RO/RO RAMP TO PLATFORM INTERFACE JLOTS & LOGISTICS FROM THE SEA R&D SYMPOSIUM 29 - 31 January 2002 Jason Chang NAVSEA Carderock (301)227-1400.

Slides:



Advertisements
Similar presentations
Jimmy E. Fowler Coastal and Hydraulics Laboratory
Advertisements

Lesson 4.8 Righting Ship CL d X PENDULUM LENGTH - 10 TO 25 FT.
EFFECTS OF VESSEL LENGTH AND DESIGN ON MOTIONS, SAFETY AND DOWNTIME. DON BASS (MUN)
Managing the Environmental Challenge 1 Gateway to Asia Conference November 2014.
Modular Crane Control System (MCCS)
ADVANCED SHIPBOARD CRANE MOTION CONTROL SYSTEM ATD
31 January 2002JLOTS Symposium1 Advanced Lighter Simulator Update 31 Jan 2002 Mike Christie NSWC Carderock Division, Code 282 (301)
Seismic code and design standard for transmission line and substation in Japan September 3, 2003 Hajime Imura The Kansai Electric Power Co.,Inc.
On-board reassessment of sea conditions for marine operations by Christophe Capitant (presented by Christophe Maisondieu) PrISM_MSEM System.
SHIP STRUCTURES Unique Structures (6.1) What are they optimized for?
FORM 1014HD – NOTICE OF SURFACE DISCHARGE OF HYDROSTATIC TEST WATER.
Vehicle Tracking/Payload Release System For Small UAV Project Team
INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 8 th June 2006, Athens (GR) OIL SEA HARVESTER TST4-CT ww.osh-project.org THE OIL SEA HARVESTER.
Copyright Coast Guard Auxiliary Association, Inc.
The Final Link in the Sealift Chain
Geotechnical and Structures Laboratory Tommy Bevins US Army Engineer Research and Development Center Vicksburg, Mississippi JLOTS Force Projection from.
May 1, 2007 Great Lakes Task Force Washington, DC Teresa Harten ETV Director, USEPA, ORD National Risk Management Research Laboratory May 1, 2007 Great.
Business Processes of Harbours and Port Terminals Expert Group for Business Processes of Harbours and Port Terminals BUSINESS PROCESSES OF HARBOURS AND.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review WET-NZ Multi-Mode Wave Energy Converter Advancement Project Justin Klure, Program.
Slamming Impact Loads on Large High-Speed Naval Craft ASNE 2008
Strategic Sealift JLOTS R&D Overview
Advanced Network Technologies Division Wireless Communication Technologies Group 3/11/2005GAO Visit 1 RFID-Assisted Indoor Localization and Communication.
MPF(F) R&D MPF(F) Cargo Operations R&D Joint Seabased Theatre Access Workshop February Duck, NC Authors: Martin Fink, Arthur Rausch,
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
MOBILE OFFSHORE BASE (MOB)
FEASIBILITY STUDY ON INTELLIGENT MARINE TRAFFIC SYSTEM K. Hasegawa, Y. Shigemori, Y. Ichiyama Dept. of Naval Architecture & Ocean Engineering, Osaka University,
IMPROVED CONTAINER LIFTING FRAME (ICLF). IMPROVED CONTAINER LIFTING FRAME - MARK II (ICLF-Mk II) Quantum Engineering Design, Inc (QED) 01/28/04 OBJECTIVES.
CHRONOS-CONTROL COMPUTER CONTROL USING TI CHRONOS Cihat Keser Yeditepe University
Petroleum Engineering 406 Lesson 9b Station Keeping.
Increase in personnel safety during turbine access Simultaneous increase in accessibility Employment of small and middle vessels Compact and easy building.
Military Sealift Command PM-5 JLOTS Team Sealift - Ships, People, Innovation.
1 Joint Logistics Over-The-Shore (JLOTS ) Throughput Modeling Tool (JTMT) for The Ninth Annual JLOTS /Logistics-from-the-Sea Symposium 28 January 2004.
Multipurpose Polar Icebreaking Subsea Work Vessel
Office of Marine Safety M/V ETHAN ALLEN Rob Henry.
Establishing Ballast Water Test Platforms in the U.S. Carolyn Junemann, USDOT Maritime Administration.
The Final Link in the Sealift Chain Amphibious Construction Battalion Two.
Boat Crew Qualification Sessions Qualification Examiner Auxiliary Boat Crew Training Manual update December 2, 2006 Berlin, MA This presentation will be.
Chalmers University of Technology Department of Mathematical Sciences Göteborg, Sweden Effect of whipping on ship fatigue- Gaussian VS non-Gaussian modelling.
U. S. Coast Guard ANS Program Update September 10, 2003 ANSTF Western Regional Panel Mtg Presented by LCDR Kathy Moore Chief, Environmental Standards Division.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx.
“First In the Nation” Diverging Diamond Interchange IS 44 and MO 13 - Springfield, MO Joseph C Rickman, PE, ACTAR District Traffic Engineer MoDOT – Springfield.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
1 November 6, 2003 Systems Sustainment Management, Fundamentals LOG-102 John Baranowski Defense Acquisition University Program Director, Sustainment.
OSH PMC MEETING N°7 9 th June 2006, Athens (GR) OIL SEA HARVESTER TST4-CT Oil Sea Harvester Project OSH design : Hydrodynamics.
Ship-based UAV Recovery System (SURS) Launch and Recovery of Manned and Unmanned Vehicles from Marine Platforms 2010 Symposium March 8-9, 2010.
Shape Anticipate InnovateLead Shape, Anticipate, Innovate, and Lead MAJ Jim Gray DA G-4 FP DSN JLOTS JIPT Update LCDR Shaugn Ostrowski N422 DSN.
SERPENTINE COURSE Develop relationships to fixed objects while maneuvering to port/starboard. Become familiar with the steering capabilities of the vessel.
High Speed Vessel Fendering System Design Presenters: Cameron Clark Dave Maharaj Okason Morrison Jean-Pierre Njante Alexandra Ortiz Advisor: Prof. Sadegh.
May 18-19, The research presented at the symposium was supported by the Acquisition Chair of the Graduate School of Business & Public Policy.
UNCLASSIFIED 13 Jan January 2004 LtCol Larry Ryder, USMC MCCDC USMC High Speed Vessel Project Overview.
Defense Science Board Task Force on Sea Basing. Summary of Conclusions Sea basing - a critical future national competence for assuring access to areas.
Supply Hazmat 4-09 Florida Defense Support Task Force Grant Program FY Feasibility Study For Proposed Turning Basin At Naval Support Activity.
Engineer Research and Development Center US Army Corps of Engineers Nearshore Breakwater System Jeffrey A. Melby, PhD.
Rapid Strategic Lift Ship (RSLS) FY 04 Feasibility Studies February 2005 SEABASE CONUS Steven Wynn NAVSEA 05D1
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
MOBILE OFFSHORE BASE RESEARCH CHALLENGES Dr. Paul Palo U. S. Naval Facilities Engineering Service Center Centre for Ships and Ocean Structures Norwegian.
Shipboard Crane Pendulation Control System Frank Leban Jeff Green NSWCCD 28 Jan 2004 Carderock.
Dabney P. Hegg Senior Professional Staff U.S. Senate Committee on Commerce, Science and Transportation.
Sector San Diego Area Committee and Incident Management Division Update RRT9 June 27, 2012.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Head of Hydrodynamic department
THE OIL SEA HARVESTER SYSTEM :
Navigating the Resident Quarterly Development Plan
Applications of Trigonometry
Upper Arm Extremity Exerciser – Concept Review
Licton Springs P-Patch Food for Thought
Current Status for Ion Polarization Studies
Shipboard Cable Trays 07/24/19 Atlanta, GA
Presentation transcript:

RO/RO RAMP TO PLATFORM INTERFACE JLOTS & LOGISTICS FROM THE SEA R&D SYMPOSIUM January 2002 Jason Chang NAVSEA Carderock (301)

RO/RO Ramp to Platform Interface Current Operational Issues Program Objectives Benefits Concepts Project Plan & Status NPS Evaluation Questions

RO/RO Ramp to Platform Interface Existing and planned modular platforms do not compensate for the relative motion between the ramp and RRDF. Ship ramps designed for calm water pier operations, not for dynamic motions. Ramp stresses exceed design levels.

RO/RO Ramp to Platform Interface Objective Develop a SS3 interface capability between ramps of existing RO/RO ships and existing and future causeway platforms RO/RO Discharge Facility (RRDF) Ramp/Platform Motion Compensator RO/RO Ship Ramp

RO/RO Ramp to Platform Interface Ability to conduct RO/RO operations through Sea State 3 Reduce relative motion between ramp and RRDF Prevent ramp stress levels from exceeding design limits Avoid costly RO/RO ship ramp modifications Enable operations with MPF, RRF, commercial and foreign RO/RO vessels Benefits Increased productivity & safety

RO/RO Ramp to Platform Interface Ramp/Platform Motion Compensator Concept 1

RO/RO Ramp to Platform Interface Ramp/Platform Motion Compensator Concept 2

RO/RO Ramp to Platform Interface FY01: Re-Issued BAA Completed 1 st round evaluation 2 concepts selected for further development and evaluation FY02: Preliminary designs for simulation completed Evaluation of proposed concepts by Naval Postgraduate School Final down select and continued development.

RO/RO Ramp to Platform Interface Naval Postgraduate School Concept Evaluation -Two ramps (Cape T, LMSR) in stern ramp configuration. -SS3 with 5 ft significant wave height (Pierson Moscowitz spectrum). - Beam and Quartering seas (45 , 90  and 135  headings). -Two tanks (M1A1) offset a maximum distance from the ramp centerline at mid-span. o

RO/RO Ramp to Platform Interface Information and updates can be obtained at:

RO/RO Ramp to Platform Interface ?