DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Project Acquisition Under the Consolidated Procurement Code John St. C. White State.

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
1 Bid And Proposal Evaluation Bill Shelton Scott Norton
SURVIVING YOUR PROCUREMENT CODE’S REQUIREMENTS
Presented by: Kathryn Hodges, NH
1. Goals High Risk Activity – National reviews consistently find problems in the methodology Recipients (WYDOT) and Sub-recipients (you) use when making.
Trade Finance & Factoring
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
OH 2-1 Agenda Sign in for all classes to earn credit for class Sign up for Presentations A test final test question will come from each of the group presentations.
PROJECT DELIVERY SYSTEMS
PROCEDURES FOR SELECTING THE CONTRACTOR
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
1 CDBG Procurement Requirements For Local Officials.
Contract Financing Theresa A. Stevens March 12, 2007 Part 2 Non-Commercial Item Purchase Financing FAR Subpart 32.1 PIP Level II Presentation.
Expectations What your Construction Professional, Architect, Construction Manager/Contractor expects from you? What you can expect from your Construction.
Construction Engineering 221 Cost Estimating and Bidding.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
GWAC Ordering Procedures Overview
U.S. General Services Administration Term Contracts Drand Dixon Sales Contracting Officer Federal Acquisition Services Drand Dixon Sales Contracting Officer.
How to Prevent Findings Part 2 Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
Construction Contracts and Project Delivery Methods
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
Selling to the Federal Government NATIONAL MATCHMAKING CONFERENCE CHICAGO, IL SBA OFFICE OF GOVERNMENT CONTRACTING.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
SCHOOL BUILDING AID PROGRAM CHANGES 2014 AND BEYOND.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
Rabbanai T. Morgan Current as of 26 January 2006 Protests.
1 Commonwealth Project Management Division Bob Haugh Project Management Division November 15, 2010 Revision of.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Water Supply System Meeting #3 – Allocated FY
PROPOSALS.
MAKING IT HAPPEN. TRB 88 th Annual Meeting Risk Management in Public-Private Partnerships January 14, 2009 Statutory and Public Policy Approaches to PPP.
Budget Workshop: Fiscal Policies, Process, and Budget Guidelines Board of Governors April 21, 2005.
Bonneville Power Administration Significance of Rating Agency Ratings May 2002 Predicisional.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Allowances, Unit Prices, and Alternates ACT
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
The Business of Buying at UT Arlington UT Arlington Procurement Division.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
For more course tutorials visit
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
2016 SAME Small Business Conference - Atlanta
FAR Part 2 - Definitions of Words and Terms
CON 280: Source Selection and the Administration of Service Contracts
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
D31SQ Service Procurement and Provision
PROJECT DELIVERY METHODS
Procurement.
Source Selection Training
Procurement Planning Mani Ram Gelal
Setting Up a New Contract
Software Reviews.
Presentation transcript:

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Project Acquisition Under the Consolidated Procurement Code John St. C. White State Engineer

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Choosing the Project Delivery Method Most Advantageous to the State SC Code Ann §

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Factors to Consider When Choosing a Project Delivery Method Regulation (B)

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Choosing the Project Delivery Method – Factors to Consider Facility: –Facility type –Complexity –Extent to which design requirements for the infrastructure facility are known, stable, and established in writing Location –Unique characteristics of site(s) that would impact project

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Choosing the Project Delivery Method – Factors to Consider Time –Earliest date on-site work can start –Deadline for completion –Critical intermediate deadlines Financing to support project/facility life cycle –Projected life cycle costs –Potential sources of funding –Projected cash flow requirements

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Choosing the Project Delivery Method – Factors to Consider Available Project Delivery Methods –Comparative advantages & disadvantages of each for the project –How each method might be configured and applied to fulfill requirements –Methods used on similar projects in the past and the results Decision Making/Administrative Services –Available decision makers and administrators –Their relevant experiences, skills, and abilities –Extent to which decision-making and administration can be assigned to others by contract

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm What type of Project Delivery Methods are Appropriate for Guaranteed Performance Contracting Design-Build Design-Build-Maintain Design-Build-Operate-Maintain Design-Build-Finance Design-Build-Finance-Maintain Design-Build-Finance-Operate-Maintain

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Selecting the Source Selection Method SC Code Ann § Design-Build: Competitive Sealed Proposals pursuant to § Guaranteed Performance Contracting See Also § : Competitive Sealed Proposals pursuant to §

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Selecting Additional Procurement Procedures SC Code Ann § (2)(c) & (3)(b) If you determine the cost of preparing proposals is high in view of the size, estimated price, and complexity of the procurement, you may: –Prequalify Offerors in accordance with § –Short list Proposals –Pay Stipends Means of Selecting Independent Peer Reviewer

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Select Performance Phase Security Portion of Contract that does not include financing, maintenance, and operations –100% Performance Bond required –100% Payment Bond required

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Select Performance Phase Security Maintenance and operations – optional security –Letters of credit in an amount appropriate to cover the cost to the governmental body of preventing infrastructure service interruptions for a period up to 12 Months –Appropriate written guarantees to secure the recovery of reprocurement costs in the event of default of the contractor

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Written Determination of Choice of Project Delivery Method Chosen method and why (Factors for consideration above) Chosen source selection method and why Chosen alternative procedures and why Chosen performance phase security and why

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Submit the Determination to the State Engineer State Engineer has ten days to review and approve or disapprove

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Sample Documents for the Procurement Process Currently in Draft Form Available for Viewing at – training-presentations.phtm –See bottom of page GPC Schedules SE-800 Series Documents

DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm