Harding Elementary School Exterior Repairs & Select Roofing Replacement 11/18/2014.

Slides:



Advertisements
Similar presentations
ROOF REPLACEMENT PROJECT DOREEN CHRISTIAN La ROCHE OFFICE OF OPERATIONS PROJECT MANAGER.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
The Dalles Middle School
Above Ground Storage Tanks &
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
CHAPTER 9 Thermal & Moisture Protection
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
FRED POWELL POWELL & PARTNERS, ARCHITECTS West Contra Costa Unified School District.
Liquid Rubber is the world’s only EPDM rubber in liquid form. Liquid Rubber provides a seamless, single coat roof coating that can be applied up to 6.
What Is EIFS Exterior Insulation and Finish Systems (EIFS) is a multi-layered exterior wall system that is composed of foam board insulation that.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
Ocean Dunes Special Assessment 2013 o Problems with Roofs Building Envelope and Generators o Roofs – No Name Storm o Generators – Rust, mechanical problems.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
3. The Roof Has Problems If the roof has water damage, it may be caused by old or damaged shingles, or improper flashing. It's cheap and relatively easy.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Water Damage to Homes and Buildings is Ugly!. Leaks in Homes & Buildings are Expensive ….Sometimes Profoundly So Leaks = Property Damage Mold Lawyers.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Building Plans.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.
22 Elevations Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Introduction to Elevations Elevation –An.
Understanding Manufactured Home Inspections. Tips for a Professional Inspection  Ask for referrals  Call NACHI / InspectorSEEK.com  Hire a licensed.
Computer Visualization Final Project The Rusakov Club Sheridan College Architectural Technology Course: Architectural Computer Visualization 1 By Jonathan.
POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING October 14, 2014.
Competency: Draw exterior elevations
Pool Project SWIMMING POOL 3500sq ft. DECK AREA 7000sq ft. SHELTER400sq ft. EQUIPMENT ROOM/STORAGE SHELTER 1400sq ft.
BEFORE AFTER SHANKLIN – PARAPET RESTORATION FY 15 Before and After SHANKLIN – PARAPET RESTORATION.
Exercise 9 Attributes and Attribute Reporting. Exercise: Attributing and Reporting the Citron House.
Roof Hook SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Presented By Richard Cook. Tennessee Building and Moisture Analysts, Inc Hardcoat or Synthetic? 2.
AHU-18 replacement and AHU-16 & 17 restoration
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
South Greenville Recreation Center and Park Master Plan.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Best waterproofing solutions for your home. The best way to be prepared for monsoon and winters is prepping and checking your plumbing system, roof.
THE PORTLAND BUILDING Portland Historic Landmarks Commission Briefing #1 November 26, 2012.
San Francisco Fire Department Facilities Update.
Concho River Improvements February 18, River Improvements Project Consideration of approving matters related to Concho River improvements: Review.
OHLONE ELEMENTARY SCHOOL, HERCULES CONSTRUCTION PROGRESS REPORT WCCUSD FACILITY SUB-COMMITTEE MEETING AUG. 14, 2012 POWELL & PARTNERS, ARCHITECTS.
TCF Volunteers Conference COL G. Dewey Yeatts, Ed.D. Vice President for Facilities and Engineering 25 February 2012.
Choose Right Retractable Awnings
Click here for the LIVE WEBCAM
Capital Improvements Presentation
Why We Arrived With Windows Upgrade Support ?
Competency: Draw exterior elevations
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Loudenslager Elementary School Pointing and Brick Repair.
Mount Vernon Community School
Lindleys Mill, Prospect Place, Sutton In Ashfield
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
SECTION EXISTING CONDITION PHOTOS
The projects in the following pages have been identified by our Building & Grounds Commission made up of local architects, engineers, contractors and finance.
Stoughton Public Library
Avera St. Luke’s Therapy Addition January 2012 Update
Request for Qualifications (RFQ) Architectural & Engineering Services for Seattle City Hall Plaza Restoration CDCM # Presubmittal Conference June.
Presentation transcript:

Harding Elementary School Exterior Repairs & Select Roofing Replacement 11/18/2014

 General ContractorBest Contracting Services, Inc.  Architect of RecordGrossman Design Group  Construction ManagerWillie Robinson

 Contract Amount $918,600  Notice of Award06/17/14  Notice to Proceed07/21/14  Completion 01/05/15

 Fabricating & installing Surround Window flashings is 95% complete.  Re-setting of Windows at Building A is 90% compete.  Stucco (scratch & brown coats) at Building A-1 upper parapet walls & west wall of Theatre is complete.  Installation of waterproof membrane and lathing at Building A-1 is 75% complete.  Clean-up, repair and environmental testing of water intrusion areas.

Building A-1: South wall at storefront.

Building A-1: Theatre West Wall – Stucco brown coasting.

Building A: 1 st floor windows re-installed.

Building A-1: Stucco brown coat at upper parapet wall.

Library Past Water Intrusion Damage _2 10/28/14.

Computer Lab Hygienist Clean –Up 10/04/14

Library Water Intrusion Repairs_3 11/06/14

Building A-1: Theatre West Wall, stucco brown coat.