Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.

Slides:



Advertisements
Similar presentations
OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
Advertisements

Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Welcome to Pinal County. Greg Stanley Pinal County Public Works AACE Regional Conference Oct 1-3, 2008 The Three C’s of Hunt Highway.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
S.R. 49 Bridge Rehabilitation over Kankakee River Thursday, September 12, :30 p.m. Presentation Wheatfield Public Library Wheatfield, Indiana.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
U.S. 150 / S.R. 56 Roadway Rehabilitation Project Thursday, August 22, :00 p.m. Presentation Orange County Community Center Paoli, Indiana.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
STA Safety Project PID #76439 December 12, 2006.
بسم الله الرحمن الرحيم AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Evaluation, Design and Redesign Beit Wazan and.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Geometric Design: General Concept CE331 Transportation Engineering.
Maintenance and Temporary Traffic Control
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Value Engineering Study and Risk Assessment
Project Management Team Meeting #3
Bill Good Chief Operations Officer
Clinton Street Bridge over the Maumee River
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Issaquah-Fall City Road
Geometric Design: General Concept CE331 Transportation Engineering.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
S.R. 26 Road Rehabilitation in Clinton County
Walker Street Reconstruction Project 25% Design Public Hearing
Louis E. Feagans, P.E. Statewide Technical Services Director, INDOT
Monterey County Project Report for Measure X Expenditures
Presentation transcript:

Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015

Introductions Jennifer Fitch, P.E. VTrans Project Manager Laura Stone, P.E. VTrans Scoping Engineer Carolyn Carlson, P.E. VTrans Senior Project Manager

Purpose of Meeting  Provide an understanding of our approach to the project  Provide an overview of project constraints  Discuss alternatives that were considered  Provide an opportunity to ask questions and voice concerns  Foster support for the recommended alternative

Location Map

Bridge 12 Project Location

Meeting Overview  VTrans Project Development Process  Project Overview – Existing Conditions – Alternatives Considered – Selected Alternative  Maintenance of Traffic  Schedule  Questions

VTrans Project Development Process Project Definition Project DesignConstruction Project Funded Project Defined Contract Award  Quantify areas of impact  Environmental permits  Develop plans, estimate and specifications  Right-of-Way Process (if needed) Initiated  Identify resources & constraints  Evaluate alternatives  Public participation  Build Consensus

Who are you representing? A.Municipal Official B.Resident C.Emergency Services D.Local Business E.Independent Organization F.Other

How often do you use this segment of VT Route 116? A.Daily B.Weekly C.Monthly D.Rarely E.Never

How often do you walk over the bridge? A.Daily B.Weekly C.Monthly D.Rarely E.Never

How often do you bike over the bridge? A.Daily B.Weekly C.Monthly D.Rarely E.Never

What is your reason for attending this meeting? A.Specific concern B.General Interest C.Live in close vicinity D.Other

Project Overview  Existing Conditions  Alternatives Considered  Recommended Alternative

Description of Terms Used Beams (Superstructure) Deck Abutment (Substructure) Bridge Rail Cross Section of Bridge

Existing Conditions – Bridge #12  Roadway Classification – Minor Rural Arterial  Superstructure – 89’ long Steel Beam Bridge  Substructure – Skeletal Abutments  Constructed in 1955  Ownership – State of Vermont

Existing Conditions – Bridge #12  The existing concrete deck is in poor condition. There have been pop-outs in the past, and future deck pop-outs are possible at any time.  Deck geometry is substandard.  The roadway is not banked sufficiently for the horizontal curve present.  Bridge railing is substandard.

Existing Conditions - Bridge #12  Deck Rating4 (Poor)  Superstructure Rating7 (Good)  Substructure Rating6 (Satisfactory)  Channel Rating7 (Good) Continual deck deterioration with large delaminations and exposed rebar

Existing Conditions - Bridge #12  Bridge Railing – Not Crash tested – Deteriorated posts, Exposed Reinforcing Steel Bridge Railing

Looking South Over Bridge Existing Conditions - Bridge #12  Substandard Horizontal Curve  Substandard Deck Geometry – Existing: 11’/4’ – Standard: 11’/5’

Existing Conditions

 ADT of 2,800  DHV of 320  % Trucks: 15.7  Design Speed of 50 mph  Archaeological resources in 3 quadrants Design Criteria and Considerations

 No Action – Additional maintenance required within 10 years  Rehabilitation – Deck Patching – Deck and substructure patching with anodes – Shortest design life – Substandard width and railing  Rehabilitation – Deck Replacement – Longer lifespan compared to patching – Substructure patching with anodes – Width and railing brought up to standard  Full Bridge Replacement – Longest design life – Meets all geometric criteria Alternatives Considered – Bridge #12

Selected Alternative - Bridge #12  Replace existing deck – Bridge widened by 1 foot on each side to meet standard – New approach railing and bridge railing – New joints – Meets all geometric criteria – 40 year design life – Utility relocation will be needed – No ROW needed

Proposed Typical Sections  Proposed Bridge Rail to Rail = 32’ (Existing is 30’)

Proposed Layout

Maintenance of Traffic Options Considered  Road Closure with Offsite Detour – Signed by State, regional detour route: 61.3 miles end-to-end  Phased Construction – Minimal impacts to adjacent properties, wetlands, and wooded areas – Longer construction duration – No ROW needed  Temporary Bridge – One-way with signals, downstream – Biggest impacts to ROW, adjacent properties, and archaeological resources

Phased Construction  One lane, alternating, with a traffic signal  Existing is wide enough to complete deck replacement with 2 phases  No ROW needed (Picture from US Route 7 Bridge 184 in Highgate) Selected Maintenance of Traffic

Phase 1 Layout

Phase 2 Layout

Which would you be most concerned about? A.Construction delays on VT Route 116 B.Bridge Aesthetics C.Environmental Impacts D.Recreational Impacts E.Other F.Not really concerned

Which design aspect is the most important to you? A.Shoulder width/bicycle accommodations B.Aesthetics - Bridge Railing C.Construction year D.Construction Duration E.Cost F.Other

Preliminary Project Schedule  Construction – Summer 2017 or 2018

Project Summary  Replace deck: – Phased construction 2 Phases – Bearing replacement as necessary – Substructure concrete patching as necessary – Utility relocation will be needed – No ROW needed

Did you find this presentation to be? A.Too technical in nature B.Too simplified C.Just about right D.Not much use at all

Do you find the recommended scope of work satisfactory? A.Yes B.No

Bristol BF 021-1(33) Questions and Comments VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015 For more information: 

Bristol BF 021-1(33) Alt 1Alt 2Alt 3 Deck PatchingDeck ReplacementFull Bridge Replacement Short Term Lane Closures a. Offsite Detourb. Phasinga. Offsite Detourb. Phasing c. Temporary Bridge Total Project Costs (including Engineering and Contingencies) $631,750$1,077,450$1,432,000$2,805,000$3,219,000$3,120,040 Project Development Duration 2 years 4 years Construction Duration 3 months 8 months6 months9 months18 months Closure Duration (If Applicable) N/A10 daysN/A4 weeksN/A Geometric Design Criteria Substandard widthMeets Criteria Alignment Change No Utilities No Change Possible Relocation Relocation ROW No Yes Design Life 15 Years40 years 80 years80 Years Alternatives Matrix

Additional Considerations  None for this project