19-September-2007 Helsinki EURISOL-EURONS Town Meeting 1/6 High-Performance Pulsed-Power for Radioactive Ion Beams HP 3 RIB Luis Redondo ISEL, IST, CFNUL,

Slides:



Advertisements
Similar presentations
Perspectives of Croatian experimental nuclear physics Neven Soić Division of experimental physics Ruđer Bošković Institute NuPECC meeting 13. Jun 2008.
Advertisements

ESF Workshop The future of stable beams in Nuclear Astrophysics NCSR Demokritos, Athens, Greece December 14-15, 2007 Organizing Committee S. Harissopulos.
The Rare RI Ring Facility at RIKEN RI Beam Factory M. Wakasugi, and Rare RI Ring Collaborators RIKEN, Nishina Center, Japan ARIS2014.
ISIS Accelerator Division
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
1/13 T. Inoue NEUTRAL BEAM INJECTION R&D on Ion Sources and Accelerators FT/1-2Ra: 1 MeV accelerator and uniformity R&D on a High Energy Accelerator and.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
CERN ISOLDE facility 1 CATHI Final Review Meeting BARCELONA - SPAIN High Voltage and Front End prepared by R.A.Barlow TE-ABT-EC CERN Acknowledgement: B.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
ISOL-AT : ISOL Actinide Targets (JRA1) ISOLDE UCx over more than 25 years Actinide targets ISOLDE 2006 (>56%) UO2 + 6C → UC2 + 2C + 2CO ThO2 + 6C → ThC2.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Jefferson Lab Strategic Planning Divisional Town Meeting Mission Statement of your Division – What is or should be the mission statement of your division?
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
Structures and shapes from ground state properties 1.Nuclear properties from laser spectroscopy 2.Status of laser measurements of moments and radii 3.New.
Welcome to the CHARMS See – Tea Sunday, October 11, 2015 Release of Light Alkalis (Li, Na, K) From ISOLDE Targets Strahinja Lukić,
Isotope R&D Facility A proposed addition to the HRIBF driver upgrade Mike Saltmarsh HRIBF Users’ Meeting Nov 13 th 2009.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Ultra-Fast Damping Ring Kicker Modulator Development at SLAC Status update for ILC2010 C. Burkhart, A. Krasnykh, R. Larsen, & T. Tang March 27, 2010.
CERN ISOLDE / HIE ISOLDE 1 Isolde Target Modulator Prototype development prepared by T. Gharsa TE-ABT-EC CERN.
CERN ISOLDE facility 1 HIE ISOLDE – Workshop 2013 Targets and Front Ends “A new modulator system” Contribution: by T.Fowler, J.Schipper, B.Bleus, T.Gharsa/TE-ABT-EC.
Klystron Modulator for Proton Driver
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
F Project X Overview Dave McGinnis October 12, 2007.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
K. Riisager, TA8 ISOLDEEURONS PCC-Meeting, Mainz (Germany), April 2006 Recent highlights from ISOLDE News from the facility –Users meeting, February.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
Operations, Test facilities, CF&S Tom Himel SLAC.
RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE.
24 January 2001J. Lettry1 ISOLDE Introduction –PSB-beam, Targets –Ion-sources Facility performance –Front-ends and robots –Target production –Safety.
JRA10 Instrumentation for Precise Nuclear Measurements with Trapped Ion Techniques
R&D on complementary detectors and devices for nuclear structure and reaction mechanism studies R&D on complementary detectors and devices for nuclear.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
MTE vs CT D.Manglunki for BE/OP - pictures from M.Giovannozzi - details in “Fifty years of the CERN Proton Synchrotron (Vol I)” CERN
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
Trends in Heavy Ion Physics Research, Dubna, May Present and future physics possibilities at ISOLDE Karsten Riisager PH Department, CERN
22 Set 2009 EPPC 09 CERN September /14 Solid-State MARX Type Circuit for the ISOLDE Target Voltage Modulator L.M. Redondo*, J. Fernando Silva.
ENLIGHT,12/2/20021 Health and Science, can CERN contribute? The Mission of CERN (1954): “The Organization shall provide for collaboration among European.
SECONDARY-BEAM PRODUCTION: PROTONS VERSUS HEAVY IONS A. Kelić, S. Lukić, M. V. Ricciardi, K.-H. Schmidt GSI, Darmstadt, Germany  Present knowledge on.
Last years of the SC-ISOLDE and move to the PS-booster H. Haas CICECO, Universidade de Aveiro, Aveiro, Portugal and CERN/PH-IS, CH-1211 Geneve-23,
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
The User-friendly On-line Diffusion Chamber Jaime E. Avilés Acosta August 13, 2015.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, February 11, 2008 ISOLDE scientific coordinator’s report INTC meeting, February.
ADSR Cockcroft ins., 10,July, 2009 Status of PAMELA, T.Yokoi Status of PAMELA Takeichiro Yokoi(JAI)
Beam Preparation, Task 9 Department of Physics, University of Jyväskylä.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
High Power Target Studies at CERN-ISOLDE Tania M. Mendonca, Melanie Delonca, Veronique Ghetta, Etam Noah, Thierry Stora.
RECENT TRENDS IN POWER SYSTEMS
Comprehensive investigation of the decay losses in the ISOL extraction method KP2 Seminar, Strahinja Lukić.
AN INTRODUCTION Jaime Avilés Acosta. WHAT IS ISOLDE?  Isotope Separator On-Line DEvice  Dedicated to producing radionuclides  Applications in nuclear.
Discussions on preparations for future (joint) research projects
M.J. Barnes : Canadian Involvement with LHC
Thales Klystrons for Linacs
A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017
Accelerator Research and Innovation for European Science and Society
the s process: messages from stellar He burning
Power converters for 2GeV injection
Technical Session CERN ISOLDE – Workshop 2016
Fast Kicker R&D in the Americas Region
Superbeams with SPL at CERN
Present and Future test facilities for High-intensity Targetry CERN
SLHC-PP kick-off meeting, CERN 9 April 2008
Presentation transcript:

19-September-2007 Helsinki EURISOL-EURONS Town Meeting 1/6 High-Performance Pulsed-Power for Radioactive Ion Beams HP 3 RIB Luis Redondo ISEL, IST, CFNUL, ITN CERN-ISOLDE JRA - 3

19-September-2007 Helsinki EURISOL-EURONS Town Meeting 2/6 20 years ago, the Portuguese collaboration started at ISOLDE- CERN. We are known users of short-lived radioactive isotope beams with different techniques, for applied research; 15 years ago, we started ion-source development at GSI; 10 years ago, we started innovative pulsed-power development using new topologies and semiconductor devices.Motivation

19-September-2007 Helsinki EURISOL-EURONS Town Meeting 3/6 Recovery region ISOLDE 60 kV Target Voltage swing during proton impact This JRA proposal aims to go further ahead … These 20 years of interdisciplinary research resulted in a technological transfer approved 25 k€ Portuguese funding project, associated with the development of a new negative voltage target modulator for ISOLDE-CERN, to improve short-lived radioactive negative ion beam yield, < 50ms.Motivation

19-September-2007 Helsinki EURISOL-EURONS Town Meeting 4/6 Core activity (4 years) cope with the next generation of RIB facilities.The core activity off this JRA is the development of high-performance, fast & stable, pulsed-power modulators for effective-use of RIB, improving the present status and cope with the next generation of RIB facilities.

19-September-2007 Helsinki EURISOL-EURONS Town Meeting 5/6 RESULTING on improved efficiency, flexibility and performance of installed equipment. CONTRIBUTING to the effective-use of RIB and to cope with new Technology transfer coming challenges for the new RIB facilities & Technology transfer.Innovation? This JRA-3 explores and applies the state-of-the-art of: NEW POWER SEMICONDUCTOR TECHNOLOGY and original CIRCUIT TOPOLOGY CONCEPS WITH MODULAR ASSEMBLING Today similar technology is applied to the most challenging INDUSTRIAL APPLICATIONS, … being now proposed to replace existing modulators of RIB facilities.

19-September-2007 Helsinki EURISOL-EURONS Town Meeting 6/6 For whom? For users of the ISOLDE-CERN facility, new voltage target modulators => faster stability & ion sources => improvement of short-lived radioactive beam yields (< 1ms) For users of the CERN accelerators: new current pulsed modulators for the PS booster kicker magnets. For users of GENERAL TNA facilities where beam tuning match pulsed-power applications, technological transfer. This JRA aims to:This JRA aims to: gather more capabilities exchange of know-how students to speed-up R&D WHILE extending it to other applications and TNA facilities. - With the international collaboration and €  Portuguese funding can be renewed and increased!