 MSU Port Arthur Maritime Industry Plan o Port Conditions  MSU Port Arthur Hurricane Plan o Hurricane/Severe Weather Response Operations  Sector Houston.

Slides:



Advertisements
Similar presentations
Welcome to SMMs Presentation offering a synopsis of our Emergency Response Service on a 24 Hour basis PRESS RIGHT MOUSE CLICK IF YOU WANT TO MOVE BACK.
Advertisements

Canadian Coast Guard Safety First, Service Always A National Institution in Service for Canadians May 5, 2003.
Ocean Lighretage Services Pvt. Ltd.
US&R Planning. US&R Planning Issues Establish authority and responsibility Assess vulnerability and hazards Identify resources Coordination of response.
Tampa Bay Harbor Safety & Security Committee
Cook Inlet Harbor Safety Committee Informational Meeting Enhancing the Marine Transportation System (MTS) in Cook Inlet.
U. S. Coast Guard Role and Process for LNG Mr. Alan Moore LT Dan McLean
Port Heavy Weather Plan for Northeast and Eastern Central Florida.
U.S. COAST GUARD Presented by LCDR Marcella Granquist
LCDR Quincy Davis Commanding Officer Marine Safety Unit Baton Rouge.
Dock Suitability LCDR Xochitl Castañeda Chief, Waterways Management Division Sector Houston-Galveston Prepared for Dredging Your Docks 2012 November 7,
MODULE 3. MANAGING EMERGENCY RESPONSE Dick Evans.
Coast Guard MSU Port Arthur  Vessel Groundings CFRs - Reporting Requirements Commercial Impacts  Captain of the Port Initiatives Encourage Hydrographic.
Hurricane Isaac X X X ◘ Isaac began as a tropical wave on August 16 th off the coast of Africa & was classified as a tropical storm on August 21 st ◘
Assistant Commandant for Engineering and Logistics (CG-4) Homeland Security United States Coast Guard U.S. Coast Guard Emergency Response & Community Resiliency.
Marine Transportation System Common Assessment & Reporting Tool (CART) Mr. Thomas Kalisz, USCG “The nation needs a coordinated, integrated approach to.
DDC District Disaster Chairman  Receives requests (STAR) for state assistance from local governments or other state agencies responding to emergencies.
Alaska Regional Response Team Places of Refuge By John Bauer Alaska Department of Environmental Conservation.
1 Marine Transportation System (MTS) Recovery "Our operational capabilities also include developing a national capacity for Marine Transportation System.
Passenger Vessel Safety Specialist Paul Culver Seventh Coast Guard District.
Rapid Intervention Team & MAYDAY Procedures
What RECREATIONAL BOATERS should know Other resources for tsunami information in California How should boat owners PREPARE for tsunamis? Prior to arrival.
Hydrographic Services Review Panel 2011 Hydrographic Services Review Panel 2011 CAPT Mark Ogle COMMANDER, SECTOR HAMPTON ROADS.
University of Houston-Clear Lake Police Department HURRICANE Storm Advisory & Preparation University Hotline: (281)
A PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC SERVICES (NCOP) 24 OCTOBER 2007 BY MPATLISENG RAMAEMA CHIEF DIRECTOR: MARITIME TRANSPORT REGULATION DEPARTMENT.
Organizational Tabletop Exercise 1 Hurricane Scenario (Community-Based Organizations) Date | Location.
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
Lake Forest Emergency Plan Part II POST EVENT PROCEDURES.
Emergency Communication And Evacuation SOP# 505 Training On Demand.
Master / Pilot exchange
1 Maritime Targeting and Boarding Overview. 2 Objectives Notice of Arrival requirements Targeting Boardings & Examinations –Security Boardings - Targeted.
DISASTER PREPAREDNESS Checklist for COPs and FMs.
RESPONSIBLE PERSON TRAINING. Review of § Emergency Evacuations.
USCG Amver System A tool for search and rescue in the Arctic March 2009.
NMSZ Event Overview: Roles, Responsibilities, and the Marine Transportation System Recovery Unit (MTSRU) 22 April 2015 Semper Paratus United States Coast.
2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011.
CANADIAN COAST GUARD AUXILIARY - PACIFIC COORDINATION OF MULTIPLE SURFACE UNITS CANADIAN COAST GUARD AUXILIARY - PACIFIC February 2012.
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
Sally Bishop Emergency Management Director. Hurricane Storm Surge Vulnerability Category 1 Storm: 4’ to 8’ Surge Category 1 Storm: 4’ to 8’ Surge Evacuation.
Marine Industry Day 2015 Waterways Management Division: (504) Vessel Traffic Center LMR: (504) Sector Command Center (24 hours): (504)
US Army Corps of Engineers BUILDING STRONG ® USACE Hurricane Preparedness Victor A. Landry III Operations Manager, GIWW USACE, New Orleans District 20.
Authority: Who Does What?. Los Angeles – Long Beach Area Contingency Plan Marine Firefighting and Salvage Plan.
1 INTERTANKO NORTH AMERICAN PANEL Tanker Industry Topics Captain Brian Penoyer Sector Commander and Captain of the Port Coast Guard Sector Houston-Galveston.
CGC MOHAWK (WMEC-913). Table of Contents History of Hurricanes in Key West Hurricane Impacts on Key West Hurricane Background Information Conditions and.
Functions of the Global System 1. Alerting Distress alerting is the rapid and successful reporting of a distress incident to a unit which can provide or.
HURRICANE PREPAREDNESS & RESPONSE Michael Walter Public Information Officer.
ERCOT Severe Weather Drill Hurricane May May 2012.
Central Houston, Inc. Houston Downtown Management District 909 Fanin, Suite 1650 Houston, Texas / Operations
Central Houston, Inc. Houston Downtown Management District 909 Fannin, Suite 1650 Houston, Texas / Operations
Regional Response Team Meeting AUG 12, U.S. Coast Guard Sector San Diego 1.Cases 2.Exercises 3.Items of interest.
Evacuation Procedures City Council October 20, 2015.
Contact Point Agent:Operating company: Stevedore:Harbor Master: Liner:Japan Coast Guard: Tug Company:Other: Earthquake, Tsunami is occur r red !! Earthquake.
Contact Point Harbor Master:Japan Coast Guard: Port Manager:Other: Port and Ship Information Ship name:Gross Tonnage: No. of Crew:No. of Passenger: Basic.
Port Agent, Houston Pilots
Town of Emerald Isle’s Emergency Operations Plan
2011 Hurricane Season Brief
District’s Plan for Disaster Preparedness.
System Analysis of the URI Hurricane Preparedness Plan
Sector Houston Port State Control Division
ERCOT Severe Weather Drill
Hurricane Port Conditions & Preparedness
USCG Roles & Responsibilities During a Ship Fire
Oleh : Ir. Sjaifuddin Thahir, MSc.
EHCMA Hurricane Workshop
Oleh : Ir. Sjaifuddin Thahir, MSc.
Conditions of Entry (COE) Requirements
DISASTER RESPONSE PLANNING IN SAMOA
Disaster Response Pt. 2 CERT Basic Training.
Public Safety Power Shutoff (PSPS)
Presentation transcript:

 MSU Port Arthur Maritime Industry Plan o Port Conditions  MSU Port Arthur Hurricane Plan o Hurricane/Severe Weather Response Operations  Sector Houston – Galveston Instruction 3006 o Severe Weather Plan

 Port Hurricane Plan o  VTS Port Arthur Website o All vessel owners and operators should review available hurricane plans and checklists. Industry Hurricane Planning Information Remaining in-port checklists for ships Remaining in-port checklists for tugs/barges

► As there are no “safe havens” within the zone, the COTP believes that when sustained tropical storm winds or greater are imminent, evasion at sea is the safest course of action for all seaworthy, deep-draft vessels. This is a recommendation. ► Ultimately, the responsibility for the safety of a vessel and its crew rests with the vessel’s master. Therefore, unless a thorough assessment of the situation indicates a greater level of risk to the safety of life in the port, the COTP will respect a master’s decision to remain in port. ► Facility operators should be advised that the COTP will not order vessels to depart the facility if doing so would unduly hazard the vessel.

► As there are no safe havens in the Port Arthur COTP zone, the risk of damage to our ports is reduced when the number of commercial vessels is minimized. Accordingly, commercial ocean-going vessels and ocean-going tug/barge combinations over 500 GT are encouraged to depart the port when hurricanes approach. ► Masters or agents of vessels unable to depart the port must submit a Remaining In Port Checklist and submit to VTS Port Arthur.

 Press up tanks (Landside Facilities)  Know which vessels staying in port / departing  Extremely low probability of small vessels surviving the storm South of Texaco Island  Communications o Marine Safety Info. Broadcast / Broadcast Notice to Mariners o Alert Warning System 2.0 / HomePort Notification o Port Coordination Team Phone Conferences

► Disaster Assessment Team – (DAT) o Evacuate to Kountze, TX – county courthouse ► Pre-storm SAR (when necessary) ► Pre-storm Assessments o Complete facilities status updates o Identify waterway hazards and risks o Identify potential pollution risks

Time until gale force winds Port Conditions HurricaneConditions Hurricane Category Sustained Winds Jun 1 st – Nov 30thNormal5Tropical Storm39-73 mph 96 hoursNormal mph 72 hoursWhiskey mph 48 hoursX-Ray mph 24 hoursYankee mph 12 hoursZulu15157 mph/+ Gale force winds - greater than 34 knots (39 mph)

 What is the Port Coordination Team (PCT): o The PCT functions as an information exchange entity to help coordinate closing/opening of Port. o Proven track record; worked well during previous waterway incidents & hurricanes. o PCT is responsible for entering data into Common Assessment and Reporting Tool (CART) for vessels.

 WHISKEY - Gale force winds landfall within 72 hours o The Captain Of The Port (COTP) will issue radio broadcasts and Marine Safety Information Bulletin (MSIB) as needed to keep mariners informed of developing conditions.

 X-RAY - Gale force winds landfall within 48 hours o The COTP will update radio broadcasts and MSIB. o Bunkering / lightering should be complete. o Ships should complete cargo operations. o Anticipate that the COTP will order the port closed to all vessel movements except for emergency / rescue traffic at Port Condition Zulu.

 YANKEE - Gale force winds landfall within 24 hours o The COPT will update radio broadcasts and MSIB. o Facilities notified that the COTP will order cessation of cargo handling operations during condition ZULU. Facilities may insist that vessels depart their docks during this time. o Movements will be permitted by the COTP at Port Condition Zulu only when a suitable lay berth or anchorage space is available nearby. Ships personnel should inspect the mooring / anchoring lines, note the possibility of storm surge. o The COTP may close the port to all marine traffic except for emergency / rescue traffic when sustained winds exceed 35 knots.

 ZULU - Gale force winds landfall within 12 hours o The COTP may update radio broadcast and MSIB to notify the maritime community that the port is closed to all commercial traffic with exception of emergency / rescue traffic. o All cargo handling operations will be suspended. o Ships personnel should inspect the mooring / anchor lines, note the possibility of storm surge.

 Marine Transportation System Recovery Unit (MTSRU) o Included in the ICS structure (Commonly in Planning) o Stood up prior to landfall o Responsible for reaching out to facilities for data o Responsible for entering data into CART for facilities

 Coast Guard will contact you o PCT responsible for Vessels Will enter vessel data into CART o MTSRU responsible for Facilities and Waterways Will enter facility data, channel closures, ATON discrepancies, etc. into CART ► Purpose of CART: o The information contained in CART assists the MTSRU in making MTS Recovery recommendations to the Unified Command and facilitates MTS Recovery Operations.

► Post-Storm response efforts will be directed from the Incident Command Post (ICP). o Location of the ICP will depend of the severity of the storm ► Search and Rescue / Pollution Response Phase o Rapid Assessment Team deployed to incident area ► Restoration of commercial operations o Channels surveyed to ensure safety of vessel traffic o Vessel traffic prioritized