Status of Task 1 (Monitoring) March 27 - 30, 2001 - Milan, Italy.

Slides:



Advertisements
Similar presentations
Critical Reading Strategies: Overview of Research Process
Advertisements

Microsoft ® Office Excel ® 2007 Training Get started with PivotTable ® reports Sweetwater ISD presents:
Mobile Surveyor A Windows PDA/Mobile based survey Software for easy, fast and error free data collection.
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
Access 2007 Product Review. With its improved interface and interactive design capabilities that do not require deep database knowledge, Microsoft Office.
Intro to Systems Requirements COMP1007 © Copyright De Montfort University 2002 All Rights Reserved COMP1007 Introduction to Systems Requirements Use-Cases.
Microsoft ® Office Excel ® 2007 Training Get started with PivotTable ® reports [Your company name] presents:
Information Retrieval: Human-Computer Interfaces and Information Access Process.
DoW text: Task and WP leaders will prepare syntheses reports of the project progress, its results and its implications. These synthesis reports will be.
CP methodology adapted to Stockholm Convention Swedish International Development Agency S ESSION 9.C United Nations Environment Program Division of Technology.
1 PingER Executive Plots MAGGIE 21 st Feb Sequence 1. Brief Overview of Project 2. Current Implementation and Capabilities 3. Types of Charts.
Institute of Petroleum Engineering Transient Well Testing.
Microsoft ® Office Word 2007 Training Mail Merge II: Use the Ribbon and perform a complex mail merge [Your company name] presents:
Stimulation (Audit) n General Review of Stimulation. –First draft on March 24, general stimulation techniques, not specific for PWRI n Review of Damage.
Principal Investigators: Ding Zhu and A. D. Hill
11 Chapter 3: Getting Started with Tasks 3.1 Introduction to Tasks and Wizards 3.2 Creating a Frequency Report 3.3 Generating HTML, PDF, and RTF Output.
Copyright © 2015, Drillinginfo, Inc. All right reserved. All brand names and trademarks are the properties of their respective companies. 1 DI Transform:
Results, Discussion, and Abstract C344. Results and Discussion New evidence and persuasion! In many fields, the two sections are split In organic chemistry,
Task 4: Stimulation Economics and PWRI
Schlumberger Public Scope and Application of Pressure Transient Tests in CBM and Shale Gas reservoirs Baijayanta Ghosh Reservoir Domain Champion Testing.
Task 5: Layered Formations Workshop Littleton, CO April 25 and 26, 2000.
PowerPoint 2003 – Level 1 Computer Concepts Cathy Horwitz April 25, 2011.
House Ad Project: Developing an Ad Campaign. Using the “House Ad” as a project I suggest the “House Ad” exercise as a possible project. It is most effective.
Proposal Type One: Corpus-Based. The following is a list of items typically included in a Type One research proposal for MA in translation studies. The.
Collaborative Research Assistant 2007 Family History Technology Conference John Finlay Christopher Stolworthy Daniel Parker.
1 National Research Council - Pisa - Italy Marco Conti Italian National Research Council (CNR) IIT Institute Executive board meeting 2nd MobileMAN Workshop.
ProMenPol Conference BerlinPage: 1 Supporting practice – presentation of the ProMenPol database and new toolkit Richard Wynne, WRC, Donal McAnaney,
Professor Peter Styles Keele University United Kingdom.
Analytical Solution of the Diffusivity Equation. FAQReferencesSummaryInfo Learning Objectives Introduction Analytical Solution Linear Systems Radial Systems.
CONCERTO Premium Technical Monitoring Database & Semantic Layer Milan Marinov, KIT Prof. Andreas Wagner , Brussels.
Progress Seminar - I On “ ” (Seminar) By
Technical Team WITSML SIG Dubai - November 2008 John Shields / Gary Masters.
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
INFO 637Lecture #101 Software Engineering Process II Review INFO 637 Glenn Booker.
Integration of Production Analysis and Rate-Time Analysis via Parametric Correlations — Montney Shale Case Histories Yohanes ASKABE Department of Petroleum.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
February 2002 Joint Chalk Research Experiences and Plans.
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
Web-based Class Project on Rock Mechanics REPORT PREPARED AS PART OF COURSE CEE 544: ROCK MECHANICS WINTER 2015 SEMESTER INSTRUCTOR: PROFESSOR DIMITRIOS.
Overview of All Tasks March , Milan, Italy.
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
Introduction to UML CS A470. What is UML? Unified Modeling Language –OMG Standard, Object Management Group –Based on work from Booch, Rumbaugh, Jacobson.
1.  Interpretation refers to the task of drawing inferences from the collected facts after an analytical and/or experimental study.  The task of interpretation.
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
Fundamentals of Groundwater Flow (Flow in the Natural Environment) A Watershed Dynamics Tutorial © John F. Hermance March 21, 2003 Go to main directory.
Introduction of Geoprocessing Lecture 9. Geoprocessing  Geoprocessing is any GIS operation used to manipulate data. A typical geoprocessing operation.
Cadency for Entity Viewers Sony Pictures Entertainment’s Financial Close Management Tool.
Project Management. Introduction  Project management process goes alongside the system development process Process management process made up of three.
Produced Water Reinjection Performance Joint Industry Project TerraTek, Inc. Triangle Engineering Taurus Reservoir Solutions (DE&S) E-first Technologies.
DAY 14: ACCESS CHAPTER 1 RAHUL KAVI October 8,
E | W | E | W | NHS e-Referral Service Referring Roles Issued: 27 th.
Review of literature S. Balakrishnan. What is literature review? The terms literature search, literature review and literature survey are one and the.
Introduction to FFI: Why and how FFI was developed Introduction to FFI: Why and how FFI was developed 04/02/2013.
Web Server Administration Chapter 11 Monitoring and Analyzing the Web Environment.
SPE What Factors Control Shale Gas Production Decline Trend: A Comprehensive Analysis and Investigation HanYi Wang, The University of Texas at Austin.
Group Members: Surujlal Dasrath & Adam Truelove Advisors Dr. In Soo Ahn – Theory + Software Dr. Thomas Stewart – Theory + Software Dr. Anakwa – Hardware.
Chapter 5 Pressure Transient Testing (I)
Chevron Carbonates Shell GOM Sands Phillips Chalk Kerr McGee
Status of Task 5 (Layered Formations)
Stimulation.
WP1 INERTIA Framework Requirements, Specifications and Architecture
Gas Condensate Well Testing
PWRI Quarterly Meeting Tentative Agenda
Review: The Hall Plot Method
WG 2.B Integrated River Basin Management
Gas Condensate Well Testing
Task Status - Recap.
Presentation transcript:

Status of Task 1 (Monitoring) March , Milan, Italy

Task 1 - Monitoring Monitoring Methods Conventional methods completed Need to add fiber optics Need to finalize PLTs Need to improve fractured monitoring Need to incorporate specific Best Practices – suggestions?

Task 1 – Monitoring Methods Falloff –Introduction discussing differences between production and injection –Mobility –Injectivity and falloff definitions –Analytical relationships –Analogs to buildup testing –Injectivity – liquid-filled, unit mobility –Falloff – liquid-filled, unit mobility

Task 1 – Monitoring Methods Falloff –Multiple-rate testing –Injection – Non-Unit Mobility –Falloff – Non-Unit Mobility –Example Falloff – Non-Unit Mobility –Example Falloff – Two-Rate (needs to be completed) –Fractures – needs to be completed –Have analyzed Elf and Maersk data and need to include it in the Best Practices.

Task 1 – Monitoring Methods Average Reservoir Pressure –Why is it important? –How is it determined? Analytical methods are shown even though software or reservoir simulation might and should be carried out because of the complexity of well interactions. –Generic example shown highlighting false pressure. - Add example from provided field data - e.g. Phillips’ examples – already processed

Task 1 – Monitoring Methods Hall Plots –Introduction –Theory –Simplified Version to be avoided –Modified Hall Plot –Add Heriot-Watt developments and example. –Horizontals –Fractured –Meaning of the Slope –Applications –Add Advantek moving average considerations as a supplement or a separate method.

Task 1 – Monitoring Methods Step Rate Testing –Has been presented previously –New Statoil data to be included –Include some previously processed Maersk data

Task 1 – Monitoring Methods Pulse Testing –Basic Theory for Single and Multiple Pulses –Designing a Pulse Test

Task 1 – Monitoring Methods Interference Testing –Basic Theory is given even though you would probably use simulation –Single injecting well and a monitoring well –Two well interference with flow/injection –Analysis –Precautions –References

Task 1 – Monitoring Methods Drillstem Testing –Very brief overview only

Task 1 – Monitoring Methods Hydraulic Impedance Testing –Has been previously discussed.

Task 1 – Monitoring Methods Production Logging Testing –Needs to be written. –Include fiber optics here.

Task 1 – Monitoring Methods Conventional Leakoff Testing Extended Leakoff Testing Micro-Hydraulic Fracturing

Task 1 – Monitoring Methods Tiltmeters –Contacts –Introduction –Surface Systems –Examples –Downhole Systems –Additional References

Task 1 – Monitoring Methods Microseismic Monitoring –Contacts –Introduction –Placement of Receivers –Limitations –Interpretation –Field Examples –Methodology –Additional References

Task 1 – Monitoring Methods Real-Time Diagnostics –For acidizing – done –For fracturing – in progress

Task 1 - Monitoring Fracture Models –Audit and Summary Completed –Navigation in the ToolBox needs to be improved –Add “high-level” comparison to Best Practices –Any missing models? Yes – are being added

Task 1 - Monitoring Well Performance Prepared introductory level presentation on Well Performance for Injectors Radial flow completed Wellbore Hydraulics Completed – more on restrictions Completions

Task 1 - Monitoring How is this integrated into the Best Practices Site.Best Practices Site Currently is in Operational Considerations and Performance Needs further tie in with radial flow models and with models that are functional for soft formations.