1 Center Plan for LaRC Software Process Improvement FY14 Center Plan for LaRC SPII R1V0.ppt.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

(Individuals with Disabilities Education Improvement Act) and
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
National Aeronautics Space Administration SDOHM Meeting Collaboration Cafe Update- Top Six Ideas Gerry Schumann March, 2013.
Page 2 Agenda Page 3 History –Blue Print, 2000 –GIS Process 1.2, 2001 (training only) –GIS Process 2.0, (ITIL based - not implemented) –Supply/Demand.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Contractor Assurance System AC Overview October 13, 2009.
Quality Improvement/ Quality Assurance Amelia Broussard, PhD, RN, MPH Christopher Gibbs, JD, MPH.
How to Document A Business Management System
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
ASPEC Internal Auditor Training Version
Grants Business Process Re-Engineering (BPR) Overview
Trini Torres-Carrion. AGENDA Overview of ED 524B Resources Q&A.
Quality Representative Training Version
1 Susan Weigert, Project Officer GSEGs Overview of GSEG Management.
Grants.gov – What to Expect Presented by the Office for Research Cindy Hope, Director Office for Sponsored Programs.
Core Performance Measures FY 2005
Langley Research Center National Aeronautics and Space Administration Software Engineering Improvement.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Foundation Financial Services Post Award Nancy Gomez Post Award Analyst.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Server Virtualization: Navy Network Operations Centers
OHT 25.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The quality assurance organizational framework Top management’s quality.
Langley Research Center FY 2002 Safety and Health Managers’ Meeting.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Roles and Responsibilities
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
 Sana Riaz  Registration No  Saira Khalid  Registration No
Page 1 April 1, 2003 Langley Research Center Contractor Forum_040103_Final.ppt LaRC Core Financial Project Contractor Forum Yvonne Dellapenta LaRC Core.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
BACKNEXT Georgia State University --- Expenditure Review Executive Summary -- Online Training Online Training for Georgia State University Expenditure.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
Georgia Institute of Technology CS 4320 Fall 2003.
Air Education and Training Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Replenishing the Combat Capability of America’s Air Force WIDE.
Geoffrey L. Beausoleil Assistant Manager, Office of Operational Support DOE Idaho Operations Office September 12, 2006 Presentation to DOE ISM Champions.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
State of Florida Emergency Support Function 6 1 EMERGENCY SUPPORT FUNCTION 6 - MASS CARE & EMERGENCY ASSISTANCE “Training for incoming EMAC personnel”
National PTA Standards of Affiliation (an SOA required training)
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Science Team Objectives K. Jezek and J. Richter-Menge Science Team Co-leads.
Technical Standards NPR Presented to Technical Standards Working Group June 11, 2007.
1 NASA WBS TASK #: QUARTERLY TECHNICAL PROGRESS REVIEW TASK # & TITLE:06-0xxxx Assessment of Electronic Widgets - Radiation QUARTER:XQ FY06.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
Presented By WVDE Title I Staff June 10, Fiscal Issues Maintain an updated inventory list, including the following information: description of.
Howard P. Lowell Deputy Assistant Archivist for Records Services, Washington DC August 31, 2004 NARA Updates – RACO 2004.
OMB Status 09/30/04 Monday, November 15, 2004 OMB Progress 09/30/04 Vicki Novak Tom Luedtke Gwen SykesPat DunningtonSteve Isakowitz Best in Government!
Defining roles on the Regional Leadership Team Position-by-Position.
Implementing Program Management Standards at Duke Energy.
2016 NSF Large Facilities Workshop New Initiatives Business Roundtable II-III May 25-26, 2016 Jeff Lupis, Division Director, Division of Acquisition and.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
Communities of Practice & L ESSONS L EARNED Budget, Finance, and Award Management Large Facilities Office May 2016 Large Facilities Workshop 2016 S. Dillon.
Leading Your District To Be All That It Can Be David Williams, Deputy Director Div. of Soil & Water Conservation 2016 Spring Area Meetings.
Project Delivery Working Group FY2016 EFCOG Annual Meeting Robert P. Miklos Idaho National Laboratory Battelle Energy Alliance Working Group Chair June.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Field Office Training 1 U.S. Department of Housing & Urban Development CFFP Overview Field Office Conference Call March, 2008 Todd Wendorf Office of Capital.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
1 Integration of Process Initiatives And Assessments Common Process Framework Integration of Management System Standards and Initiatives (QMS/CMMI/Lean/PMBP)
Welcome to the Green.Arkansas.gov Question & Answer Session
Anna Preston Vance, HA of Paris
Working with your AoA Project Officer
Implementation Strategy July 2002
Phase 1 Tollgate Review Discussion Template
Independent Expert Program Review (IEPR)
Presentation transcript:

1 Center Plan for LaRC Software Process Improvement FY14 Center Plan for LaRC SPII R1V0.ppt

2 Plan Goals The goals of the Center Plan for LaRC Software Process Improvement are to improve the quality, safety, and reliability of software developed for or by LaRC, to increase the productivity of the developers, and to increase customer satisfaction with LaRC software products. This will be accomplished by implementing planned Software Process Improvement (SPI) activities to continually advance LaRC software engineering capabilities.

3 Scope and Tactic for Phasing in SPI Scope This Plan addresses Software Process Improvement (SPI) activities for LaRC organizations with SW management, development, acquisition, assurance, and maintenance. The following slide shows the LaRC organizations with SW management, development, acquisition, assurance, or maintenance. This Plan is being used by the Software Engineering Process Group (SEPG) at LaRC, to direct SPI activities. Tactic for Phasing in SPI The Primary Focus of the SPI activities at this time is to bring for the LaRC organizations containing software developers, maintainers, managers, acquirers, and quality engineers into full compliance with LPR LaRC Software Engineering Requirements and its supporting Software LMS Center Procedures. In the past, the Center has introduce CMMI in phases, beginning with an initially selected organization. On and as requested basis, support for CMMI improvements have been performed. The organizations are assessed against the CMMI to determine their current baseline. Deficiencies are identified, best practices are documented and refined, and improvement activities are performed to eliminate identified deficiencies. When the best practices have been shown to be successfully repeated across multiple projects and all identified deficiencies for the applicable CMMI process areas have been eliminated, an assessment can be performed by an authorized lead appraiser to obtain a CMMI rating.

4 Equal Opportunity Janet E Sellars Human Capital Management Leah M Meisel Strategic Communications & Education (acting) Richard R Antcliff Chief Financial Officer Kenneth J Winter Chief Information Officer Cathy H Mangum Mission Support Safety & Mission Assurance Systems Management Preston Carraway ProcurementChief Counsel Michael Nick Madrid Advanced Planning and Partnership Richard R Antcliff Research ServicesEngineering Research Center Operations Mission Aeronautics Research Vicki K Crisp Science Lelia B Vann Exploration and Space Operations David E Bowles Flight Projects Luat T Nguyen Systems Analysis and Concepts Ajay Kumar LaRC Organizations Benefiting from SPI – ORGs need updating Independent Program Office Mark P Saunders NASA Engineering & Safety Center Ralph R Roe Jr Agency Functions Director's Office Director Lesa B Roe Deputy Director Stephen G Jurczyk Associate Director Cynthia C Lee Agency Programs Science Support Office Raleigh B Perry Jr Exploration Technology Dev. Program Office Frank Peri Jr Earth Systems Science Pathfinder Program Office Edward Grigsby No pre-assessment to date Pre-assessed, expired assessment, or quick look Achieved CMMI Rating † Primary organizations benefiting from past Requirements and Acquisition improvements ‡ Organizations containing Class A, B, or C software CMMI Compliance ††‡†† †† † Orgs with substantial SW management, development, acquisition, assurance, or maintenance E3 E4 D1 D2 D3 D4 C2 B1

5 Ownership of the Plan The activities documented in this Plan are managed and monitored by the SEPG, under the direction of the Chief Engineers Board in accordance with their charters (see Langley Policy Directive ). The NASA Software Engineering Initiative Implementation Plan requires the naming of a “software champion” for the Center, and the Chair of the SEPG is hereby so designated. The Chief Engineers Board is responsible for providing Plan direction and for supporting its implementation.

6 Schedule The Work Breakdown Structure (WBS) and schedule for the Center Plan for LaRC Software Process Improvement is maintained as a separate document by the SEPG –It contains the strategies (the high level WBS elements) and objectives (lower level WBS elements) for, at a minimum, the current fiscal year –It also contains WBS elements for supporting the NASA Software Engineering Initiative –Updates to the Schedule are usually performed in the first quarter of each fiscal year Updates to the WBS and schedule are done in conjunction with Headquarters/Office of Chief Engineer’s (HQ/OCE) direction The Center Plan updates are reviewed by HQ/OCE and requested modifications are made by the SEPG After modifications are complete, the WBS, schedule, and funding allocation spreadsheet are submitted to HQ/OCE for approval On an as needed basis, detailed schedules of events for individual SPI efforts are developed and maintained separately by the SEPG; status on these schedules is briefed to the Chief Engineers Board and related management A one page summary of the detailed schedule is in the following slide

7 SEPG Summary Schedule (FY14-16) The Primary Focus of the SPI activities at this time is to bring for the LaRC organizations containing software developers, maintainers, managers, acquirers, and quality engineers into full compliance with LPR LaRC Software Engineering Requirements and its supporting Software LMS Center Procedures.

8 Tactic for Monitoring Plan Progress, accomplishments, and status on the plan are briefed by the Chair of the SEPG to Headquarters/Office of Chief Engineer (HQ/OCE) and the Agency/Software Working Group as requested Status on the plan is also briefed by the Chair of the SEPG to the LaRC Chief Engineers Board approximately as requested, at a minimum annually Highlights of major Plan accomplishments (e.g. successful CMMI appraisals, successful Headquarters Audits) are submitted to the HQ/OCE Head of the Software Engineering Initiative to include in the monthly brief to the NASA Chief Engineer

9 LaRC Center Training Plan – Part 1 The SEPG training responsibilities Once notified, through the Software Working Group or NASA Safety Center (NSC), of training class seats available at other NASA Centers: –The class name, vendor, and registration instructions are posted on LaRC SPII home page at ( ) –An article on web site is also posted to give further details The SEPG also encourages the software Branch managers to submit yearly a list of software engineering training needs to both the SEPG call and the LaRC local training office call –Training requests and CMMI assessment needs sent to the SEPG are prioritized, and target dates are proposed; the requests are submitted to the OCE Training Subgroup Chair as part of a yearly OCE call; the OCE then determines what training and assessment requests HQ will fund for each Center Implementation When on site LaRC classes are funded (either by the local training office or by OCE or NSC), the SEPG assists the local training office as needed in setting up the training logistics, classroom preparation, class advertisements, coordinating delivery of training materials, etc. When LaRC CMMI activities (assessments/workshops) are funded by OCE, the organization works directly with the vendor to: develop a schedule of events and participant involvement, schedule rooms, obtain necessary plan signatures, provide briefing materials, etc.; the SEPG chair is invited to the opening and closing briefings as one of the sponsors

10 LaRC Center Training Plan – Part 2 Training Records and Forms Individual student training records and forms are housed in the NASA SATERN system, which is not maintained by the SEPG Yearly training and assessment requests submitted to the OCE are provided using the form and format provided by Training Subgroup Chair each year Records of CMMI assessments are maintained by the organizations Training resource Because of reductions in OCE Center Plan funding and FTEs, the SEPG has no funding of its own to pay for software classes or CMMI activities The SEPG relies on HQ/OCE, the local training office, NSC, and APPEL to fund training courses or CMMI activities Once funded, the SEPG helps coordinate and facilitate the activities Minimum training requirements Minimum training requirements for software personnel are those required by CMMI –Those training requirements are fulfilled by organization/Process Area Owners mentoring and training on an as needed basis (usually in conjunction with CMMI process area specific improvement efforts) –SEPG 1-on-1 mentoring is also provided (as requested) to projects and Branch Heads Training class availabilities are published announcements and on the SPII web site