M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Timing calibration in NEMO M. Circella Istituto Nazionale.

Slides:



Advertisements
Similar presentations
4/11/40 page 1 Department of Computer Engineering, Kasetsart University Introduction to Computer Communications and Networks CONSYL Digital Carrier.
Advertisements

Synchronous Digital Hierarchy Eleventh Meeting. History of Multiplexing Synchronous digital hierarchy (SDH) is a world- wide standard for digital communication.
NEMO Fase1 OPTICAL DATA TRANSPORT F. Ameli, M. Bonori, I.N.F.N. Sez. Roma1. VLVυT - Amsterdam 5-8 October Architecture Working Group NEMO Phase 1.
VLV T – Workshop 2003 C. A. Nicolau – VLV T - Amsterdam 5-8 October 2003 A 200-MHz FPGA based PMT acquisition electronics for NEMO experiment Read Out.
Electronic department A photonic network for data acquisition systems for deep-sea neutrino telescopes Presentation on behalf of the KM3NeT consortium.
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
FF-LYNX R. Castaldi, G. Magazzù, P. G. Verdini INFN – Sezione di Pisa G. Bianchi, L. Fanucci, S. Saponara, C. Tongiani Dipartimento di Ingegneria della.
Martino Ruppi – KM3NeT 16 – 18 April Pylos Clock distribution and absolute time calibration in NEMO phase 1 Martino Ruppi INFN di Bari.
P. Jansweijer Nikhef Amsterdam Electronics- Technology October 15, 20091VLVnT-09 Athens Measuring propagation delay over a coded serial communication channel.
E. Migneco, VLV T Workshop, Amsterdam, october 5-8, 2003 NEMO The NEMO Project Neutrino Mediterranean Observatory Istituto Nazionale di Fisica Nucleare.
Multiplexing. PDH Multiplexing Plesiochronous digital hierarchy (PDH) -each TDM stream was derived using a separate timing source -Justification.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
INFN Bari, Bologna, Catania, Genova, LNF, LNS, Napoli, Pisa, Roma Università Bari, Bologna, Catania, Genova, Napoli, Pisa, Roma “La Sapienza” CNR Istituto.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
25 km E offshore Catania 2000 m depth TSS Frame Buoy Junction Box e.o. connection e.o. cable from shore Shore laboratory, Port of Catania e.o. cable.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
The NEMO Project: Toward a km 3 Neutrino Telescope in the Mediterranean Sea M. Circella, INFN Bari NUPPAC-05, Nov The NEMO Project (NEutrino Mediterranean.
 NEMO The NEMO Status Report M.Taiuti on behalf of the NEMO Collaboration Merida, Yucatan, Mexico 30th International Cosmic Ray Conference.
VLVnT 2015 – Very Large Volume Neutrino Telescope 14 – 16 September 2015, University “Sapienza”, Rome - Italy Carlo A. Nicolau – INFN Sez. Roma
Characterization of the electro-optical transceivers in the KM3NeT optical network S.Pulvirenti, F. Ameli, A. D’Amico, G. Kieft, J-W Schmelling for KM3NeT.
Disk WP-4 “Information Technology” J. Hogenbirk/M. de Jong  Introduction (‘Antares biased’)  Design considerations  Recent developments  Summary.
Plesiochronous Digital Hierarchy. Telephone channel » 64 Kbps Primary Mux 30 channel Mbps - E1 24 channel Mbps - T1.
Salvatore Viola, INFN-LNS VLVνT 2011, Erlangen - October 12-14, 2011 Salvatore Viola 5th International Workshop on Very Large Volume Neutrino Telescopes.
September 11-12, 2013KM3NeT, CLBv2 Workshop Valencia Peter Jansweijer Nikhef Amsterdam Electronics- Technology Shore station brainstorm 1.
Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
GBT SCA overview Slide 1-5 Work status Slide 6-10 Shuaib Ahmad Khan.
Disk Towards a conceptual design M. de Jong  Introduction  Design considerations  Design concepts  Summary.
VLV T – Workshop 2003 Read Out and Data Transmission Working Group Synchronous Data Transmission Protocol for NEMO experiment.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
PeterJ Slide 1 Oct 14, 2008 Transfer exact timing using a coded data communication channel.
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
From NEMO to KM3NeT-Italy Carlo Alessandro Nicolau on behalf of the KM3NeT-Italy Collaboration Conference - Roma 22/5/2013.
LM32 DEVELOPMENTS ONGOING WORK ON TDCs AND OTHER ISSUES (LM32) Diego Real David Calvo CLB group online meeting, 27 March
F. Simeone – University “Sapienza” and INFN Sec. Roma1RICAP 11 Conference Roma May 2011 The data acquisition and transport design for NEMO phase.
F. Simeone – INFN, Sez. Roma1 RICAP07 Conference, Rome June 2007 Data taking system for NEMO experiment RICAP07.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
M. Circella, INFN Bari Time-calibration in NEMO VLVnT08 Time calibration in NEMO M. Circella, INFN Bari Time calibration The NEMO Phase 1&2 towers Time.
Top Requirement: PMT pulse timing accuracy (decision tree) What optical network? Ethernet Sonet Fibre channel and others Data store and forward (clock.
Firmware and Software for the PPM DU S. Anvar, H. Le Provost, Y.Moudden, F. Louis, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2011 March 30.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
23 April, 2008Gabriele Giovanetti – INFN - LNS1 New electronics architecture in NEMO – phase 2. Gabriele Giovanetti – INFN – LNS NEMO Phase 1: 4 floor.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
KM3NeT-Italy Collaboration meeting 28/11/2014 Sistema di trasmissione dati su fibra ottica: Junction Box Sara Pulvirenti.
A DWDM link for Real-Time data acquisition systems
Deep-sea neutrino telescopes
Using VDSL2 over Copper in the Vertical String
DAQ read out system Status Report
“FPGA shore station demonstrator for KM3NeT”
D. Lo Presti ON BEHALF OF NEMO COLLABORATION Microelectronics Group
M.Taiuti on behalf of the NEMO Collaboration
(NEutrino Mediterranean Observatory): Toward a km3 Neutrino Telescope
VLVNT08 Toulone April 2008 Low Power Multi-Dynamics Front-End Architecture for the OM of a Neutrino Underwater Telescope Domenico Lo Presti Istituto Nazionale.
A Sub-sea Node Network for KM3NeT
Junction Boxes for KM3NeT
ANTARES time calibration
Point-to-point connection between each DOM and the shore station
Commodity Flash ADC-FPGA Based Electronics for an
Read Out and Data Transmission Working Group
Data Communication Real-Time Semi Real-Time Store and forward
Presentation transcript:

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Timing calibration in NEMO M. Circella Istituto Nazionale di Fisica Nucleare, Bari on behalf of the NEMO Collaboration

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 NEMO Telescope layout Secondary JB 200 m 1 primary Junction Box 8 secondary Junction Boxes 64 towers 200 m grid pitch 64 PMT on each tower 4096 PMT in total Electro-optical cable to shore: 48 optical fibres 3 – 4 conductors Primary JB Tower 200 m 1400 m

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Tower Layout Junction Box FCM (Floor Control Module) Optical Module Mbps SDH STM-1 (155 Mbps) DWDM communications (2.5 Gbps) DWDM mux

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Front-end electronics (inside the Optical Modules) PMT ADC 8bit [100MHz] DOUT clk ADC 8bit [100MHz] DOUT clk Log. Compr. off1off2 com Sensors Out In ADC\DAC 10bit [Slow control] Offset & Gain Cal. 8 F C M FCM interface Mbps 432 kbps Vcc DSP Flash 256kX8 JTAG SCI Lock In PLLout FPGA Soft trigger FIFO To FCM Counter From FCM Full description of the NEMO Front-End electronics in Domenico Lo Presti’s and Carlo Nicolau’s presentations tomorrow (A2.4.1 and A2.4.3)

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Floor Control Module Tower Base DSP OM 1 OM 2 OM 3 OM 4 Slow Control FPGA STM-1 Interface PCI Bus Power Conditioning Sinchronous Serial (SPI) STM-1 Protocol (optic fibre) 155 Mbps STM-1 Interface Control Circuits Indipendent Bidirectional Communication between DSP and STM-1 Interface through TOH channels (E1, E2, F1, DCC) PCI Bandwidth: 120 MBps, enough to allow real-time transmission to Host of STM-1 protocol data Proprietary Protocol (Electric) Rx: Mbps Tx: 432 kbps clock TBTI Overhead Full description of the NEMO SDH transport in Fabrizio Ameli’s presentation later (A1.4.9) E/O/E interface (Finisar FTR-1631) SDH mapper (Transwitch Fast-3N)

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 STM-1 Payload

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October bytes 9 bytes 261 bytes 9 rows SDH STM-1 data frame

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Tower # 1 Floor # 1 Floor # 16 Tower # 1 Floor # 1 Floor # 16 ShoreTower from tower to shore from shore to tower (DWDM) DATA TRANSPORT in NEMO 1/16 DWDM DEMUX 1/16 DWDM MUX 1/16 DWDM MUX 1/16 DWDM DEMUX One colour per floor (50 GHz spacing)

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October The signals from the Optical Modules are continuously sampled at 200 MHz (by means of two ‘staggered’ ADC’s) 2. When a threshold value (remotely programmable through slow control) is met, the over-threshold samples, plus a fixed number of pre-trigger samples, are stored in a FIFO for transmission to shore 3.The readout at the trigger time of a 16-bit 100 MHz counter is stored together with the sampled signals Time measurements in NEMO 1.The clock signal is recovered offshore (in each Floor Control Module) from the SDH frames received from the onshore station 2.The SDH mapper inside the FCM recovers a low-jitter MHz clock (also used to clock out the ‘payload’ data received in the SDH data frames) 3.A MHz clock is delivered from the FCM to the Optical Modules 4.This MHz clock is fed to a PLL to give rise to the 100 MHz clock used for all front-end operations Synchronization in NEMO

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Two different problems: Compare the time measured in the apparatus with UTC time (“absolute” timing calibration) Determine the offsets in local time measurements (“relative” timing calibration), i.e. the propagation time of commands and clock signals from onshore to offshore Timing calibration in NEMO Same problem for all neutrino telescopes Same problem for all neutrino telescopes if the digitization and time measurements are performed offshore

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Optical Module (& FE electronics) Floor Control Module Tower JB Time calibration in NEMO (the approach) I. SDH “echo” calibration III. Shore station: It will be equipped for the SDH “echo” time measurements and with GPS II. Optical calibration Secondary JB

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 The FCM interface to the timing calibration system Tower Base DSP OM 1 OM 2 OM 3 OM 4 Slow Control FPGA STM-1 Interface PCI Bus Power Conditioning clock TBTI Overhead The FPGA will sinchronously: Deliver the reset signal to the time counters in the optical modules Deliver an echo signal to the shore station Activate the optical calibration system in response to a shore command

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Optical beacons are ineffective for km 3 -scale detectors! Distance of a PMT from the optical source Number of photoelectrons

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Optical calibration system (+ time stamp) FCM electronics interface splitter Optical source Optical fibre FCM (Floor Control Module) Attenuator Photodiode Optical Module diffuser

M. Circella and the NEMO Coll., Timing Calibration in NEMO VLV T workshop, Amsterdam, October 2003 Timing calibration in NEMO: conclusions and perspectives  The relative timing calibration will be performed by means of a SDH “echo” measurement and an optical calibration system  Interface with the data trasport system under definition  Different choices under study for the optical calibration system