Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

Open Access Pune Power Development Pvt. Ltd.. Contents:  Terminology  Open Access  Requirements for Open Access  Provisions made in Electricity Act.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
O POWER TRADING o OPEN ACCESS o CAPTIVE GENERATION BHANU BHUSHAN Director (Operations ) Power Grid Corporation of India Ltd.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Analysis of ARR & Tariff Proposal of SLDC Consumer Counsel.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Presentation on Preparation of Bank Reconciliation Statement by Chief Consultant, TSG and Finance Controller, SSA Assam.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Billing, Collection and Disbursement Procedures
Release of funds The FC Award for each year releases directly to the Finance Department of the respective States. The Finance Department in turn transfers.
RTGS/NEFT Fund remittance facilities. RTGS(Real Time Gross Settlement) The acronym 'RTGS' stands for Real Time Gross Settlement RTGS system is a funds.
Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.
Outline  Chronology  Conceptual framework  Salient Features of REC Mechanism  Role of Central Agency  REC Procedures  Current Status.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Sanjay Garg General Manager PGCIL/ Ministry of Power
23 rd Commercial sub-committee meeting on
CERC (Power System Development Fund) Regulations 2010.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
WELCOME TO CIGRE MEMBERS
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during
Review of the Progress of Submission of Audit Reports for the year st Quarterly Review Meeting of Finance Controllers on 29 th May 2014 &
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
Renewable Regulatory Fund (RRF):- Implementation Mechanism
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
POWER GRID CORPORATION OF INDIA LTD
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
Agency Charging Statement Overview of Consultation 11 th February 2008.
UI POOL FINANCIAL SETTLEMENT & PAYMENT SECURITY OPTIONS.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Oracle Cash Management Overview. Objectives After completing this lesson, you should be able to do the following: Describe the key features of Oracle.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
Issues related to UI pool. Payment to pool account by KPTCL and Pondy Till June 2010 payment to UI pool by KPTCL and Pondy was through cheque/DD. Pondy.
Extract from Annexure-1 on ‘Complementary Commercial Mechanisms of Indian Electricity Grid Code ’12(a) Weekly bills shall be issued to the constituents.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Commercial Issues for 73 nd OCC TN opened LC for Rs.5Crs for UI payment delays during TN to enhance the LC amount to 32.84Crs as per their liability.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Review of Audit Reports Financial Year th Quarterly Review Meeting of Finance Controllers, New Delhi.
Southern Regional Power Committee Central Electricity Authority.
Transition Plan Network Operations Model Change Requests 5/26/2010.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
19 TH Commercial sub-committee meeting UI &REC reconciliation STOA reconciliation LC statusSEM Outstanding UI/Rec Others POC RRF.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
Presentation on RTGS system presented by- Arun awasthi Jaiprakash Keshab.
Scheduling of Collective Transactions Through Power Exchange
IN INTER-STATE TRANSMISSION
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Presentation transcript:

Commercial Points for 93 rd OCC meeting

Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation Corporation Ltd -SRPC Deviation Pool Fund Account. Name of Bank : AXIS Bank Name of Brach: Majestic Branch, Bangalore Account Number: IFSC code RTGS code:

Tamil Nadu TN opened LC for Rs.8.49Cr only in lieu of Rs.32.84Cr LKPPL Rs.2.44 Lakhs Due to delay of wk40( ) UI payment OPENING OF LC DUE TO DELAYED UI PAYMENT

Number of Instances of delay in Weekly SEM data receipt at SRLDC during February 2014 ANDRA PRADESHKARNATAKAKERALA Guttur1Manjeswaram1 KTPS(Kothagudam)1Nelamangala1 POWERGRID Gajwel1Alipura1Gajuwaka1 Tandur1Kadra2Pugulur 1 TAMILNADU Kodasally2Sriperumbudur 1 Gumminipondy1 PONDY Salem1 Arni1YanamVijayawada1 Udumalpet1 GOA Kalivanthapattu1 Xeldam1

Time Drift Statement Not Received from the following stations during February 14 ANDRA PRADESH KARNATAKATN GajwelAmbewadiKonajeArni RagulapaduAlipuraSedamAcharapakkam PrathapnagarGutturYerandahallyTheni KTPP (Bhoopalapally) HoodyKadraNCTPS ChitoorKadakolaKodasallySP Koil DitchipallyHoodyBtpsThiruvalam KurnoolSV Chathram MehaboobnagarGOAS R Pusur VemagiriXeldamPondaTTPS Sulurpet

Time Drift Statement Not Received from the following stations during February 14 ISGSPOWERGRIDIPPS SR- 1SR -2 SimhadriCudappaPondicheryMepl VallurGootyArasurSepl BhavniHyderabadHosur MapsMunirabadPugulur RamagundamNelloreTirunalveli Nellore PSKalivanthapattu 765kV RaichurMunirabad Vijayawada

Validation Committee meeting scheduled on DICs may participate from NLDC or SRLDC through Vedio Conferencing. PoC Data for Q1 of (April 14-June14)

All the DICs has to furnish (1) the technical details of new transmission elements, generating units which are expected to commence commercial operation from April 14-June14 (2) Yearly Transmission charges (3) node wise MW/MVAR and (4) forecast generation and demand data Henceforth all DICs are requested furnish the full data required for computations at least by two quarters in advance without waiting for reminders from NLDC.

Status of Data for Q DICNetworkNode-wise MW/MVAr Injection /Drawls Load- Generation data AP √ -- KPTCL--√ TN √√√ KSEB--- Pondy---

Forecasting & Scheduling of Wind and Solar As per CERC order dt in Petition No. 356/SM/2013: the commercial mechanism shall remain suspended till further orders. the forecasting and scheduling of wind generation shall continue as per the provisions of the Grid Code and RRF procedure approved vide our order dated All SLDCs are requested to comply.

RRF Schedule data details AP sent the RRF Schedule data for following periods : to to to to