Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014.

Slides:



Advertisements
Similar presentations
Coach Air Conditioning
Advertisements

ADX 150 – Engine Repair ADX 170 – Climate Controls
HVAC523 Soldering.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
NCSX Peer Review Mold & VPI Process for Modular Coils Presented by: James H. Chrzanowski January 15, 2003.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Reservoirs Covered in Ch. 5 of Vickers Text
HVACR312 - Refrigeration Metering Devices.
OU’s 454 reagent cooling system To extend the life of the GS20 reagents for longer than 42 flows, we found it necessary to develop an apparatus for reagent.
Preparing Agar Plates As demonstrated by Andrew Corcoran.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
FILTERING MDP. Safety and Safety Gear  When filtering from a fermentation vessel you should never use carbon dioxide to push the beer through the filter,
CONSTRUCTING A FIVE CABIN LATRINE
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
PEEM III Endstation Design Review
Micro Practical 3 PRINCIPLE AND WORKING OF AUTOCLAVE Dr. Shahzad Ali Assistant Professor Department of Wildlife and Ecology UVAS, Ravi Campus, Pattoki.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
SYSTEM COMPONENTS CHAPTER 5page 91C & 93 L. OBJECTIVES l IDENTIFY AND COMPARE THE STATE OF REFRIGERANT IN EACH SECTION OF A/C SYSTEM. l EXPLAIN PURPOSE.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Column Chromatography
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Process line for cylinder heads second half. Machines in order 1.Warehouse 2.Robot 3.Two machine centers 4.Washing machine 5.Pluging machine 6.Ringing.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Composite Manufacturing using VARTM
CAD3D Project. SketchUp - Project Create a new SketchUp project called InitialsXX where the XX are your first and last initial. Use the Rectangle tool.
CLAS12 Torus CCM Plan Forward April 18, 2014 (Rev. 5) Kashy Wiseman Luongo Elouadrhiri.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
Biodiesel Test-Batch Mini-Processor For One or Two Liters.
Air and Water Fountain Part 5. Daily Objective Air is matter and takes up space. Air pressure can move water.
Change in your CAD Project File - it happens all the time in robotics.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Twisted Racetrack Manufacturing & Metrology. Winding/metrology prototype chronology Various keystoning tests – Completed. –Established keystone effect.
C1 inspection results T. Meighan. C1 Lead Block Area Upper chill plates bowed upwards from side pressure (?) Top fingers pulled away from winding pack.
To complete installation on electronic models run one wash cycle then click the DIP switch setting no.4 to the on position DIP switch settings.
Manual Density Business Today
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Fabrication of Fishtank Reservoir ENGR 121 living with the lab.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
Congratulations! You have won one of the finest, home brake pressure bleeders available today. Sure, it looks suspiciously like an ACE Hardware bug sprayer,
1 1 Staying in Compliance: Spill and Overfill Presented by: Brent Roth OPW Retail Fueling IPECA UST Seminar 2015.
1 Modular Coil Winding Keystoning Issues NCSX Technical Meeting May 29, 2003 What is the current baseline winding? What is the problem? What are the variables.
Thermodynamics – branch of physics concerned with the study of both thermal and mechanical (or dynamical) concepts. Application: Steam Engines in 1800’s.
Say Cheese!. The enzyme activity of the rennet causes the milk to coagulate to a solid gel known as curd. The liquid whey is drained off. The curd is.
LARP Collaboration Meeting Racetrack Coil Fabrication
Modification of the 11T Dipole impregnation mould Impact on impregnation parameters Remy Gauthier,
Thomas Jefferson National Accelerator Facility Page 1 FNAL/JLab weekly meeting, April 23, 2014 Agenda  Path Forward  Status at FNAL  Status at JLab.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
Volumize3d Volumize3d Training Lesson 10 – Slicing Printing.
Discover the Dosmatic Difference Trouble Shooting your Dosmatic injector for years of service.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Automotive Heating And Air Conditioning
F I L T R A T I O N SCHOONOVER, INC..
Processing Of The Denture (Flasking)
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
HQ Coil 19 Test Impregnation
Staying in Compliance: Spill and Overfill
Fuel Supply System Service
Introduction of fuel feed system
By: JAGDEEP SANGWAN Refrigeration Basics 101.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
1 INTERNATIONAL MARITIME COLLEGE OMAN PROCESS TECHNOLOGY & SYSTEMS (TPTS & PT-TPTS) PE (TPTS & PT-TPTS) (Chapter-3) Chapter - 3 Distillation Systems Textbook.
Presentation transcript:

Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014

Thomas Jefferson National Accelerator Facility Page 2 Test Objectives Test system proposed by JLab to study the process and components on a small scale test Learn about gravity feed to the molds Learn more about resin distribution through tight spaces (vacuum loaded glass cloth) Show that peel ply in mold does not impede progress of the resin

Thomas Jefferson National Accelerator Facility Page 3 Setup Mixing/Degassing vessel Secondary Degassing/Reheating Vessel 2 Molds with same space for materials Same materials in each mold –2 layer of e-glass cloth 0.005” thick –1 layer of nylon peel ply 0.005” thick Tygon tube ¾”ID and ¼”ID Clamps for tubes to act as valves

Thomas Jefferson National Accelerator Facility Page 4 Schematic

Thomas Jefferson National Accelerator Facility Page 5 Process Summary #1 Assembly system Pump overnight to degas with molds and tanks at 60C Start a Logbook and note all actions (click HERE to view logbook)HERE Leak test with helium (not good for RTV) Do Rate of Rise tests on system –Full system –Molds independently –System w/o molds Pre-heat Parts A and B overnight in over set at 60C Mix 1liter batch of resin in bucket first

Thomas Jefferson National Accelerator Facility Page 6 Process Summary #2 Pour resin into mixing/degassing vessel and degas approximately 1 hour Complete 3 ROR on resin as it degasses –Resin continues to degass during ROR because stirring brings resin from below the surface (at high pressure) to the top (at low pressure) –Evidence is that when pumped on the minimum pressure is quickly achieved

Thomas Jefferson National Accelerator Facility Page 7 Process Summary #3 Transfer resin to secondary vessel –At start of transfer the resin did not flow from first Mixing vessel –A plug was found in the bottom of the vessel (source may have been a used fitting plugged with other type epoxy from previous use) –Plug was broken by breaking vacuum and pushing rod through the bottom tube –Because the plug created an orifice that was small and the resin flowed down hill into a low pressure tank it further (boiled/outgassed) To view the transfer and bubbles in the tube click HERE HERE

Thomas Jefferson National Accelerator Facility Page 8 Process Summary #4 Start transfer to Molds –Control mold pressure by closing the valve to the pump opening it once in a while to re-pump as needed to keep the pressure between 3 and 8 torr during filling –Molds a few inches below the Secondary vessel –Resin flow slowly but steadily in ¼”ID tube –Resin race tracked though perimeter groove –Adjust relative height between 4 and 24” below tank to adjust flow rate into molds To View start of resin transfer click HEREHERE

Thomas Jefferson National Accelerator Facility Page 9 Process Summary #5 Slow resin flow to allow wicking –A characteristic dimension was noted that the width of the wicking was the same for both the slotted mold and the plain mold –Flow to molds start at 12:02 from logbook 12:11 (9 minutes) 12:28 (26 minutes)

Thomas Jefferson National Accelerator Facility Page 10 Process Summary #6 After much time both molds fully race-tracked 13:08 (1 hr 6 minutes) 12:48 (46 minutes)

Thomas Jefferson National Accelerator Facility Page 11 Process #7 Before backfilling we took fill rate of the plain mold We got a flow of ¾” height in ¾” ID tube in 3 minutes thus 2cc/minute If the flow to the second mold were the same then the total would be 4cc/minute This is for a ¼” ID tube 6 ft long with 2 ft of head Scaling to a ¾” ID tube 6 ft long with 2 ft of head we get 3 to the 4 th power so 81 x more flow thus 324 cc/minute – NO PROBLEM with gravity filling from degassing vessel to mold

Thomas Jefferson National Accelerator Facility Page 12 Process Summary #8 Collapse the dry void with resin from the outlet tubes To see the first pressurization cycle click HEREHERE

Thomas Jefferson National Accelerator Facility Page 13 Summary ROR tests were more sensitive to determine leaks and Outgassing level Mold at 3 to 8 Torr was sufficiently HIGH pressure to keep resin from boiling in molds and sufficiently LOW to allow full collapse of dry sections of coil Grooves in mold worked well to distribute resin much more quickly throughout the coil (90 degree bevel groove 3mm wide and 1.5mm deep is sufficient spacing between groove should be ~2.5”) Wicking with mold covers collapsing on the fiberglass cloth is very slow and gets slower as the mold fills Overnight the Polycarbonate covers popped off the aluminum and the molds drained

Thomas Jefferson National Accelerator Facility Page 14 Lessons learned Flow test through the inlet and outlet tubes to be sure lines are not blocked during setup Do not count on RTV to mechanically restrain the clear mold cover Install catch pan below molds just incase there is a leak

Thomas Jefferson National Accelerator Facility Page 15 Possible Future work in small molds Add sight glass tube at center of molds to see how they fill with and w/o channels ** –This would be a way to see the resin progress through the coil at center turns since the coil mold plates are steel ( Use ¼”ID tygon to limit the amount of epoxy needed to fill tube since its source will be limited by wicking and or during the backfilling process) –Put in strips of 0.003” glass to see if that works like the channels * Tests could be done with soap to save time ** One could even pump on just those tubes to draw resin in to coil center if needed

Thomas Jefferson National Accelerator Facility Page 16 Addendum We decided that we must be able to add flow distribution channels to the molding process and that we needed to be able to visually inspect the coil impregnation. So how to do this. VPI in vacuum bagging often uses media that increases flow path for resin. For our application we need a “stiff” material that allows flow. Industrial Netting produces an extruded polypropylene mesh Samples were obtained and visualization tests confirmed it as an easy way to add flow channels to the process and to take up the extra space in the mold since the copper was being removed. Test with resin and heat confirmed its acceptability. It was tested with 70cm molds and finally when Bleeder B was used it showed to be an acceptable matial in all aspects