DAQ May 25, 2000 Harry Nelson. Meeting Schedule March - meeting at SUF, laid plans for overall work plan 1/week at UCSB Re-started weekly phone meetings.

Slides:



Advertisements
Similar presentations
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Advertisements

PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
ESODAC Study for a new ESO Detector Array Controller.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
Far Detector Data Quality Andy Blake Cambridge University.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Update on Electronics Activities Jim Pilcher University of Chicago 20-Jan-2006.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Data Acquisition Dr inż. ZDZISŁAW PÓLKOWSKI Polkowice, 2015 University of Pitesti Dolnośląska Wyższa Szkoła Przedsiębiorczości i Techniki w Polkowicach.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
Status of the CSC Track-Finder Darin Acosta University of Florida.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
06/04/2012Steve Hahn — AEM Meeting1 MINOS Status Report Rack cleanup –All racks vacuumed –All filters cleaned –Wiener power supply/chassis checked for.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Status of NA62 straw electronics Webs Covers Services Readout.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
CDMS Computing Project Don Holmgren Other FNAL project members (all PPD): Project Manager: Dan Bauer Electronics: Mike Crisler Analysis: Erik Ramberg Engineering:
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
CODA Graham Heyes Computer Center Director Data Acquisition Support group leader.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
1 Run IIb Event Builder upgrade Director’s Review Jan Steve TetherRon RechenmacherMarkus KluteBruce Knuteson MITFNAL/CDMITMIT RonSteve Motivation.
CDMS II Shielding To Installation To Construction From Design.
Amitava Roy VECC.  Mostly towards the in-house experimental nuclear physics program  Little participation towards CBM-FAIR  Data Acquisition Software.
DAQ ELECTRONICS 18 March 2015MEG Collaboration Meeting, Tokyo Stefan Ritt.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Digital Acquisition: State of the Art and future prospects
Work on Muon System TDR - in progress Word -> Latex ?
ELENA scrapers ELENA status for BI – electronics and software
KRB proposal (Read Board of Kyiv group)
T1 Electronic status Conclusions Electronics Cards:
J.M. Landgraf, M.J. LeVine, A. Ljubicic, Jr., M.W. Schulz
VELO readout On detector electronics Off detector electronics to DAQ
Upgrading the Digital Component of the Bunch Current Monitors
LHCb PileUp VETO L0 trigger system using large FPGAs (M
Harry Nelson, UCSB Collaboration Meeting July 1, 2002
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
RPC FEE The discriminator boards TDC boards Cost schedule.
PID meeting Mechanical implementation Electronics architecture
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

DAQ May 25, 2000 Harry Nelson

Meeting Schedule March - meeting at SUF, laid plans for overall work plan 1/week at UCSB Re-started weekly phone meetings - yesterday Late June DAQ meeting in UCSB - a postdoc candidate is planned to attend

DAQ `Bandwidth’ At CDMS-II, near to saturating Fast Ethernet from in-crate processor to the event builder In-crate processors are somewhat behind the the competive `box’ processors (Bauer) - `quiet’ VME (eliminate VXI) (Holmgren) - VME > Bit3 > PCI

`Bandwidth’ cont’d PCI Box > Event Builder with Myrinet, instead of Fast Ethernet - looks appealing –non-DAQ - >100 Mbyte/s –cost ? About $20K more Could even stay Mac + Labview In Crate Decimation - no progress, and it is another route to `Bandwidth’ solution

Crate 2 Some more infrastructure - probably Craig Maloney > SUF to work over phone with Don Holmgren in next month Would like to implement In-Crate Decimation, or filtering

Functional Blocks ZIPS - Digitizers - a substantial set in hand Time History Unit –Veto - use `old’ digitizers, and make into an `analog’ time history unit this will be the prototype DAQ environment at UCSB (Craig Maloney), to in part, transfer know- how about device drivers from Don Holmgren –Detectors - sparse occupancy in Soudan various proposals, one written up by Craig Maloney

Functional Blocks Veto - peak sensor (Ray Bunker) - prototype Veto - pulser (Ray Bunker, Tony Piro) - prototype Veto - HV power - investigating CAEN record (Ray Bunker)

Functional Blocks ZIPS - RTF/ `Trigger Conditioner ‘ (Burke, Sander) –Left debugged/fixed/layout fixed –Right now back from prototype, being tested ZIPS - VME/ `Trigger Logic Board’ (Burke, Sander) –Issues about handling of trigger lines

Soudan LAN Two T1’s - 100’s of Kilobytes –not enough for us and Minos! –What to do? Mass storage at Soudan –Tevatron Run-II/CLEO-III …. AIT-2 (Sony) 25 Gbyte/cassette Exabyte `Mammoth-2’ similar

Must do’s UCSB Postdoc Settle Trigger Logic Board Settle High Voltage for Veto Make a `new-style’ DAQ this summer for veto