API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.

Slides:



Advertisements
Similar presentations
SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
Advertisements

SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Tim Haeberle API SC Winter Meeting
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
1 David Miller, PE, F.ASCE Director, Standards API ECS Reorganization Update.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
TG7 Issues on RP 13D Rheology and Hydraulics Mario Zamora Exploration & Production Standards Conference API Subcommittee 13 June 27 – July 1, 2011.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
API Subcommittee 6 Winter meeting 2015 – TG1 Pipeline and Valves Standards Report Rick Faircloth January 4 th, 2014.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
API - OGP Task Force Update API 2013 Winter Standards Meeting January, 2013 Presented by: Dan Mueller Vice-Chairman API CSOEM.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
TG Chair: Darren Bane (BHI)
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Potential Risks, Limitations, And Failure Mechanisms Arising From Fastener Design, Manufacture, Material, And Coating Selection Prepared for the National.
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
Completion & Production Services
TG Chair: Mark Brinsden Shell
Updates from SC18 Summer Meeting
Tim Haeberle API SC Winter Meeting
Task Group API 19SS Sand Screens
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
وكيفية عمل التقدير النجمي
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
Status Update on API 16Q / 16R / 16F
2016 Exploration & Production Standards Conference Subcommittee 10
Specification on float equipment
ISO TC64/SC4/WG2 May 2011 status
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16B June 2017 Specification for Coiled Tubing, Snubbing and Wireline Well Control Stack Equipment Chairman – Alex Sas-Jaworsky PE Vice-Chairman –
2016 Exploration & Production Summer Standards Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Specification on float equipment
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API 16 AR Specification for Drill-through Equipment Remanufacturing
SC 18 Liaison Report Winter 2012
TGg Report to the IEEE Working Group
CSOEM Materials Advisory Resource Group
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16C Choke and Kill Equipment
API 16RCD January 2019 Specification for Rotating Control Devices
API RP 59 Well Control Operations Chair – Tom Proehl
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman

API WIWC TG-5   Technologies Addressed Coiled Tubing Snubbing/Hydraulic Workover Wireline (Slickline and E-Line)

API WIWC TG-5   Standards Developed Recommended Practice 16ST Coiled Tubing Well Control Equipment Systems First Edition – March 2009

API WIWC TG-5   2014 RP 16ST TG Membership Operators (3) CT Vendors (6) Manufacturers (3) Consultants (1) Regulatory (1)

API WIWC TG-5   Current Activities 5-Year Review of RP 16ST Further Align RP 16ST Standards with Established SC16 Standards to Maintain Consistency Where Possible

API WIWC TG-5   RP 16ST Review Priority Well Control Equipment Operating Systems (Pumps & Accumulators) Establish Basis for Maximum Ram Actuation Time (Response Time) Align with Spec 16D (where possible)

API WIWC TG-5   RP 16ST Review Priority Conducted Preliminary Testing of Hydraulic Power Fluids at Various Temperatures to Establish Basis for Maximum Ram Actuation Times: February 6-7, 2013 – 95VI ISO 46 AW August 27-28, 2013 – ISO 10 Syn.

API WIWC TG-5

  RP 16ST Review Priority January 8, 2014 TG Meeting Discussed Test Results for CT Rams Proposal for CT SBR is 10-Seconds Proposal for all Other Rams in CT Stack is 30-Seconds.

API WIWC TG-5   RP 16ST Review Priority May 14, 2014 TG Meeting Rewriting RP Sections to Require “Emergency” SBR for All CT Pressure Categories

API WIWC TG-5   RP 16ST Review Priority May 14, 2014 TG Meeting Rewriting RP Accumulator Design Sections to More Closely Align With API Spec 16D

API WIWC TG-5   RP 16ST Review Priority Upon Final Ballot Resolution of API Spec 16C, Revise RP 16ST Sections Related to Well Control Choke and Kill Lines

API WIWC TG-5   RP 16ST Review Priority Well Control Equipment Repair & Remanufacture Issues (small rams) Reference STD 16AR (if possible, or) Establish Recommendations Within RP 16ST Consistent with STD 16 AR

API WIWC TG-5   RP 16ST Review Priority Conducting Line-By-Line Review of Remainder of RP 16ST to Correct Typos, Reconfirm Value of Standards and Clarify Performance Expectations

API WIWC TG-5   RP 16ST Review Priority Request That Current Edition of API RP 16ST be Reaffirmed for Two Years to Allow TG to Complete Critical Revisions and Submit 2 nd Ed. Letter Ballot in 2 nd Quarter, 2016.