  Data has been provided in merged cells, making it difficult to manipulate  xoserve would like to change the format to a single datasheet containing no merged cells

25 Other field changes  To replace the tabs, the site type could be indicated in a separate field  The CSEPs indicator is currently provided within the site name field  This could be provided as a separate field (Y/N) to ease identification  MPRs and datalogger AIS numbers (where applicable) are currently integrated with the site name field  These could be provided in separate fields

26 Other fields  All load data (AQ, SOQ, SHQ, BSSOQ) could be ordered to appear together  Exit zone and LDZ could be ordered to appear together  Shipper short code and name have been provided within the report to date; xoserve proposes to continue providing this data  All existing fields remain; no fields are proposed to be removed

27 Next Steps  Members are asked to consider most appropriate route for progressing this proposed change