Feb 6, 20012001 ASME/API Gas-Lift Workshop1 Erosion Testing of Standard Monel Gaslift Valve Seats Informal Presentation by Shauna Noonan, Chevron Petroleum.

Slides:



Advertisements
Similar presentations
Energy Efficient Steam Systems
Advertisements

2001 ASME/API Gas-Lift Workshop
GAS LIFT OPERATION By : Ubet Khoirudin TOTAL E&P INDONESIE.
Feb. 6, ASME/API Gas-Lift Workshop1 Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology Cleon Dunham, Oilfield Automation.
Drilling Engineering – PE311 Circulating System
In this presentation you will:
Simple Pressure Control Valves
Measuring Erodibility of Cohesive Soils By Gregory J. Hanson USDA-ARS Hydraulic Engineering Research Unit.
Presented by: Alex Hageman ( Accelerated Production Services, Inc.) May 15 th, 2013 Multiple Stage Hydraulic Jet Pump Presented to ALRDC.
Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC.
IPO Unloading Valve Technology Developments and The Associated Benefits Alan Brodie, Feb 2011.
HVACR312 - Refrigeration Metering Devices.
Forging new generations of engineers. Fluid Power.
Booster System Basics: Constant Speed Systems
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Float Equipment Specification June API Standardization Conference.
Pressure Drop Basics & Valve Sizing
Basic Hydraulics Irrigation.
Hydronic Mechanical Controls
Week 1 Unit Conversions Mass and Volume Flow Ideal Gas Newtonian Fluids, Reynolds No. Week 2 Pressure Loss in Pipe Flow Pressure Loss Examples Flow Measurement.
ASME/API GAS LIFT WORKSHOP DOWNHOLE GAS LIFT AND THE FACILITY John Martinez Production Associates ASME/API GAS LIFT WORKSHOP.
© Copyright 2005 POSC Production Reporting (draft specifications) Overview.
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
HVAC523 Circulator Pumps.
INTRODUCTION Definition:
By: Gatut Widianoko Weatherford Artificial Lift Systems
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
Gas Lift Design Philosophy for Chevron’s Subsea Developments
Feb. 6, ASME/API Gas-Lift Workshop1 Routine Validation Testing of Every Gas-Lift Valve Informal Presentation by Naiza Abdullah, Brunei Shell Petroleum.
Testing and Information
© Swagelok Company, 2004 CFD-based Liquid Flow Calculations for Modular Sample Systems John J. Wawrowski Swagelok Solon, Ohio IFPAC 2004 Arlington, Virginia.
Gas Lift Redesign in Dual Strings Completion
© ChevronTexaco 2001 Use of Transient Simulators to Assess Gas Lift Viability for Offshore Angola 2002 North American Gas Lift Workshop SHAUNA NOONAN /
Introduction To Fluid Power
Nov. 12, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology.
SURVEILLANCE & OPTIMIZATION PROCESSES ASME/API GAS LIFT WORKSHOP ASME/API Gas Lift Workshop ExxonMobil Production Organization U. S. West Artificial Lift.
Valves In Industry (Part 3)
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
WORKSHOP PRACTICE SAFETY VALVE.
LAFAYETTE, LA NEW ORLEANS, LA HOUSTON, TX.
NUMERICAL MODEL FOR THE PREDICTION OF FLUID PRODUCTION AND GAS CONSUPTION OF GAS CHAMBER PUMPS PDVSA INTEVEP Fall 2001 ASME/API Gas Lift Workshop Aberdeen.
Existing System The system originally operated with everyone having 24-hour availability. The village then created a 3-day rotation which improved the.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 24 – 27, 2014 Gas Well Deliquification Breakout Session Troubleshooting Gas-Lift.
GLO Offshore South East Asia Steve ‘Gas Lift’ Gossell – MEA Senior Gas Lift Engineer.
By Jayant Sadare Gas-Lift Optimization and Diagnosis by using
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
Fluid Power Control.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February , 2015 Gas Well Deliquification Breakout Session Troubleshooting Gas-Lift.
Gas Lift Design Philosophy for Subsea Developments 2001 European Gas Lift Workshop.
Unit Twelve Pilot Operated Pressure Control Valves At first glance the diagram would appear to show three different valves but the box surrounding the.
CENTIFUGAL PUMP OPERATION
IPO GLV Throttling Mechanism with Inherent Reverse Flow Checking
Fluid Statics/Dynamics
Well 38 Drilling & Testing Amendment
Analysis of Heading in Artificially Lifted Wells
2001 ASME/API Gas-Lift Workshop
Spring 2003 ASME/API Gas-Lift Workshop
2003 ASME/API GAS-LIFT WORKSHOP Gas Lift Optimization Process
For more information or to nominate papers, displays, etc., contact:
Shell UK Exploration and Production
TRENTON Casing Filler Presentation
Start Up Procedures and Recommendations for Factory Authorized Equipment Start Up.
2001 ASME/API Gas-Lift Workshop
Gas-Lift Breakout Session Report Out Fall 2003 Gas-Lift Workshop
For more information or to nominate papers, displays, etc., contact:
Gas-Lift Valve Flow Performance
Presentation transcript:

Feb 6, ASME/API Gas-Lift Workshop1 Erosion Testing of Standard Monel Gaslift Valve Seats Informal Presentation by Shauna Noonan, Chevron Petroleum Ken Decker, Decker Technology

Feb 6, ASME/API Gas-Lift Workshop2 Erosion Testing of Standard Monel Seats OutlineOutline –Brief history –Testing Methodology –Testing Program –Summary of Test Results –Conclusions and Consequences –The Way Forward

Feb 6, ASME/API Gas-Lift Workshop3 Erosion Testing of Standard Monel Seats Brief HistoryBrief History –No quantitative test had been performed to determine the erosion rate of standard monel seats in gaslift valves. –API recommends an unloading rate based on experience. –Erosion continues to occur even with admonitions to unload slowly.

Feb 6, ASME/API Gas-Lift Workshop4 Erosion Testing of Standard Monel Seats Brief HistoryBrief History –This Erosion Testing program was conducted as a special project of the VPC. –Participating members were… Chevron Petroleum TechnologyChevron Petroleum Technology Shell International Exploration and ProductionShell International Exploration and Production Weatherford Artificial Lift SystemsWeatherford Artificial Lift Systems

Feb 6, ASME/API Gas-Lift Workshop5 Erosion Testing of Standard Monel Seats Testing MethodologyTesting Methodology –Typical erosion testing measures the rate of loss of material from a sample by carefully measuring the weight of the sample both before and after the test. –In gaslift valves, the loss of material is less important than the rate of gas leakage through the valve. –The rate of erosion was correlated to the amount of leakage through the port when a standard TC ball was placed over the port.

Feb 6, ASME/API Gas-Lift Workshop6 Erosion Testing of Standard Monel Seats Testing MethodologyTesting Methodology –A 1-1/2” orifice valve was chosen as the carrier for the seat. –The seat was leak tested prior to running the erosion test. –The seat leak rate was rechecked after 1 hr, 2 hrs, 4 hrs, and 6 hrs.

Feb 6, ASME/API Gas-Lift Workshop7 Erosion Testing of Standard Monel Seats

Feb 6, ASME/API Gas-Lift Workshop8 Erosion Testing of Standard Monel Seats Testing MethodologyTesting Methodology –The valve was installed in a modified pocket. The pocket was enclosed in a fixture which was plumbed to a triplex pump. –The plumbing allowed control of pressure upstream and downstream of the test fixture. –Fresh water from a rusty holding tank was used as the test media.

Feb 6, ASME/API Gas-Lift Workshop9 Erosion Testing of Standard Monel Seats

Feb 6, ASME/API Gas-Lift Workshop10 Erosion Testing of Standard Monel Seats

Feb 6, ASME/API Gas-Lift Workshop11 Erosion Testing of Standard Monel Seats Testing Program #1Testing Program #1 –Seat sizes of 1/8”, 3/16”, ¼”, 5/16”, and 3/8” were erosion tested. –Tests were performed at flow rates of gallons per minute. –The downstream pressure leaving the test fixture was maintained at 100 psig or greater.

Feb 6, ASME/API Gas-Lift Workshop12 Erosion Testing of Standard Monel Seats Testing Program #2Testing Program #2 –Seat sizes of 1/8”, 3/16”, ¼”, 5/16”, and 3/8” were erosion tested. –Tests were performed at flow rates of gallons per minute. –The downstream pressure leaving the test fixture was maintained at 100 psig or greater.

Feb 6, ASME/API Gas-Lift Workshop13 Erosion Testing of Standard Monel Seats

Feb 6, ASME/API Gas-Lift Workshop14 Erosion Testing of Standard Monel Seats

Feb 6, ASME/API Gas-Lift Workshop15 Erosion Testing of Standard Monel Seats

Feb 6, ASME/API Gas-Lift Workshop16 Erosion Testing of Standard Monel Seats Summary of Test ResultsSummary of Test Results –Results are not consistent with expected erosion patterns. Wire drawing and cutting was not evident, rather the erosion occurred very uniformly. –The leak rate increased after 1 hr, then decreased after 2 hrs, and then increased after 4 and 6 hrs. –Highest leak rates occurred with largest port sizes.

Feb 6, ASME/API Gas-Lift Workshop17 Erosion Testing of Standard Monel Seats Summary of Test ResultsSummary of Test Results –The erosion did not appear to extend down into the barrel of the seat. Thus when these seats are used in an orifice valve, the size of the port does not change. –The original backcheck was repeatedly used and after 30 hrs at 2 bbl/min was significantly eroded to the point of being useless as a reverse flow check.

Feb 6, ASME/API Gas-Lift Workshop18 Erosion Testing of Standard Monel Seats Conclusions and ConsequencesConclusions and Consequences –Unloading at rates up to 2 bbl/min will lead to moderate leak rates generally less than 1 Mscfd. –Erosion occurred at the sealing surface and was very uniform. –The biggest effect of the erosion will be the change in R ratio. The seat sealing area will be significantly larger then the port area.

Feb 6, ASME/API Gas-Lift Workshop19 Erosion Testing of Standard Monel Seats The Way ForwardThe Way Forward –The erosion testing program needs to be extended to include… erosive fluids erosive fluids TC seats TC seats effects on backchecks effects on backchecks continued erosion of leaking seats continued erosion of leaking seats erosion of cross-over ported seats erosion of cross-over ported seats erosion with downstream chokes erosion with downstream chokes

Feb 6, ASME/API Gas-Lift Workshop20 Erosion Testing of Standard Monel Seats The Way ForwardThe Way Forward –The VPC will continue the erosion testing program in 2001 to determine the erosion of TC seats. –The VPC program is open to other interested parties. –Contact Decker Technology, Inc.