17 February 2003 - All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February 10-16 Dedicated some.

Slides:



Advertisements
Similar presentations
L2 Online Reinhard Schwienhorst DAQ shifters meeting, 03/12/02.
Advertisements

CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
FPCP 2002, 05/16-18/2002 p. 1 Richard E. Hughes, The Ohio State UniversityCDF Run II Status Status of CDF and Prospects Flavor Physics and CP Violation.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
Arnd Meyer (RWTH Aachen) Feb 25, 2004Page 1 Status of Data Taking Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting February 25 th, 2004.
Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 1 Data Taking Status and Plans Achievements Concerns Plans Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting October.
7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 DØ Summary - Week of 2002 September 30 – October 6 Luminosity & operating.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
EPS 2003, July 19, 2003David Buchholz, Northwestern University Performance of the D0 Experiment in Run II Detector Commissioning and Performance Accelerator,
BEACH Conference 2006 Leah Welty Indiana University BEACH /7/06.
NIPHAD June 27, 2001 Freya Blekman, NIKHEF Amsterdam 1 NIPHAD meeting June 27,2001 Freya Blekman D0 S ilicon C alibration and R eadout M anagement.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Experience with medium-size SRS for muon tomography Michael Staib Florida Institute of Technology.
12 February 2002 Cal Mtg - D0 Collaboration Alan L. Stone Louisiana Tech University ICD LED Run Status Purpose ADC to GeV Conversion Basics of ICD LED.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Technical Part Laura Sartori. - System Overview - Hardware Configuration : description of the main tasks - L2 Decision CPU: algorithm timing analysis.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
22 June 2000 D  NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
May 12, 2009Włodek Guryn1 Physic Program with Tagged Forward Protons at STAR Single Diffraction Dissociation (inclusive SDD cross section, leading  0.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
Reflections of a System Run Coordinator Or Equivalent! Bruce M Barnett STFC, Rutherford Appleton Laboratory L1Calo Collaboration Meeting January.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
News on GEM Readout with the SRS, DATE & AMORE
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
First CMS Results with LHC Beam
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Dmitri Denisov D0 Weekly Summary: May 4th to May 11th  Delivered Luminosity and operating efficiency u Delivered 7.3pb -1 u Recorded 6.3pb -1 (86%) 
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
Arnd Meyer (RWTH Aachen) Dec 15, 2003Page 1 D0 Status Summary ● Have been in supervised access all week, until Sunday evening ● Intermittent trips (low.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Beate Heinemann University of Liverpool For the CDF collaboration EPS 2003, Aachen, Physics Beyond the Standard Model with Photonic Final.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E hrs 2821Sat 1:513.8E31.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Kevin Burkett Harvard University June 12, 2001
The Silicon Track Trigger (STT) at DØ
SLB Synchronization in H4 Beam (LIP - Lisbon)
Mini Tower Preliminary Results
Installation, Commissioning and Startup of ATLAS & CMS Experiments
Presentation transcript:

17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some luminosity to studies –Test of New Muon PDT Code Introduced new hardware and firmware during shutdown Verify that readout, rejection and integrity are fine Preliminary results show no new problems – L2 Muon Efficiency Introduced new L2 Muon code and look-up tables Checked that the rejection & readout were as expected Physics: Recorded Lumi of 2.2 pb -1 or 80.8% of Delivered Lumi  Recorded 7.2 million Physics Quality Events Full Detector Readout

17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University2 Delivered Luminosity Losses 0.4 hrs: 14:55 Wed Feb 13 th – Muon Readout Crate Our online monitoring was not up to pre-shutdown quality…yet! 1.0 hrs: Sat Feb 15 th – CFT+PS Readout Crates Happened twice mid-store Problem resolved by power cycling readout crates. We took two inefficient runs during these periods. 0.5 hrs: Sun Feb 16 th – SMT Readout Crate –Required expert help to disable a problematic HDI ~0.5 hr: 25 Run transitions (~1 minute/per) ~1.0 hr: 13 Begin or End Store transitions (~5 minutes/per) ~2-3 hrs: Average 4-6% FEB during physics data taking –This has increased since pre-shutdown. We are working on understanding how we can reduce the transfer times between the SVXII & the VRBs – the main source of L1 FEB in the Silicon, Tracker & Preshower readout crates. Major Sources of Downtime: Not recording during a store (>0.25 hrs) Other Losses

17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University3 Data Taking Stability Rec/Del Lumi = 96.7% ~5% FEB Store k triggered events 3.5 hours Avg 44.4 Hz to tape Rec Lumi = 135 pb -1 Zero pauses –Peak rates over stores 2213, 2229, 2231, 2232, 2234: L1 ~ 0.9 kHz L2 ~ 0.45 kHz L3 ~ 60 Hz –Running at ~90% efficiency for most runs 93.8% Eff.

17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University4 Store 2232 Sun Feb 16 th from 06:53

17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University5 Controlled Accesses & Luminosity Drip Detector Trips in PC16 –Frequent trips on Feb 10th & 11th were due to a short. Metal prongs on back of detector strip were making contact with rack frame through vibrations Isolated strip & rack No water was found Central Muon Scintillator Front-End Readout Crate –Replaced blown fuse Debugging & Commissioning –CFT+PS, L1 Muon, L1 CTT & FPD D0 Luminosity –Detector configuration is the same as pre-shutdown. No electronics, HV or cables were changed –Channel by channel checks on scope revealed no problems –Will perform check on D0 jet cross sections 07:00 12 Feb – 5 hrs Replaced L1 Muon trigger card Power cycled supply to a Front-End Scintillator crate 21:30 13 Feb – 0.5 hrs

17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University6 Other D0 News Halo rate anomalies –Feb 13 th : One glitch at 10:00 & two around 13:30 (five minutes apart) in pbar halo which tripped some Muon MDT HV channels DCA (cm) vs phi (rad) Beam position stable –Within 0.5 mm from center

17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University7 Plans for Upcoming Week New Trigger List: v10.20 –Remove min bias on muon scintillator trigger Excellent rejection at L2/L3 to remove cosmics –New triggers with L3 Muon filtering –Extend L1 CAL trigger from 2.4 to 3.2 in eta No known major problems –A few minor jobs pending access opportunity Tracking Trigger & FPD Commissioning Noisy Calorimeter tower due to SCA daughter card Will continue to do post-shutdown system checkouts to validate trigger & data integrity