LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16, 20141.

Slides:



Advertisements
Similar presentations
Stochastic cooling and 56 MHz SRF update for Run-14 W. Fischer 21 January 2014.
Advertisements

Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Injector RF Design Review November 3, 2004 John Schmerge, SLAC LCLS RF Gun Thermal Analysis John Schmerge, SLAC November 3,
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
Coupler without copper coating S. Kazakov 11/13/2013.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
ESS cavities interfaces
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
Nikolay SolyakILC-GDE, Beijing, Feb.4-8, Fermilab 3 rd Harmonic Cryomodule Status N.Solyak, H. Edwards, D.Mitchell, M.Foley, T.Khabiboulline, E.Harms,
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
LCLS-II Couplers and Related R&D Chris Adolphsen WWFPC, CERN June 23, 2015.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Status of the TTF-3 RF Power Coupler Activity Andrei Lunin, Ken Premo, Tug Arkan Feb
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
RF Modeling of the LHC Crab Cavity Zenghai Li SLAC Zenghai Li LARP CM20 April 8-10, 2013.
3.9 GHz cavity and CM design Nikolay Solyak (from behalf of LCLS-II design team) Acc Physics meeting, Feb.03, 2016 Speaker:
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Cavity/CM Considerations for CW Operation Cryogenic loads and cryogen distribution End Group cooling: HOM antenna redesign HOM loads and suppression requirement.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
WP5 Elliptical cavities
XFEL beamline loads and HOM coupler for CW
T5.2: Harmonization - Material and Component Reference
Power Couplers, HOM Couplers and Tuners for the XFEL
FNAL recent coupler troubles
Power coupler at DESY & for XFEL
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Physics design on Injector-1 RFQ
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
World Wide Fundamental Power Coupler meeting #3
SNS Fundamental Power Coupler History
Wolfgang Anders, BESSY, Berlin
Modified TTF3 Coupler Design and Related R&D for LCLS-II
V. Veshcherevich Cornell University
CW Operation of XFEL Modules
Main Coupler R&D at DESY
Review of the European XFEL Linac System
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Status of HOMS Spectra Measurements in 1.3 GHz Cavities for LCLS-II
System tests at CEA O. Piquet 19/03/2019
V. Veshcherevich Cornell University
ERL Director’s Review Main Linac
Cryomodule Design for CW Operation 3.9 GHz considerations
Presentation transcript:

LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16, 20141

ItemSpecComment DesignEuXFEL Coupler2009 Drawing Package with exceptions noted below Max Input Power7 kW CWAssume would run with full reflection Minimum Qext Foreseen1e7Allows 16 MV/m with no beam and 6.6 kW input, and allows 6 MW beams with 33 kW input Maximum Qext Foreseen5e7Match for 0.3 mA beams at 16 MV/m, 26 Hz BW Reduction in Antenna Length8.5 mmMaintain 3 mm rounding Range of Antenna Travel+/- 7.5 mmRange measured Predicted Qext Min Range Qext Max Range 3.6e6 – 4.7e6 – 7.5e6 1.0e8 – 1.1e8 – 1.5e8 Assuming +/- 5 mm transverse offsets Warm Section Outer Cond Plating10 um +/- 5 um, RRR = 30-80Nominal EuXFEL Warm Section Inner Cond Plating100 um +/- 10 um, RRR = 30-80Modified – Temp Rise < 150 degC for 14 kW Cold Section Outer Cond Plating10 um +/- 5 um, RRR = 30-80Nominal EuXFEL Center Conductor HV BiasOptionalUse flex copper rings that can be replaced with existing capacitor rings if HV bias needed Warm and Cold e-Probe ports reqNoDo not expect multipacting at low power Warm Light Port RequiredNoDo not expect arcs at low power Motorized AntennaYes – max step = 50 umChanges Qext by 1% RF Processing7 kW CW with full reflection – vary reflected phase by 180 deg For initial couplers, use pulse power processing at SLAC LCLS-II Coupler Technical Specs Preliminary AWLC2014, FNAL, May 12-16, 20142

Fundamental Power Coupler (FPC) XFEL (modified TTF3) coupler is not meet LCLS-II requirements – Tuning range (1.e6-1.e7) not cover required Q ext =4.e7 – Overheating of the internal bellow in warm section at 7kW CW power at full reflection (effective power ~14kW) Two modifications were proposed to address these problems (R&D program: Four coupler modification test ) – Cut antenna 8.5mm to increase Q ext – Increase copper plating of internal inner conductor of warm section from 30 μm to μm to eliminate overheating TTF-3 design AWLC2014, FNAL, May 12-16, 20143

Inner conductor: Temperature distribution for different thickness of copper coating and different RRR (15kW, TW-regime) Copper plating at inner part is 100 microns Data is simulated for RRR=10 Conclusion: TTF3 Coupler need to be modified for LCLS-II μm Cu plating inner conductor in warm section of coupler is possible solution. T max limit AWLC2014, FNAL, May 12-16, 20144

5 Q ext ~ 2.4·10 7 Antenna tip cut by 8.5 mm Q min Q nom Q max Original coupler · ·10 7 Tip cut by 7 mm 3.8· · ·10 7 Tip cut by 8.5mm 5.0· · ·10 7 R3 A. Lunin, 12/13/13 Nominal positions R3 Original XFEL antenna Q ext ~ 4.0·10 6 LCLS-II Cavity Q ext Computation LCLS-II specs Q ext – range for ±7.5mm antenna tuning AWLC2014, FNAL, May 12-16, 2014

Conclusion For LCLS-II coupler the most sensitive parameter is a horizontal antenna shift/tilt. ± 5 mm shift change Q ext by -5%/+50%. Vertical tolerances are relaxed. Vert. antenna tilt (up and down) Horiz. antenna tilt along cavity axis Q min Q nom Q max Original coupler0.7·10 5 ( ) · ·10 7 Tip cut by 8.5 mm5.5·10 6 ( )*· ·10 8 XFEL LCLS-II XFEL Q ext sensitivity to antenna displacements (ILC vs. LCLS-II) A.Lunin Horizontal Vertical Horizontal AWLC2014, FNAL, May 12-16, 20146

TWTW power 2K, W4K, W80K, W T max  K TTF-III as is7kW Helium, 1atm7kW LCLS2 (100µm)7kW LCLS2; 100/200µm15kW /30425/356 Power Losses and max. Temp I.Gonin (FNAL) TTF-3 Coupler: Inner coating 30µm, outer coating 10µm. Helium, P=1atm Window force 160N Ivan Gonin, FNAL AWLC2014, FNAL, May 12-16, Helium cooling of the warm section 7kW TW TTF3 original coupler 7kW TW

Full reflection: E-field distribution in LCLS-II coupler, Q=4e7, P in =7kW AWLC2014, FNAL, May 12-16, 20148

L=0 LCLS-II Coupler. Inner coating 100µm. Outer coating 10µm Maximum Temperature vs. L On resonance Tmax ~425K Temperature distribution along surface of inner conductor for TW and SW ( L=0mm & L=65mm ) PEC BC L On resonance Off resonance Coupler operation at 7kW CW at full reflection AWLC2014, FNAL, May 12-16, 20149

10 Coupler test in HTS -1 Operational for ~5 yrs (~2 cavity/month throughput) – 1.3 GHz and 3.9 GHz cavities, ~1.5 ms and 9ms RF pulses – Now HTS upgraded for CW operation (commissioning) – Priorities in FY14 (CW regime) HOM feedthu’s (XFEL and JLAB designs) 3 tests of high-Q0 dressed cavity (1 dressed to ILC helium vessel and 2 dressed to LCLS-II vessel) 2 modified at SLAC Power Couplers Integrated test of dressed cavity with Slow/Fast tuners, Frequency control and μ-phonics AWLC2014, FNAL, May 12-16, 2014

Active Magnetic shielding AWLC2014, FNAL, May 12-16, mGs mGs Inside 1-layer magnetic shielding Max magnitude < 45mGs Inside 1-layer magnetic shielding after active correction by coils Max magnitude < 6mG

HTS test preliminary schedule Test# and goals Start 2014 Cav. type Helium Vessel HOM antenna Couple (cold) Coupler (warm) Magn shield TunerRF 1:HTS commissioning, HOM feedthru, μ-phon nowRI26ILCXFELvariableNone1L+coilBlade50W 2: High Q0 cavity #1June 15AES11ILCnonvariableNone1L+coilNone50W 3: FPC cold modif, μ-phonics study July 1 RI26 or AES11 ILCXFEL FPC modif FPC He cooled 1L+coilbladeIOT 4: FPC modified; μ-phonics study July 25 RI26 or AES11 ILCJLAB FPC modif FPC#1 modif 1L+coilbladeIOT 5: High-Q cav. #2 FPC#1 Aug 20HQ#2LCLS-IIXFEL FPC modif FPC#1 modif 1L+coil No tuner IOT 6:High-Q#3 integrated FPC#2 Sept.20HQ#3LCLS-IIJLAB FPC modif FPC#2 modif 2-layer Lever tuner IOT 7: high-Q#2 integrated Tuner reliability Oct.15HQ#2LCLS-IIXFEL FPC modif FPC#1 modif 2-layer lever tuner IOT Assumptions about readiness: 2 modified “cold” parts of FPC: April (done) 2 modified “warm” parts of FPC: June 4 LCLS-II type of Helium Vessels: end of July JLAB feedthru: end of June New lever tuner and 2-layer shielding: Sept. AWLC2014, FNAL, May 12-16,

Conclusion XFEL coupler not meet LCLS-II specifications. Problems: Q ext range and overheating 2 major modification was proposed: shorter antenna (by 8.5mm) and thicker (>100μm) Cu plating of inner conductor in warm section to address these problems: Modifications are in progress at SLAC (cold part modification was done, warm sections of couplers will be ready by the end of June 2014, plated at CPI and processed at SLAC). HTS tests is essential part of design verification program for LCLS-II. – 3 high Q0 (N2 doped) integrated tests, (HOM feedtru’s, FPC, Helium vessel, Tuner, magnetic shielding) – two modified FPC assembled on high-Qo cavity. Next step: start FPC procurement after HTS tests. – Documentations and review. AWLC2014, FNAL, May 12-16,