MIG 2 - Water Quality and Quantity Study Plan Review April 2, 2008.

Slides:



Advertisements
Similar presentations
MIG 5 – Recreation Study Plan Review April 2, 2008.
Advertisements

1 Stormwater Program Videoconference April 23, 2013 Bill Cole, Water Quality Standards Unit.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
7:00 pmWelcome and introductions 7:05pmHLWD planning overview Plan update process 7:25 pmStakeholder involvement Watershed problems 7:40 pmPublic comment.
Welcome If you haven’t, please sign in Coffee and water are located in the back Meeting Protocol is in your packet, please review. Please take a moment.
Implementation Council Meeting Structure and Resources Background: The Implementation Council (Council) roles and responsibilities are described in the.
Nelly Smith EPA Region 6. - Develop or revise bacteria reduction program for consistency with new TMDL requirements and allocations - Develop or revise.
General Permits Schedule Update Water Quality Partnership Meeting May 19, 2005 Dewey Weaver.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Physical Security CIP NERC Standing Committees December 9-10, 2014.
Status of the WET Program William Telliard Director, Analytical Methods USEPA Office of Science & Technology Office of Water.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Martin Informational Meeting. May 24, 2007Martin Informational Meeting2 Agenda 9:00 – 9:30 AM Welcome & Overview of the January Issues Identification.
Claytor Hydroelectric Project Water Quality Study Mark Hutchins, Project Manager January 25, 2007.
Page 1 Internal Audit Outsourcing The Moss Adams Approach to Internal Audit Outsourcing Proposed SOX 404 Changes.
Hydrostatic Testing Draft General Permit Draft Permit Stakeholder Outreach Meeting April 23, 2015 Moderated by: Lillian Gonzalez, Unit Manager, Permits.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
7 March /24/  MassDEP convened WNTAG to advise the Department on how to craft an effective regulatory & policy response to Wind Turbine.
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
Atlin/Taku Land Use Planning Update Presentation to Multiparty Workshop #3 March 6, 2009.
Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy.
DWA: WATER QUALITY MONITORING TASKS. TENDER DOCUMENT Aim: develop a systematic monitoring protocol that will determine possible impacts of natural and.
Using Evaluation for Continuous Program Improvement: A Conversation with the Accelerating Opportunity Evaluators Lauren Eyster and Maureen Conway National.
Jeff Manning Division of Water Resources. What? Readopting all the rules? S.L (H74) requires review and, where necessary, readoption of all.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
Baird Claytor Hydroelectric Project Sedimentation Study.
April 2006 Middle Fork Project Relicensing Process April 25, 2006
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
M ODESTO I RRIGATION D ISTRICT | T URLOCK I RRIGATION D ISTRICT FERC PROJECT N O Don Pedro Project Relicensing.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
DO TMDL Subcommittee Meeting June 19, A Bit of History ( ) Summer-Fall 2008 BAP discussion begins Study Proposal formulated Summer-Fall.
Middle Fork Project Existing Resource Information Reports July 18, 2006.
Middle Fork Project Relicensing Process Plan April 25, 2006.
7-8 November 2006 Belgrade, Serbia Extension of the EEA European Topic Centre’s Work Program to the West Balkan Countries in the field of water 1 EIONET-Water.
Lenoir County Public Schools New North Carolina Principal Evaluation Process 2008.
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks March 16, 2016.
Teacher Evaluation Timeline
PowerButte: Solar Overlay Replacement with PowerButte Guide
CBP Biennial Strategy Review System
Water Quality Standards Submittal & Review Process
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
303(d) List Methodology Jeff Manning
Proposed Bay TMDL Schedule
Cost of Service Analysis & Rate Design
Implementing the Transportation/Land Use Connection Program
Concentrated Animal Feeding Operations (CAFOs) National Pollutant Discharge Elimination System (NPDES) CAFO Rule and the Proposed Idaho NPDES CAFO General.
Water Quality Credit Trading
Division of Energy, Mineral, and Land Resources
CBP Biennial Strategy Review System
Report of Proceedings Surface Water Quality Standards Triennial Review Environmental Management Commission November 13, 2014 Steve Tedder – EMC Hearing.
Preparation for New Curriculum Proposal System (CPS)
What is a Watershed Implementation Plan?
Exit Capacity Substitution and Revision
Martin Informational Meeting
Environmental Management Commission, March 9, 2017
Grace Anderson Chair, Budget Work Group May 16, 2018
Changes in INTOSAI Standard Setting Process.
Don Pedro Project Relicensing
Grace Anderson Chair, Budget Work Group May 16, 2018
Presentation transcript:

MIG 2 - Water Quality and Quantity Study Plan Review April 2, 2008

MIG 2 Agenda  Introductions  Comments Received  Summary of Revisions to the MIG 2 Draft Study Plans  Next Steps in the Process

April 2, 2008 MIG 2 Studies  Water Quality  Location of NPDES Permits  Erosion and Sedimentation  Water Quantity, Water Use, and Water Withdrawals

April 2, 2008 MIG 2 Study Plan Commenters  LM HOBO  ARA  WWF  USFWS  ADCNR  Will Denton

Study Plan 1 Water Quality Study Plan MIG 2 Water Quality and Quantity

April 2, 2008 Study Goals   Prepare an adequate baseline of water quality information for Lake Martin and the Project tailrace.   Develop a Plan to evaluate any proposed Project operation changes identified during relicensing.

April 2, 2008 Study Methodology   If review of the project operations and downstream flood analyses identifies a potential increase to the winter rule curve or change to the amount of time the summer rule curve is in effect at Lake Martin, the implementation of that change and any potential impacts to water quality of the project will need to be analyzed.   Continuation of Baseline Water Quality Sampling APC will continue their collection of water quality sampling on the lake and tailrace to be used in development of the 401 water quality certification application.   Analysis of Nutrient Levels in Lake Martin Nutrient levels in the lake may need to be addressed in relation to lake classifications. If so, APC will examine nutrient inputs into the lake in relation to observed lake productivity. This will be developed with ADEM and with the MIG 2 as deemed necessary.

April 2, 2008 Revisions to Study Methodology   APC will continue to collect water quality sampling on the lake and tailrace to be used in development of the 401 water quality certification application.   If necessary, nutrient levels in the lake may be reviewed in relation to lake classification.

Study Plan 2 Location of NPDES Permits on Lake Martin MIG 2 Water Quality and Quantity

April 2, 2008 Study Goal   Develop a list of all NPDES permits on Lake Martin and identify their location and pollutant load.

April 2, 2008 Study Methodology Data Collection Techniques   Existing information will be used to facilitate data collection for this study. First, a request for up to date NPDES data from the ADEM will be made.   Once a list of NPDES permit locations is complete and other existing literature has been complied and reviewed, a draft report will be issued to Martin Issue Group (MIG) 2 for their review and comment. The report will include a list of the NPDES locations, owners, and effluent limits. Comments received from MIG2 will be incorporated into a final report. Data Analysis   Other than a literature review, there will be no data analysis associated with this study. The GIS overlays may be compared with areas of Lake Martin experiencing water quality problems to better understand the impacts of discharges.

April 2, 2008 Revisions to Study Methodology   The report will include a list of the NPDES locations, owners, and effluent.

Study Plan 3 Erosion & Sedimentation MIG 2 Water Quality and Quantity

April 2, 2008 Study Goals   Identify “hot spot” erosion areas on the lake or tailrace.   Investigate some tributaries for “headcutting”.   Identify areas that currently have or could potentially have nuisance aquatic vegetation.

April 2, 2008 Study Methodology   Erosion Hotspot Data Collection and Analysis   Sedimentation Area Data Collection and Analysis

April 2, 2008 Revisions to Study Methodology   Tributary headcutting will be investigated on at least two of the larger tributaries of the lake.   Sedimentation areas will be identified with LIDAR and photography information on the lake.   Some verification through field observations.   Surveys for nuisance aquatic vegetation.

Study Plan 4 Water Quantity, Water Use, and Water Withdrawals MIG 2 Water Quality and Quantity

April 2, 2008 Study Goals   Provide a list of current water withdrawals from Lake Martin.   Provide a description of the process used to permit water withdrawals.

April 2, 2008 Study Methodology   Data Collection   Data Analysis

April 2, 2008 Revisions to Study Methodology   There have been no substantive changes to the November 2007 Draft Study plan.

Next Steps in the Process Summary and FERC Process

April 2, 2008 Summary   Draft Study Plans filed with PAD & NOI - June 2008   Comments due on PAD (including Study Plans) - September 2008   Final Study Plans filed with FERC- November 2008   Stakeholders have the opportunity to file their recommended changes to APC’s Final study plans - December 08 – February 09

April 2, 2008 FERC Study Plan Process APC files NOI & PAD (June 2008) FERC Issues SD1 FERC holds Scoping Meetings Comments on PAD, SD1 & Study Requests APC Files Proposed Study Plan (November 2008) Comments on Study Plan FERC Study Plan Approval (April 2009) Study Dispute Resolution (if necessary) Days