Low-Level RF of BEPCII Sun YI IMAC’07 May. 11, 2007 IHEP.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Cavity tuning etc Cryogenics Cavity tuning Tuner Input couplers 6 th October 2009 video meeting K.Nakanishi.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Progress and Plan for Superconducting RF Cavity RF Group.
Superconducting Cavities for Super- KEKB S. Mitsunobu.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Progress of SC RF Cavity during the RF Group May 10, 2007.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
CESR-B Cavities at the CLS Operating Experience J. Stampe, M. deJong, C. Regier, X. Shen.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
First Mini-workshop on IHEP 1.3GHZ SRF LLRF and Tuner Sun YI (孙 毅) Accelerator Center, IHEP June 10, 2009.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Anders Sunesson RF Group ESS Accelerator Division
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
5th BEPCII IMAC Meeting May , 2007 Progress of BEPCII Storage Ring Construction Ma Li May 10, 2007.
Positron Source Relocation Damping 10Hz S. Guiducci (INFN-LNF) BAW2, SLAC Tuesday 18 January 2011.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Nov. 28, 2003RF System Overview, K. Akai1 RF System Overview Contents: ◆ High beam current and measures ◆ Construction ◆ Damping ring RF system ◆ Crab.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
1 Consequences of RF system failures during LHC beam commissioning T.Linnecar AB-RF.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
KEKB crab RF architecture & controls K.Nakanishi KEK Dec. 16, 2010 LHC-CC10 1.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Operation Status of the RF Systems and Taiwan Photon Source
JPSP-CAS co-operation in Superconducting RF of BEPCII
Areal RF Station A. Vardanyan
Cryomodule test stand at ESS site
at STFC Daresbury laboratory
Cryogenic behavior of the cryogenic system
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Failure analysis at BEPCII
Test plan of ESS HB elliptical cavity
Replacement of coupler and recovery of cavity for BEPCII
Test plan of ESS HB elliptical cavity
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
XFEL cavities and cryomodules measurements at AMTF
BEPCII RF POWER SOURCE AND INPUT COUPLER
Jefferson Lab Low Level RF Controls
Superconductivity in the BEPCII Performance
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
CEPC RF Power Sources System
Test plan of ESS HB elliptical cavity
LHC-CC09 workshop LHC Crab Cavity Workshop, jointly organized by CERN, EuCARD-ACCNET, US-LARP, KEK, & Daresbury Lab/Cockcroft Institute CERN, September.
Test plan of ESS HB elliptical cavity
Construction and First Coo-down Test of cERL Injector Cryomodule
RF Techniques and Developments at SSRF
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Cryo-ops 2018,Beijing,IHEP
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
The spoke CM tests at FREIA
Cryogenic behavior of the magnet
CEPC SRF Parameters (100 km Main Ring)
Summary of the maximum SCRF voltage in XFEL
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Low-Level RF of BEPCII Sun YI IMAC’07 May. 11, 2007 IHEP

Review the past one year The Hardest and key time was from Apr.06 to Dec.06 West LLRF was used for the horizontal test and the Q0 measurement at the test room; All the Q0, both East and West SCC, are higher than the design target. ( June~Sep. 2006) The first time on the high power test of SCC in China made a big challenge on the LLRF LLRF installation 、 cabling 、 and calibration (Mar.~Oct. 2006) Commissioning 2 stations of SRF ( Oct.~Nov ) The East station join in the beam commissioning ( Nov. 2006) SR run with only East station ( Dec ~ Feb. 2007) West station was used for the e+ ring commissioning ( Feb. 2007) Two stations have been used for physic collision run ( Apr. 2007)

During the past one year, 2 LLRF stations have been finished, installation 、 cabling 、 calibration 、 high power test and Q0 measurement 、 commissioning SRF, now e+/e- beam run perfectly.

God and the Double Interlock prevent SRF from damage High power INTL: cooling water & wind 、 temperature 、 Klystron & circulator, etc. LLRF INTL: quench 、 arc 、 RF power limitation 、 vacuum 、 cryogenic 、 tuner , etc.

Calibration Vc by 3 methods Determine Vc by RF forwarding power P+ R/Q=95.3 Q L ≈2E+5 P+=13kw →Vc=1MV Confirm Vc by RF field inside the SCC Q15D≈1.09E+11 P15D=90mw → Vc=1MV Calibration Vc by synchrotron oscillation frequency measured result: fs=22.3KHz at Vc=0.6MV

Beam and RF power matched in a typical SR run

Vc oscillation result in the beam trip by LLRF 60mA e- lost at Dec.4, 2006 RF voltage recovered and the oscillation disappeared after the beam lost Vc=0.6MV, the oscillation period=3ms After adjusting the ALC feedback loop parameter, this problem was cured, the beam current can be increased to 200mA in Dec.2006 This is not the Robinson instability, I still set the cavity frequency detune angle=0 degree till 200mA

First high power test of #2 SCC at June 06 Apr 29~May 11 finished the room temperature RF aging to coupler 150KW May 23 purify GHe May 30 cold down SCC 、 June 7 LHe level=46% 、 June 13 level=95% June 1~18 LLRF commissioning with Klytron 、 calibration RF power June 19 LLRF test the frequency tuner and piezo for cavity June 20 RF aging on the coupler 100kw 、 cavity detune at 4K temperature June 21 quench protection test 、 tuning the cavity June 22 detune±1KHz 、 ±45 0 、 cavity frequency locked 、 measured Q L =2.1E5 June 23 first reached 1MV 、 calibration Vc 、 RF power 、 setting LLRF loops June MV 、 measurement Q0=1×10 9 June 25 LLRF test the RF pulse aging 、 5 radiation sensors test OK June 26 Sino-Japan confirmed the safty and the Vc calibration June MV first quench happened June MV 、 36.5KW 、 radiation 32mSv/hr June 29 reached 2MV in the first time June 30 RF pulse aging, at 2MV measurement Q0=5.4×10 8 July 1 measureQ0 at 1.8MV 、 1.5MV 、 1.4MV 、 1.3MV July 3 warm up the #2 SCC July 11 #2 SCC reached room temperature

Using LHe consumption to measure Q0 Function Vc—RF voltage P C —RF power consumed by the cavity wall P totalloss —the whole module heat loss under a Vc P staticloss —cryostat heat loss without RF field P heater —the heater power inside the cryostat Liquid Helium parameters: at 1.2bar 、 4.2K liquid Helium→Gas potential heat=19.4 KJ/Kg LHe proportion gravity = 122Kg/m 3 after closing the input valve, LHe level will be reduced from 96% to 85% within a time LHe volume vs level = 2.73Liter/1% (roughly) with a given Vc, to determine the P C by the reducing of the LHe

First measurement of Q0 for #2SCC Vc—over 2MV 、 heater=0w 、 LHe level=red

High power test and Q0 measurement

RF pulse aging to increase the quench Vc and reduce the radiation before the aging: quench happened at 1.7MV, radiation 35mSv/hr after RF aging: quench at 2MV, radiation=10mSv/hr at 1.7MV At 2MV , the radiation intensity maybe 300~500mSv/hr ( over the meter range )

Summary 1) West LLRF finished the high power test for #2 & #1 SCC ( June~Sep.) at 2MV: Q0=5.8E8 (East SC) Q0=1E9 (West SC) Vacuum gate valves were not damaged by the dark current 2) East LLRF joined in the beam run at Nov.2006 ( on time) 3) East station was dedicated the SR run ( Dec.06~Feb.07) reached e- beam ~64kw 4) West station was put in the e+ ring commissioning ( Feb ) reached e+ beam ~18kw 5) frf=499.8MHz±14KHz were shifted by 0.2KHz step without beam loss 6) fs 、 φs 、 Vc 、 and RF power are matched 7) RF power limitation at LLRF were released over 80KW ( Apr.2007 ) LLRF will be test under the heavy Beam loading in the Thanks to Prof. K. Akai, T. Furuya, S. Mitsunobu for help. Thanks to Dr. Wang Chaoen of TLS, and Dr.Zhao zhentang of SSRF for the useful discussions. Thanks to Prof. S. Kurokawa for pushing on the co-operation. Thanks every expert and colleague