LCG Generator Meeting, December 11 th 2003 Introduction to the LCG Generator Monthly Meeting.

Slides:



Advertisements
Similar presentations
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
Advertisements

D. Düllmann - IT/DB LCG - POOL Project1 POOL Release Plan for 2003 Dirk Düllmann LCG Application Area Meeting, 5 th March 2003.
Simulation Project Major achievements (past 6 months 2007)
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Automated Tests in NICOS Nightly Control System Alexander Undrus Brookhaven National Laboratory, Upton, NY Software testing is a difficult, time-consuming.
Simulation Project Organization update & review of recommendations Gabriele Cosmo, CERN/PH-SFT Application Area Internal.
Simulation Project Organization update & review of recommendations Gabriele Cosmo, CERN/PH-SFT Application Area Internal.
Gauss: Generator Status Patrick Robbe, LAL Orsay, 6 Oct 2009.
SPI Software Process & Infrastructure GRIDPP Collaboration Meeting - 3 June 2004 Jakub MOSCICKI
IPPOG Database EPPCN & IPPOG Joint Session 4 November, 2011-CERN L. Mc Carthy.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Abstract The automated multi-platform software nightly build system is a major component in the ATLAS collaborative software organization, validation and.
SPI Software Process & Infrastructure EGEE France - 11 June 2004 Yannick Patois
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
A. Aimar - EP/SFT LCG - Software Process & Infrastructure1 Software Process panel SPI GRIDPP 7 th Collaboration Meeting 30 June – 2 July 2003 A.Aimar -
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
HERA/LHC Workshop, MC Tools working group, HzTool, JetWeb and CEDAR Tools for validating and tuning MC models Ben Waugh, UCL Workshop on.
4 November Development, validation and maintenance of Monte Carlo event generators & generator services in the LHC era Development, validation and.
LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
LCG Generator, October 16 th 2003 Introduction to the October LCG Generator meeting Paolo Bartalini CERN.
Alexander Toropin Generator Services monthly meeting 6 June 2007 GENSER status.
Development, validation and maintenance of Monte Carlo event generators & generator services in the LHC era Dmitri Konstantinov 26 March
F. Rademakers - CERN/EPLinux Certification - FOCUS Linux Certification Fons Rademakers.
PRS Session, May 12, 2006Filip Moortgat, ETHZ Generator Interface Generator Interface in CMSSW existing/planned interfaces with generators content of the.
LCG Introduction John Gordon, STFC-RAL GDB September 9 th, 2008.
LCG Application Area Meeting, March 10 th 2004 Status of LCG Generator Paolo Bartalini, CERN/PH.
June The LCG Generator Project Supporting Monte Carlo Generators in the LHC era P. Bartalini (University of Florida)
Overall Goal of the Project  Develop full functionality of CMS Tier-2 centers  Embed the Tier-2 centers in the LHC-GRID  Provide well documented and.
Organization and Management of ATLAS Nightly Builds F. Luehring a, E. Obreshkov b, D.Quarrie c, G. Rybkine d, A. Undrus e University of Indiana, USA a,
20/09/2006LCG AA 2006 Review1 Committee feedback to SPI.
SEAL Core Libraries and Services CLHEP Workshop 28 January 2003 P. Mato / CERN Shared Environment for Applications at LHC.
SEAL Project Core Libraries and Services 18 December 2002 P. Mato / CERN Shared Environment for Applications at LHC.
Feedback from LHC Experiments on using CLHEP Lorenzo Moneta CLHEP workshop 28 January 2003.
Software Engineering Overview DTI International Technology Service-Global Watch Mission “Mission to CERN in Distributed IT Applications” June 2004.
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
A. Aimar - EP/SFT LCG - Software Process & Infrastructure1 SPI Software Process & Infrastructure for LCG Project Overview LCG Application Area Internal.
W. Pokorski - EP/SFT Simulation Project1 Generator Services Subproject Witek Pokorski
Computing Performance Recommendations #10, #11, #12, #15, #16, #17.
Fabiola Gianotti, 13/05/2003 Simulation Project Leader T. Wenaus Framework A. Dell’Acqua WP Geant4 J.Apostolakis WP FLUKA Integration A.Ferrari WP Physics.
LCG – AA review 1 Simulation LCG/AA review Sept 2006.
LCG CERN David Foster LCG WP4 Meeting 20 th June 2002 LCG Project Status WP4 Meeting Presentation David Foster IT/LCG 20 June 2002.
Generator Services planning meeting Witek Pokorski
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
Last update: 03/03/ :37 LCG Grid Technology Area Quarterly Status & Progress Report SC2 February 6, 2004.
HERA – LHC Workshop, June Validation of simulation packages in LCG Validation of simulation packages in LCG M. Kirsanov (INR Moscow)
Simulation Project Overview (Very condensed) Torre Wenaus, BNL/CERN Simulation Project Leader LHCC Comprehensive Review.
MC4LHC w/s July Activities promoted by LCG-Generator Supporting Monte Carlo Generators in the LHC era P. Bartalini (University of Florida)
Feedback from CMS Andrew Lahiff STFC Rutherford Appleton Laboratory Contributions from Christoph Wissing, Bockjoo Kim, Alessandro Degano CernVM Users Workshop.
20 October 2005 LCG Generator Services monthly meeting, CERN Validation of GENSER & News on GENSER Alexander Toropin LCG Generator Services monthly meeting.
LCG Generator Monthly Meeting, September 25 th 2003 Status Of The Generator Project And Feedbacks From The MC4LHC Steering Group Paolo Bartalini CERN EP.
The interface to EvtGen in CMS Roberto Covarelli University of Rochester EvtGen workshop, 06/12/2010.
SPI Software Process & Infrastructure Project Plan 2004 H1 LCG-PEB Meeting - 06 April 2004 Alberto AIMAR
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
WLCG Accounting Task Force Update Julia Andreeva CERN GDB, 8 th of June,
Comments on SPI. General remarks Essentially all goals set out in the RTAG report have been achieved. However, the roles defined (Section 9) have not.
LCG Introduction John Gordon, STFC-RAL GDB June 11 th, 2008.
September CHEP 2004 LCG Generator P. Bartalini (University of Florida) F. Ambroglini, S. Belov, J. Cuevas Maestro, L. Dudko, M. Kirsanov, S. Makarychev,
Generator Services planning meeting Witek Pokorski
ALICE analysis preservation
LCG Generator Services project
Generator Services planning meeting
Olof Bärring LCG-LHCC Review, 22nd September 2008
P. Bartalini (University of Florida)
Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002
Simulation Project Structure and tasks
Simulation Project Structure and tasks
Beta releases and Product Management
Presentation transcript:

LCG Generator Meeting, December 11 th 2003 Introduction to the LCG Generator Monthly Meeting

LCG Generator Meeting, December 11 th 2003P.Bartalini – CERN EP division Work Packages and Milestones  WP1: GENERATOR LIBRARY  GENSER Beta (was released on schedule end September 2003)  New version soon mostly to update SCRAM configuration (I.Seluzhenkov)  First C++ Generator in GENSER (end 2003)  Delayed  Feasibility study for Sherpa inclusion (F.Krauss, S. Makarychev)  LHAPDF in GENSER (end January 2004)  Make available Fermilab v. (W.Giele) or wait for Durham v. (M.R.Walley) ?  COMPHEP, ALPGEN and EVTGEN in GENSER (end March 2004)  Some activity already for ALPGEN (F.Ambroglini) and COMPHEP (A.Sherstnev) inclusions.

LCG Generator Meeting, December 11 th 2003P.Bartalini – CERN EP division Work Packages and Milestones  WP2: STORAGE, EVENT INTERFACES AND PARTICLE SERVICES  Agreement on formats for common samples (end February 2003)  Recent and Future LCG Generator Meetings dedicated to this topic  HepMC evaluation (?)  LCG ressources not identified yet. Keep in touch with CLHEP.  WP3: COMMON EVENT FILES, EVENT DATA BASE  MCDB in production in the LCG environment (end April 2004)  New project starting (L.Dudko)  Proposal for event production environment (end May 2004)  Will be based on existing tools from LHC simulation frameworks  WP4: TUNING AND VALIDATION OF EVENT GENERATORS  HIJING debug&validation  Recent activity in this area (V.Uzhinsky)  Proposal for validation framework (end June 2004)  Will be based on existing tools: JetWeb and MC-Tester

LCG Generator Meeting, December 11 th 2003P.Bartalini – CERN EP division MC4LHC Feedbacks  LCG Generator activity and Milestones approved.  It is recommended to improve the collaboration with the MC authors.  The turn over and the possible loss of well trained people can represent a big problem as the experiments will soon rely on GENSER.

LCG Generator Meeting, December 11 th 2003P.Bartalini – CERN EP division WEB pageWEB page: -- links to relevant documents and to CVS repository CDS Agenda HomeCDS Agenda Home > Projects > LHC Computing Grid > Physics GeneratorsProjectsLHC Computing GridPhysics Generators -- minutes of meetings, slides of presentations Applications area mailing list: Meetings: -- Kick off meeting in June (mini-workshop) -- During MC4LHC workshop (in July) -- Last Thursday of the month at 5 PM in 32-1-A24 (VRVS connection in Desert or in Island room) -- December meeting anticipated becouse of Chritstmas holidays -- Workshop with authors in March 2004 (dates not defined yet) Organisational Issues

LCG Generator Meeting, December 11 th 2003P.Bartalini – CERN EP division BACKUP

LCG Generator Meeting, December 11 th 2003P.Bartalini – CERN EP division GENSER: Progress Report  GENSER was the first repository in the Simulation project  Complete migration of MCDB  Inclusion of the Top priority packages has been achieved  Convenient «compact» distribution.  Guaranteed installation on all the LCG supported platforms.  MC structure just automatically reorganised using macros, end users can patch the code.  Safe Double Versioning (Package*Subpackage)  GENSER BETA release available end september 2003 GENSER BETA  Documentation:  GENSER is distributed in /afs/cern.ch/sw/lcg/app/releases/GENSER  Currently tested by ALICE, ATLAS and CMS  first user reports (from A. Moersch, G. Stavropolous, F. Moortgat).  Package versions agreed by contact persons in MC projects and/or by the volunteered beta testers.  Simple procedure to include additional versions and bug fixes.

LCG Generator Meeting, December 11 th 2003P.Bartalini – CERN EP division Are the MC packages inside or outside the LCG generator repository ?  There are two possibilities for the MC generator packages. 1) To fully store the MC generator code in GENSER defining the corresponding sub-package. 2) To install the MC generator as external software packages in the LCG environment and to store in GENSER just tests suites and other related code (examples etc.). Just a technical issue! For each MC package an ad-hoc solution should be found taking into account the user requirements

LCG Generator Meeting, December 11 th 2003P.Bartalini – CERN EP division Between Two Worlds  Small TH groups  Old/Huge Fortran packages still in development  Cannot spend all the time to give user support  Large Experiments  C++ Frameworks  Challenging requirements