MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.

Slides:



Advertisements
Similar presentations
Air and Water Chiller Basic Class
Advertisements

1 CM24 – 2 nd June 2009 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Daikin Altherma™ Troubling Shooting
André Augustinus 16 June 2003 DCS Workshop Safety.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen R&D System Operational Procedures and Test Plan M Courthold.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
MICE hydrogen review Commissioning, testing and operations.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
CM26 – 26 th March 2010 Step IV: Liquid Hydrogen Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
MICE collaboration meeting RAL 28 October 2004 Absorber R & D Plan by Wing Lau – Oxford University.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
MICE Hydrogen System MICE Collaboration Meeting, CERN, 29 March-2 April 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
CHE 185 – PROCESS CONTROL AND DYNAMICS DCS AND PLC FUNDAMENTALS.
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
Mechanical Safety Systems and DSEAR Compliance
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Meeting October 2004 – Coseners House.
1 Air Conditioning Pressure Switches. 2 High Pressure switch Used to protect the compressor When condensing temp gets too high Reads High Side Pressure.
Patrick Thornton, SNS/FPE June 9, 2008
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
The MICE Hydrogen System Summary Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford Appleton Laboratory.
MICE CM30 7 th July 2011 Liquid Hydrogen Delivery System M Hills (STFC, RAL) T Bradshaw (STFC, RAL) M Courthold (STFC, RAL) S Ishimoto (KEK) A Muir (STFC,
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
 P&I Diagram  Gas Room Controls  Gas Panels Controls in the Hall  GUI  Oxygen Sensor Cart.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
1 Liquid Hydrogen R&D test report Video Conference – 23/08/12 S Watson P Warburton M Courthold.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
1 Daya Bay RPC Gas Safety System - Gas Cabinet Test Report Changguo Lu, Kirk McDonald Princeton University (October 11, 2009)
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
CISSP Common Body of Knowledge Review by Alfred Ouyang is licensed under the Creative Commons Attribution-NonCommercial-ShareAlike 3.0 Unported License.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
LCD Wiring Diagram Presentation B / B.
1 Liquid Hydrogen R&D test report CM34 – 17/10/12 S Watson P Warburton M Courthold.
Danish Ali Nawaz 1CLIC workshop 2016 Danish Ali NAWAZ, BE-ABP LEETCHI: Drive Beam Electron Source Automation Control.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
S A Griffiths CM42 June 2015 Electrical & Control.
Hydrogen System Update
Liquid Hydrogen Infrastructure Update
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
MICE Safety Review Meeting 4th Oct 2011 PJ Warburton - Daresbury Lab
LCLS-II 2K Cold Box Controls Design Review
ATLAS Thermosiphon Electrical Distribution and Run Modes
SC1R Cold Box PDR Controls
Status of Hydrogen System Development
Electrical Safety Standards
Charge 2. Equipment Protection 3. Definition and Documentation
Operation of Target Safety System (TSS)
Vacuum Control System for Monolith Vacuum
Presentation transcript:

MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab

Control System Functions Operate Valves Monitor - Temp Pressure, Flow & Vacuum Control - Vac Pumps, Heater Chiller & Cryo-Cooler Run Control Sequences Gas Detection System Extract System UPS

Control System Functions

Control PLC Omron CJ1M Modular PLC with Ethernet Existing Software for Link to EPICS NS8 Programmable Terminal (HMI), 8.4 inch Touch Screen with Ethernet Data logging & trending Key Switches on Selected Functions

Control System

Valve air solenoids mounted on the outside of the Gas Panel Enclosure Valve limit switches are intrinsically safe and can detect short circuits and broken wires, Pressure transducers are 4-20mA giving broken wire detection. The PLC provides start / stop signals to pumps; manual control is also available. Note:- PLC status does not affect pump operation i.e. the pumps do not go off if the PLC does.

Control System

Hydrogen Control Room Layout 4 Control Cabinets 1 per System plus Detection & Extraction UPS Distribution Vac Pump Contactor Panel

Intrinsic Safety (Ex i) Limit energy in electrical circuits to less then the value required to ignite Hydrogen (20 micro 25%) All Circuits in the Gas Panel Temp & Level sensors in Cryostat Cryostat Heaters are protected by pressure interlock (SIL Rated)

Gas Detection System Oliver Tocsin 920 All Detectors and Beacons paired on separate bus loops Alarm at 50% LEL Linked to Extraction System to increase speed on detection of leak Annual Testing / Maintenance by contractor

Extraction System Two Inverter controlled 7.5kW Fans mounted on the roof One fan on its own can providing the flow rate required to deal with a leak. (DSEAR rec = 450 air changes per hour). Differential Pressure Sw & Inverter Current feedback to prove operation Normal running at 100 ACH with increased speed on detection of leak

UPS 2 Hour UPS back up of Fans & Control System PLC, Heaters, Vac Gauges etc 50 min to boil off LH2 In Cryostat Annual Testing / Maintenance by contractor

Safety Functions (Non SIL) Operation Of The Ventilation System On Detection Of A Hydrogen Leak – Hardwired Shut PV20 If There Is Pressure Rise In The Cryostat During Operation Cryo Vacuum let up to boil off gas if heaters fail / can not be used Permit Key issued when Gas Panel Enclosure is complete i.e. All panels fitted to Prevent Access When Hydrogen Present

Other Control Functions A Shut-off Facility For The Hydride Bed Heater/Chiller On Detection Of Bed Overpressure Cryocooler Shut-off If Temperature Drops Below Hydrogen Freezing Point (14k) or Heaters Faulty

Control Sequences Helium Purge Cryostat Vacuum Helium Fill Helium Empty H2 Line Purge Hydrogen Fill Hydrogen Empty Diagnostic / Test

Questions