South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.

Slides:



Advertisements
Similar presentations
SOUTH ORANGE COUNTY REGIONAL RECYCLED WATER Orange County Business Council Infrastructure Committee May 13, 2014.
Advertisements

Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant.
Presented by: Ronald O. Nichols LADWP General Manager
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Water for Texas 2012 State Water Plan. Water Planning: Legislative Response to Drought  Late 1950s Drought of Record – 1957: Creation of TWDB – $200.
Water Conservation in the San Diego Region Bill Jacoby San Diego County Water Authority North Bay Water Association April 2, 2004.
Presented by Chris Stone Assistant Deputy Director Water Resources Division.
California Recycled Water Plan California Recycled Water Plan A comprehensive approach to California’s long-term water supply By Gregory B. Ryan and Meagan.
San Gabriel Valley Water Forum August 28, 2012 San Gabriel Valley’s Water Supply A Plan for the Future San Gabriel Valley’s Water Supply A Plan for the.
Bruce Moore, Manager Colorado River Division Southern Nevada Water Authority July 28, 2010.
Presented by: Kevin J. Spencer, P.G. R.W. Harden and Associates, Inc. Benefits and Challenges of Developing Brackish Groundwater Supplies WATER Supply.
CMUA Legislative Briefing February 26, Regional water wholesaler 26 Member Agencies 6 counties Serving approximately 19 million residents 5,200.
MSSC 2011 Annual Salinity Summit Charles Ahrens Vice President / Water Resources and Conservation Challenges in Brackish Groundwater Desalination Project.
The Santa Ana River Watershed Program Drought Proofing the Region and Enhancing the Environment Martha Davis, Inland Empire Utilities Agency April 2000.
Carlsbad Desalination Project
Overview of Indian Wells Valley Hydrogeology and Management Presenters.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
1 South Orange Coastal Ocean Desalination (SOCOD) Project, Ocean Desalination Costs and Recent Public Opinions November 2011 Status Update Karl Seckel,
Seawater Desalination and Water Supply Reliability in Marin County Louis Armstrong, URS Corporation.
WaterSMART Basin Study Program. SECURE Water Act Section 9503 Directs the Secretary to establish a climate change adaptation program which includes –Assess.
1 Recycled Water Program for the City of Los Angeles.
Dana Point Ocean Desalination Project Project Update May 2007.
Orange County Business Council Infrastructure Committee
Constructive Water Dialogue: a key to success Fawzi Karajeh California Department of Water Resources For the The Southern California.
WATER.
John J. Entsminger, General Manager Belts, Suspenders and Safety Pins: How America’s Driest City is Preparing for an Uncertain Future.
California’s Water Resources. California has many resources, none more important than water. The main sources of California’s freshwater supply are precipitation,
Where is fresh water found? What are some California water sources?
What are the data gaps for developing brackish groundwater desalination resources in Texas? Bill Hutchison, Ph.D., P.E., P.G. Director, Groundwater Resources.
San Diego County Water Issues 2010 Update Maritime Business and Technology Summit November 16, 2010 Seawater Desalination for San Diego.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
CADIZ VALLEY WATER CONSERVATION, RECOVERY AND STORAGE PROJECT ENVIRONMENTAL REVIEW Urban Water Institute 2014 Conference February 19, 2014 Leslie Moulton,
Scientific Approaches to Assess Impacts Associated with Seawater Desalination Susan C. Paulsen, Ph.D., P.E. Vice President and Senior Scientist Desal Conference.
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Technical Workshops on Monterey Peninsula Water Supply Project A July 26 & 27, 2012.
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
Rich Haller, P.E. Program Manager, Santa Ana Watershed Project Authority (SAWPA) April 2, 2004 Brine Disposal Strategies in Inland Southern California.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
SOUTHERN CALIFORNIA REGIONAL DRINKING WATER QUALITY STRATEGY GROUP.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
Potable Reuse: A New Water Resource for the Central Coast Water Breakout Session – 2015 Central Coast Sustainability Summit James Hawkins, Heal the Ocean.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
Groundwater Assessment Study for the Metropolitan Water District of Southern California Southern California Water Dialogue May 2008.
1. 2 Regional water wholesaler to 6 counties covering 5,200 square miles Serves 19 million people = 50% of the state’s population with projected population.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
California Water Jeffrey Kightlinger, General Manager
Municipal Water District of Orange County OC Water Reliability Study INTERIM REPORT Review Interim Phase 1 Results December 8, 2015 Orange County Business.
San Gabriel Valley From Stormwater to Supply
Building New and Sustainable Water Resources for Los Angeles Urban Water Institute Spring Conference February 2016 February 2016 Martin L. Adams, P.E.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #4 June 18 – July 15.
Date: November 12, 2014 Presented by CAW at the California Coastal Commission hearing T E S T S L A N T W E L L P R O J E C T.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
Date: December 17, 2014 Presented by CAW at the California State Lands Commission hearing T E S T S L A N T W E L L P R O J E C T.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
Assemblymember Adrin Nazarian
Stan Sprague General Manager Municipal Water District of Orange County
Water Resource Management Planning Update
OCWD Speakers Bureau 10 min static
STATEWIDE DROUGHT RESPONSE: IMPACT TO SOUTH ORANGE COUNTY
Zone 7 And WaterFix March 7, 2018
Water Resource Management Planning Update
OCWD Speakers Bureau 10 min static
San Diego Water Resources
Orange County Groundwater Basin Compliance with SGMA
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
TAPPING THE WORLD OF POSSIBILITIES
Carlsbad and Huntington Beach Seawater Desalination Facilities
Presentation transcript:

South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status

2 Local Supplies Groundwater & Recycling Where Southern California Gets Its Water 50% Import - 50% Local Local Supplies LA Aqueduct (1913) Conservation Colorado River Aqueduct (1941) State Water Project Entitlement (1972) Transfers & Storage

MWDOC Member Agencies 14 cities 14 cities 11 water districts 11 water districts 1 private water company 1 private water company 1 community service district 1 community service district Orange County Water District Orange County Water District Total = 28 water Total = 28 water Population = 2.3 million Population = 2.3 million

Orange County Water Sources Source AF% Natural Flows Rivers/Streams 133, Indirect Recycled (Santa Ana River)86, GWRS Purified Water 66, Draw on OCWD Groundwater Storage(23,000) -4 (added storage) Recycled–Direct (landscape irrig.)37,000 6 Imported for Replenishment26,000 4 Imported for Direct Use254,00040 Consumptive Use 579, Water Use Efficiency Programs 65, Total without WUE 644, % 46% Local

Diemer Filtration Plant Water from the Water Importation Pipeline and South County Pipeline Water from the Joint Regional Water Supply System (JRWSS) Regional Imported Water System to South Orange County

Major Water Supply Issues in California Regulatory-imposed pumping restrictions have reduced State Water Project pumping by up to 50%; drought conditions have occurred; water allocations began July 1, 2009 Regulatory-imposed pumping restrictions have reduced State Water Project pumping by up to 50%; drought conditions have occurred; water allocations began July 1, 2009 Long-term resolution of Bay-Delta fix is uncertain at this time, but many years away Long-term resolution of Bay-Delta fix is uncertain at this time, but many years away Water recycling, development of other sources and water conservation are ALL NEEDED to close the supply gap Water recycling, development of other sources and water conservation are ALL NEEDED to close the supply gap Ocean desalination is one new source that needs to be developed in California and along other coastal States of the U.S. Ocean desalination is one new source that needs to be developed in California and along other coastal States of the U.S.

South Orange Coastal Ocean Desalination Project Concept Project Layout Layout

South Orange Coastal Ocean Desalination Project 15 million gallons per day meets about 25% of the 2025 water demands for: 15 million gallons per day meets about 25% of the 2025 water demands for: 1. Laguna Beach 2. San Clemente 3. San Juan Capistrano 4. Moulton Niguel WD 5. South Coast WD All five agencies can physically receive the water into their systems All five agencies can physically receive the water into their systems

SOCOD Participants Total Water Sources (acre-feet per year) Current%2035% Wells5,0027%9,73612% Recycled Water9,74313%13,42016% Ocean Water00%15,00018% Imported Water60,62180%44,87654% Total75,366100%83,032100%

South Orange Coastal Ocean Desalination Project NOT connected to a Coastal Power Plant NOT connected to a Coastal Power Plant Utilizes slant well intake system to be protective of the ocean environment Utilizes slant well intake system to be protective of the ocean environment Utilizes an EXISTING ocean outfall for brine discharge; makes discharge closer in salinity to that of the natural ocean water to improve mixing Utilizes an EXISTING ocean outfall for brine discharge; makes discharge closer in salinity to that of the natural ocean water to improve mixing Could be on-line in 2016 Could be on-line in 2016

South Orange Coastal Ocean Desalination Project Construction of a 15 million gallon per day Ocean Desalination Plant using a slant well subsurface intake to produce about 16,000 acre-feet per year of high quality drinking water is FEASIBLE Construction of a 15 million gallon per day Ocean Desalination Plant using a slant well subsurface intake to produce about 16,000 acre-feet per year of high quality drinking water is FEASIBLE Project cost = $136 million (Boyle Engineering, 2007) to $152 million with an allowance for San Juan Basin mitigation Project cost = $136 million (Boyle Engineering, 2007) to $152 million with an allowance for San Juan Basin mitigation Cost of water = $1287 per acre foot (Boyle Engineering, 2007) to $1356 per acre foot with mitigation. Cost of water = $1287 per acre foot (Boyle Engineering, 2007) to $1356 per acre foot with mitigation. MWDOC has an executed contract from MET to provide $250 per AF towards the cost of the water MWDOC has an executed contract from MET to provide $250 per AF towards the cost of the water

Test Slant Well Schematic Ocean Surface Land Surface Fresh Water 325 feet Test Slant Well Infiltration Drill Rig Ocean Bottom Main Aquifer 40 to 130 feet ± Salt Water 23 o 350 feet ±

Drilling Site at Doheny Beach

Dual Rotary Drill Rig

Welding Screen Joints

Objectives for Three Year Extended Pumping and Pilot Studies Start-up pumping of existing well in June 2010 to conduct study work Start-up pumping of existing well in June 2010 to conduct study work Extended pumping to pull in ocean water – 9 months Extended pumping to pull in ocean water – 9 months Validate groundwater model and beach wellfield capacity Validate groundwater model and beach wellfield capacity Address upstream groundwater impacts Address upstream groundwater impacts Assess water quality and microbial fouling Assess water quality and microbial fouling Confirm alluvial aquifer pretreatment capability Confirm alluvial aquifer pretreatment capability Evaluate water quality and post-treatment options Evaluate water quality and post-treatment options Conduct pilot plant study; develop process treatment specifications Conduct pilot plant study; develop process treatment specifications Conduct materials corrosion tests Conduct materials corrosion tests Refine Project cost estimates Refine Project cost estimates

Unloading Test Facility

Mobile Test Facility – Transformer and Panel

Intuitech Technician Working on RO Unit

Corrosion and Microbial Flow Test Apparatus

Intuitech – Electrical Control Unit

Slant Well Increase in Salinity (June through Oct 2010)

Questions? Thank you!