Antenna Adjustment SPL Cold Test. Measurement Setup Q ext for input and pick-up antenna determined by S 21 using a critical coupled reference antenna.

Slides:



Advertisements
Similar presentations
© 2010 UNIVERSITÄT ROSTOCK | FAKULTÄT INFORMATIK UND ELEKTROTECHNIK HOM coupler modelling for SPL H.-W. Glock Universität Rostock - Institut.
Advertisements

TDI observations winter break 2012 Thanks to F. Loprete, E. Page, B. Henrist, B. Salvant.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
324MHz FETS RFQ RF measurement and components By Aaron Cheng 18 December 2006.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
ESS cavities interfaces
© 2010 UNIVERSITÄT ROSTOCK | FAKULTÄT INFORMATIK UND ELEKTROTECHNIK Q ext estimations for the "Broad-Hook"-HOM coupler H.-W. Glock Universität.
1 Trigonometry Basic Calculations of Angles and Sides of Right Triangles.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
SPL Seminar 2012 BE-RF-LRF HOM couplers for SPL cavities Kai Papke 1 Comparison of different design approaches.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
FNAL Visit to Century Metal Spinning Current P.O. for: 2 - Titanium Helium Vessel Tubes (20” I.D. x 3/16” Wall x 14.5” Long) MHz β=0.9 Nb Beam Tubes.
LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16,
TRT active gas leak repairing F. Perez, C. Degeorge, S. Katunin, I. Zhukov, V. Myalkovskiy, S. Konovalov, A. Romaniouk, H. Danielsson, A. Catinaccio, K.
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
L. Xiao, LHC-crab-cavity WebEx meeting, Dec.09, 2008 Baseline Design: Significant coupling of input power to LOM/SOM couplers FPC HOM Update on LHC Crab.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Tuner & LLRF of ILC Sun YI (孙毅)、 Wang Guangwei (王光伟) Lin Haiying (林海英)、 Qiu Feng (邱丰) Dec.7, th workshop of KEK/IHEP on ILC.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
I. Ben-Zvi Update Ilan Ben-Zvi for the Stony Brook, BNL and AES SPL teams Presented by Rama Calaga.
Cavity Measurements By Aaron Cheng 4 May Overview RF measurements Waveguide-coax transition.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Beam tube damping estimations for SPL cavity cont’d W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Diagnostics Tests and Studies for SPL cavities Kitty Liao CERN BE-RF-KS First Open Collaboration Meeting on Superconducting Linacs for High Power Proton.
Simon Calibration Instructions Main Antenna Jig Peter Karlsson V2.
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
1 Planning Change. Painting a Room Select paint 10 days Sand and clean walls 3 days Buy painting supplies 1 day Buy paint 1 day 1 st coat 1 day 2 nd coat.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Plug-compatibility interface for Input Coupler LCWS13-AWG7-SCRF H. Hayano
Update on LHC 800MHz Crab Cavity Conceptual Design Liling Xiao, Zenghai Li Advanced Computations Department, SLAC Presented at LARP-CM12, April 9, 2009.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
Dmitry Gudkov Phase correction of the CLIC TBM in CLEX Dmitry Gudkov Wilfrid Farabolini.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
OUTCOME OF FIRST CAVITY TESTS With help of T. Junginger, N. Schwerg, K. Liao, P. Maesen, M. Gourragne, A. Benoit, O. Brunner SPL Seminar 2012 at CERN 112/07/2012Mathieu.
The reading is 7.38 mm. The reading is 7.72 mm.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Re-entrant BPM R&D for ILC Main Linac
Power Couplers, HOM Couplers and Tuners for the XFEL
FNAL recent coupler troubles
Power coupler at DESY & for XFEL
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Operating SRF systems reliably in a “dirty” accelerator
LHC Crab Cavity Conceptual Design at SLAC
Students will solve two step equations (12-4).
Crab Cavity Manufacturing Readiness Meeting
RF-Dipole Cavity Update
BMXP Operation Memo Taper Cutting --Laid abnormity.
World Wide Fundamental Power Coupler meeting #3
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
Let’s say we have a town of 10,000 people electing a mayor using the Plurality with Elimination Voting Method. There are 4 candidates, candidate A, candidate.
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Test RF gun cavity Takuya Natsui.
Изразеното в настоящата презентация мнение обвързва единствено автора и не представлява официално становище на Комисията за финансов надзор Данил Джоргов.
Alignment of Main Linac Cryomodule (MLC)
Date, location 1.
V. Veshcherevich Cornell University
Presentation transcript:

Antenna Adjustment SPL Cold Test

Measurement Setup Q ext for input and pick-up antenna determined by S 21 using a critical coupled reference antenna on the respectively opposite side of the cavity Reference Antenna (  critical coupled) Pick-Up Antenna S 21 -> Q ext,Pick-Up Measurement setup for Pick-Up antenna Pick-Up Input

1 st Antenna Adjustment 05/2014 Antennas that we let produce 76 mm 72 mm Different Flange Karim, Kai

Verification test 02/07/2014 Input antenna Q ext = 1.9E9 Pick-Up antenna: Q ext = 8E8 Discrepancy due to wrong estimated offset and big variety in connectors and flanges: Input Pick-Up Coax Connectors Pick-Up Waqas, Kai

2 nd Antenna Adjustment 2-4/07/2014 With final flanges and coaxial connectors: L = 20 mm Qext = 5.8E9 L = 58 mm Qext = 4E11 L = 72 mm Qext = 5.7E9 Progress … Tobias, Karim, Kai

Summary At the moment available copper antennas: – 2x 72 mm -> input antenna – 2x 76 mm Flanges ready for Nb coating at the end of this week Pick-Up with 72 mm copper antenna (combined flange) need to be cut to: 20 mm input antenna (flat flange) 58 mm pick-up antenna Favourites for the cold test Thanks to Elise, Tobias, Karim, Nuria, Waqas, Szabina, …