Capacity mechanisms in Europe If there is to be a capacity mechanism, then what is the appropriate design? 28 September 2015 Robin Cohen.

Slides:



Advertisements
Similar presentations
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Advertisements

Gender Perspectives in Introduction to Tariffs Gender Module #5 ITU Workshops on Sustainability in Telecommunication Through Gender & Social Equality.
The Single Electricity Market in Ireland
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
1 Capacity mechanisms - IFIEC position June 12 th 2012.
Legal Framework, Investment Opportunities and Technical Innovation in the Electricity Sector Security of Supply through competitive markets: Design of.
Progress with coupling FUI and CWE region
The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
SESSION 3 – CAPACITY REMUNERATION Coordinating European Capacity Mechanisms: Which Way Forward? Fabien Roques EPRG Spring Seminar Cambridge – 16 May 2014.
Electricity Interconnectors in GB
Resource Adequacy in PJM
Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.
CREE Site Visit Oslo, September 19, 2013 Who Should Pay for Transmission? Nils-Henrik M. von der Fehr.
1 MondayTuesdayWednesdayThursdayFriday January February March April May
Congestion Management by distribution FEBEG POSITION Meeting FEBEG-VREG ( )
1 Resource Adequacy and Market Power Mitigation via Option Contracts Hung-po Chao and Robert Wilson EPRI and Stanford University Presentation at POWER.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Comments on “A Capacity Market that Makes Sense” James Bushnell University of California Energy Institute.
Balancing regulation and liberalisation in electricity markets David Newbery IAEE European Conference Vienna 9 September 2009
The Convergence of Market Designs for Adequate Generating Capacity Peter Cramton and Steven Stoft 24 March 2006.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
The California energy crisis Introduction (Wolak March ‘01) –Wholesale: averaged $33 MWH in 1999, $116 MWH in 2000, $310MWH Jan –Natural gas $3-$4.
THE CHALLENGES OF EUROPEAN ENERGY SECURITY Jiří Feist, CEZ Group.
RISK & CAPACITY INVESTMENT INCENTIVES IN ELECTRICITY MARKETS Peter Jackson Department Of Management University Of Canterbury.
An Overview of the Australian National Electricity Market Brian Spalding Chief Operating Officer.
World Forum on Energy Regulation IV Athens, Greece October , 2009 "Reducing Regulatory and Technological Barriers to Demand Side Participation“
20 September 2015 GAZ DE FRANCE ESS Introduction of Gas Reserve Arrangements Mark Bailey Gaz de France ESS.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Market design and market power in wholesale electricy markets Guido Cervigni IEFE-Bocconi University, Milan CEEM – Summer School on Economics of electricity.
For discussion purposes only Financial Transmission Rights: Design options Presentation to Electricity Commission 2 September 2009.
Electricity trading in emerging markets Vienna Economic Forum Tirana, Albania 8-9 June 08 1 EXAA 2008.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
Creating the global research village EU Procurement Nicola Anson, DANTE TF-MSP Meeting, 1 March 2011.
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Assessing Risks/Challenges in Energy Cooperation Christopher Findlay Asia Pacific School of Economics & Management The Australian National University Presented.
Securing competitive energy for industry A “target model” on market integration from the perspective of industrial energy consumers Florence Forum Rome,
Conceptual Tools The creation of new and improved financial products through innovative design or repackaging of existing financial instruments. Financial.
Chapter 17 Pricing and product mix decisions. Major influences on pricing decisions §Customer demand and reactions §Competitor behaviour §Costs l price.
Capacity mechanisms in Europe The fundamental issues behind the ongoing sector enquiry Session 2 - If a capacity mechanism, which design is most appropriate?
Security of Supply Comments P. CAPROS, RAE Greece.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Credit Risk transfer OECD-IAIS-ASSAL Fourth Conference on Insurance Regulation and Supervision in Latin America Punta Cana, Dominican Republic, May 6 th.
The Operation of the Electricity Markets Brent Layton Talk at EMA Central Electricity Forum 6 th April 2006.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
What Was Learned From the 2015 Transition and Base Residual Auction Results? October 13, 2015 OPSI Annual Meeting CP Auction results – A DR perspective.
IFIEC EUROPE 1 ERGEG Consultation 30 June Brussels Industrial customer perspective Peter Claes President - IFIEC Europe.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Power Trading Financial Markets Electricity. Triple Point Technology2 Current Situation… GenerationTransmissionDistributionConsumers.
Wholesale Electricity Markets: Opportunities and Challenges Howard HaasUSAEE October 27, 2015.
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
Electricity Markets Simon Watson. Overview UK as exemplar The state-owned Electricity Supply Industry The Electricity Pool Hedging Your Bets! Deregulation.
- 1 - Presentation reference Demand Side Bidding - an IEA Development Project for Competitive Electricity Markets Presentation to Metering Europe 2002.
NYISO Capacity Markets: Function, Performance, and Future Presented to: Joint Technical Conference on New York Markets & Infrastructure Docket No. AD
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
Alternative Transactive Electricity Market Models
Electricity Wholesale Markets: Designs for a low-carbon future
Powering Towards Clean Energy in Europe
Generation Expansion Daniel Kirschen
Market Design in New England
Back-up flexibility for this winter Slow R3 non-reserved power
Tom Welch October 18, 2002 Boston, Massachusetts
What happened in Portugal’s recent record-breaking solar auctions?
Presentation transcript:

Capacity mechanisms in Europe If there is to be a capacity mechanism, then what is the appropriate design? 28 September 2015 Robin Cohen

2 What are the main CRM design choices? 1 How well do these designs fix the ’problems’ with an energy-only market? 2 What are some of the lessons from experience with CRMs? 3 How should Europe select its preferred market design? 4 Which form of capacity market design is most appropriate for Europe? Outline of Presentation

What are the main CRM design choices? Price-based CRM  A capacity payment ‘adder’ to an energy- price is a way of ‘fixing’ scarcity pricing in an energy-only market: (LoLP * VoLL- SMP)  Capacity payments do not directly result in a target level of capacity  So, if it is concluded that scarcity-pricing in an energy-only market is not effective at delivering reliability, then a capacity payment ‘adder’ to an energy- price is also not likely to be considered an effective mechanism Centralised auction vs. Decentralised obligation  This is the critical choice assuming it is determined that energy- only markets cannot efficiently ensure system reliability to an appropriate security standard Targeted CRM  Targeted reserves (“Strategic Reserves”) are usually segregated from the energy-only market – otherwise they would constitute balancing services  Principal role of targeted reserves is to provide a ‘back-stop’ to the energy-only market rather than an entry-support mechanism for all new generation capacity  Where support for all new capacity becomes necessary, segregation from the energy market is no longer possible and the targeted reserve becomes a means of discriminating against existing capacity Capacity Remuneration Mechanisms (CRM) Volume Based Targeted Market-wide Price Based Strategic Reserve Capacity Payment Capacity obligation Capacity auction Targeted Reserve

Decentralised  Market for ‘certificates’ required to provide efficient capacity price  Opportunity for more tailored solutions with bi- lateral contracting  Risks of excess/deficient capacity borne by Suppliers Centralised  Auction design required to deliver efficient capacity price  Central planners may be biased towards over-procurement  Costs are socialised and risks of excess/deficient capacity passed through to Consumers How well do the main design options fix the ‘problems’ with an energy-only market?  Vertical integration of suppliers (self-supply) may limit capacity market liquidity  Suppliers may be reluctant to contract sufficiently long-term  Centralised auctions with standardised contract specification promotes transparency and capacity market liquidity  Incentives for demand-side management on Suppliers  DSR can participate directly offering contracts/certificates  Requires standardised approach to DSR  Bi-lateral contract determination limits scope for ‘gaming’ capacity/certificates depending on market depth/liquidity  ‘Imbalance’ penalties required  Auction rules can constrain ‘gaming’ capacity while promoting market depth/liquidity  Penalties for capacity non-performance required: reliability options may also mitigate potential energy market distortions Incentives for new entry – ‘the missing money’ Illiquid contract markets Demand-side participation Problems with ‘gaming’

Trafford Power, a new 1.6 GW CCGT cleared the auction at a price much lower than would have been expected under average new build cost assumption GB 2014 CM Auction Ex-post bid curve analysis* Source: CRA analysis based on National Grid’s published pre-qualification results. * Note that there is no information available to re-construct the actual bid curve of the clearing round. The curve above has been constructed based on our ex-ante analysis of costs and revenues, modified where necessary with information on the generators that cleared and did not clear the auction. Almost 1 GW of new embedded generation cleared the auction at a price lower than expected. This may be driven by bullish assumptions on various different revenue streams (e.g. STOR, triad management, etc.), or low capital cost assumptions. What are some of the lessons from experience with CRMs? ■Capacity markets, including centralised auctions, can attract innovative offers ■The cost of capital for generators is impacted – and this needs to be set off against the associated risk transfer to consumers

What are some of the lessons from experience with CRMs? Key Problems ■Vertical demand curve led to volatile, ‘bi-polar’ capacity prices ■Failed to support contestability of new entry in generation due to limited contract maturities ■Collateral requirements inhibited contracting ■Lacked locational requirements ■PJM CRM has evolved from capacity credits purchased by Load Serving Entities to the centralised Reliability Pricing Model

Bidding restrictions due to market power concerns Large plant retirement Increase in CONE; new trans. rules Significant new DSM Coal retirements and transmission constraints result in new plant with price-setting power at CONE New imports and strategic bidding below Net CONE dropped prices Rule change removed price floor, plants retired as a result, and new entry set price What are some of the lessons from experience with CRMs? ■Centralised auctions are complex and tend to involve multiple, successive rule changes ■Longer-term capacity prices are also difficult to anticipate but have been successful in supporting new entry

8 Stress Events ■Rules required to ensure flows are consistent with capacity contract obligations and performance during coincident stress events Performance incentives ■Different approaches to non-performance penalties may drive differences in capacity offers Product Definition ■Basing product on capacity availability (as opposed to delivery) supports merit order operation cross- border ■But availability needs to be assessed in relation to energy market offers Interconnector Capacity Allocation ■May depend on mechanism: continuous capacity pricing with certificates would support direct selling, while centralised capacity design may require implicit interconnector auctions De-rating/ Qualification ■Different approaches to de-rating/ qualification would make the same capacity worth more/less in different jurisdictions only because of regulation ■Interconnector de-rating to/from neighbouring countries needs to be consistent, appropriately reflecting risk of coincident stress events Are there minimum harmonisation requirements between capacity markets – some key considerations

How should Europe select its preferred market design? Decentralised ■Competitive underlying market structure or effective regulation -Vertical Integration not inhibiting generators access to certificates/capacity contracts ■Market for ‘certificates’ develops to support competitive new entry -Prices reflecting supply/demand -Availability of ‘long-term’ contracts ■Appropriate penalties for non-performance Centralised ■Effective constraints on any central planning bias to over-procurement -Including ‘excessive’ long-term contracts ■Limiting the tendency to rule changes to avoid ‘regulatory instability’ -Providing for some innovation in contracting/generator requirements ■Appropriate penalties for non-performance Some key conditions for success

10 London Tel +44 (0) Fax +44 (0) Bishopsgate London EC2M 3XD United Kingdom Robin Cohen direct mobile Copyright 2015 Charles River Associates