New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.

Slides:



Advertisements
Similar presentations
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Advertisements

This is the first slide in the slide show, click each time you would like to go to the next slide. Thank you.
Skyscraper Construction
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
The Medical Office Building Brendon Burley Structural Option April 11, 2005 Advisor: Dr. Thomas Boothby.
Construction Management
C AMPUS S QUARE H ARRISBURG, P ENNSYLVANIA A NDREW M ARTIN | C ONSTRUCTION M ANAGEMENT | A PRIL 12, 2010.
Kyle Goodyear BAE in Construction Management Pennsylvania State University Senior Thesis Presentation April 12, 2010.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
North Pocono High School
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
Dan Packer Construction Management Senior Thesis April 16, 2002
George Read Hall The University of Delaware
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Chapter 25 Framing Methods. 2 Links for Chapter 25 Balloon Framing Platform Framing Post-and-Beam Framing Related Web Sites Steel Construction Concrete.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
LEED TOYOTA CORPORATE REAL ESTATE AND FACILITIES Jennifer Drilling 2003 Senior Thesis Construction Management Pennsylvania State University GOLD Leadership.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
Architectural Engineering Construction Management Senior Thesis April 11 th, 2011 Consultant: Dr. Riley Architectural Engineering Spring 2011 – Senior.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
DEREK BAUER CONSTRUCTION MANAGEMENT AE SENIOR THESIS 2008 PENN STATE UNIVERSITY AE SENIOR THESIS PRESENTATION APRIL 15, 2008 OFFICE/RETAIL BUILDING WASHINGTON,
Swedish American Hospital Heart and Vascular Center Philip Frederick Structural Option AE Senior Thesis 15 April 2008.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskey’s Senior Thesis The Pennsylvania State University Architectural.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Bellefonte Area High School Mark Demianovich Construction Management 2007.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Precast Concrete Panel Group 6 Alex Cooper Yadir Avila Erjan Kadrakunov.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Pearl Condominiums Philadelphia, PA
David Anderson Mechanical Option
Redifer Commons Addition & Renovation Project
Council Rock High School South
Wrangle Hill Elementary School New Castle, DE
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Biobehavioral Health Building, University Park, PA
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
The Bond Street Wharf Baltimore, Maryland
Building Construction
Lehigh Valley Heritage Center
Project Background Type of building: Mixed-use residential building
Project: 250 West Street, Columbus, Ohio
RiverView Condominiums II Chicago, IL
Presentation transcript:

New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option

Presentation Outline Background Analysis 1 Analysis 2 Analysis 3 Background -Building, project, and site information Analyses -In depth discussion of each analysis Questions -A little Q & A

Background Analysis 1 Analysis 2 Analysis 3

Owner Information Background Analysis 1 Analysis 2 Analysis 3 Currently overseeing: 5 elementary schools 1 middle school 1 high school Chief concerns: space, cost, durability, safety, schedule

The Building Background Analysis 1 Analysis 2 Analysis 3

The Building Background Analysis 1 Analysis 2 Analysis 3 Size: 196,000 sq ft Construction: 5/16/05 – 8/29/06 Hard Cost: $28,800,000 Delivery Method: Design-big-build, CM Agent

The Team Background Analysis 1 Analysis 2 Analysis 3 Owner: Geneva Community Unit School District #304 Architect: Larson and Darby Group Construction Manager: Bovis Lend Lease Consultants: Rempe-Sharpe and KJWW

The Systems Background Analysis 1 Analysis 2 Analysis 3 Mechanical HVAC: (2) 300 ton air cooled chillers, 6 AHUs, dust control system Heating: 2-pipe heated water system, (2) 250 BHP boilers, individual fan coil units throughout Additional Heating: 2,340 linear feet of radiant ceiling panels

The Systems Background Analysis 1 Analysis 2 Analysis 3 Electrical Supply: 2732 KVA 480/277 line Main Distribution: 4,000 A, 480/277, 3 Phase Transformers: (2) 500 KVA, (1) 225 KVA Generator: 250 KVA, 480/277, cross-linked to existing middle school Fire Protection 4 zone, wet system smoke detectors and alarms

The Systems Background Analysis 1 Analysis 2 Analysis 3 Structural Unit A/C: Single story. 12” CMU load bearing masonry on concrete strip footings Unit B: Two story. Structural steel with combination architectural precast and face brick. Flooring is 12” hollow core precase with 3” poured slab topping. Basement utilizes step footings to match CMU coursings.

The Site Plan Background Analysis 1 Analysis 2 Analysis 3

Analysis 1 Background Analysis 1 Analysis 2 Analysis 3 Interior Wall System, Building B

Intent Background Analysis 1 Analysis 2 Analysis 3 Building B Interior Wall Type Burnished face CMU durable, attractive, high fire rating expensive, heavy, coordination issues Metal stud wall lightweight, inexpensive, fewer coordination issues less durable, thermal bridging, sound transmission

Methods Background Analysis 1 Analysis 2 Analysis 3 Wall takeoff Calculate unit weight of different wall types Calculate total weight difference Re-size structural steel members Calculate cost savings for steel and new wall type

Weight Savings Background Analysis 1 Analysis 2 Analysis 3 Existing System:1,050,742 lbs Stud Wall System:128,848 lbs Savings:921,894 lbs Total Difference of 461 Tons -or psf of dead load

Structural Steel Background Analysis 1 Analysis 2 Analysis 3

Cost Impact Background Analysis 1 Analysis 2 Analysis 3

Cost Impact Background Analysis 1 Analysis 2 Analysis 3

Conclusion Background Analysis 1 Analysis 2 Analysis 3 Use Metal Stud Wall System

Analysis 2 Background Analysis 1 Analysis 2 Analysis 3 Exterior Wall System, Building B

Intent Background Analysis 1 Analysis 2 Analysis 3 Building B Exterior Wall Type 8” CMU, 3” rigid foam insulation, face brick Alternative Systems Tilt-up concrete with Nitterhouse brick façade Precast concrete with face brick Smith Midland Slenderwall

Tilt-up Problem Background Analysis 1 Analysis 2 Analysis 3

Cost & Schedule Impact Background Analysis 1 Analysis 2 Analysis 3

Energy Impact Background Analysis 1 Analysis 2 Analysis 3

Energy Impact Background Analysis 1 Analysis 2 Analysis 3

Energy Impact Background Analysis 1 Analysis 2 Analysis 3

Energy Cost Impact Background Analysis 1 Analysis 2 Analysis 3

Conclusion Background Analysis 1 Analysis 2 Analysis 3 Stay With Initial Wall System

Analysis 3 Background Analysis 1 Analysis 2 Analysis 3 Obstacles to Building Green Schools

Intent Background Analysis 1 Analysis 2 Analysis 3 To better understand why more schools aren’t being built green and find the obstacles that are allowing this to happen Benefits: Reduced Energy Bills Smaller Environmental Impact Better Student Performance

Methods Background Analysis 1 Analysis 2 Analysis 3 Online research Phone interviews More phone interviews

The Way Schools Build Background Analysis 1 Analysis 2 Analysis 3 Funding from tax dollars or referendum Community Involvement referendum, forum, SC had no requirement projects were at various states or preparation Hired Outside Architects Geneva had an in-house architect

Findings Background Analysis 1 Analysis 2 Analysis 3 Schools and districts generally unaware of benefits of green design. Also unaware of government green incentive programs. Architects always suggested the green design had to do “some convincing” Non-Green Schools various excuses insisted green was still on their minds

Conclusion Background Analysis 1 Analysis 2 Analysis 3 No green buildings without green design Owner and community education Government incentives

Background Analysis 1 Analysis 2 Analysis 3

Questions Background Analysis 1 Analysis 2 Analysis 3 ?