11 Material Management Class Note # 2 MPS Practices – Available-to-Promise ( ATP ) Prof. Yuan-Shyi Peter Chiu Feb. 2011.

Slides:



Advertisements
Similar presentations
Purchase Order Confirmation Process In Purchase Order Collaboration Scenario (POC) INVENTORY COLLABORATION HUB.
Advertisements

Guidance Store System Miki Skorkovský. Standard Item Card (Steel)
Master Scheduling and Rough-Cut Capacity Planning
Table of Contents Solving Linear Inequalities Graphically It is assumed you already know how to solve linear inequalities algebraically. A inequality is.
1 Unit 4B - Logics and Calculation of Material Requirement Planning.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Inventory and MRP 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Chapter 13 – Aggregate Planning
Master Production Scheduling (MPS) – Basic Techniques pom
Example 14.3 Football Production at the Pigskin Company
5. Master Production Scheduling
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
MRP and Related Concepts
Master Production Scheduling
1 Wagner – Whitin Algorithm Prof. Yuan-Shyi Peter Chiu Feb Material Management Class Note #1-B.
Example 9.1 Goal Programming | 9.3 | Background Information n The Leon Burnit Ad Agency is trying to determine a TV advertising schedule.
By: Prof. Y. Peter Chiu Material Management ~ Mid-Term #1 Solution ~ 4 / 2010.
Supplement D Master Scheduling and Rough-cut Capacity Planning
Materials Requirement Planning (MRP)
Journalizing INVENTORY-Related Transactions Slideshow 8 B.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Use of Master Production Schedule:
Disaggregation Working with aggregate units facilitates intermediate planning. But to put this plan into action we should translate it, decompose it, disaggregate.
MNG221- Management Science –
MGMT Materials Management Systems Master Production Scheduling Chapter 3.
DOM 301 : Operations Management Practice
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
E-Commerce and Supply Chain Management (SCM)
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
GCSE Revision 101 Maths Quadratics © Daniel Holloway.
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Chapter 2 Data Handling.
Aggregate Planning.
Example 4.5 Production Process Models | 4.2 | 4.3 | 4.4 | 4.6 | Background Information n Repco produces three drugs, A, B and.
Ardavan Asef-Vaziri Systems and Operations Management
Resource Planning Chapter 14. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Product Mix & Master Production Scheduling
Master Scheduling Chapter 3.
Welcome to the Manage Inventory lesson for the North Carolina Immunization Branch. Contents: Adding Inventory Modifying Inventory Inventory Reports **
Managing Production across the Supply Chain
11 Master Scheduling CHAPTER
Hierarchy of Production Decisions
Database Systems Microsoft Access Practical #3 Queries Nos 215.
Printing the Receiver What this tutorial covers—and doesn’t 1. WebSMARTT: Print a Receiver 2.Count the actual quantities & write them on the form 3.Label.
Stock Valuation. Stock Stock (which is also known as inventory) consists of : Stock (which is also known as inventory) consists of : –Raw materials-goods.
Module 12 Managing supplies for a tuberculosis laboratory performing culture 1.
Since Pages 142 to 151 of the text are rather difficult to read, the following is a presentation of…
11 Material Management Class Note # 2 MPS Practices – Available-to-Promise ( ATP ) Prof. Yuan-Shyi Peter Chiu Feb
Aggregate Planning and Resource Planning Chapters 13 and 14.
Master Production Scheduling
1 FINANCIAL ACCOUNTING Week 2: LECTURE 2. 2 Learning Objectives What are accounts and what is the ledger? Understand the principles of double entry. Understand.
Training Day 5 Customer Order Processing Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.
2009 Club Secretaries Hans Granholm Electronic Communications District 5370 March
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning Chapter 15.
Resource Planning Chapter 15.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
Chapter 13 – Aggregate Planning Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
Project Based on fictitious Coffee Roasting CompanyCoffee Roasting Company Automatic Order Processing System – –Process “projected” Accept order from customer.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Material Requirements Planning
MRP and ERP  Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes.
PMI Returns Management Process
Disaggregation Working with aggregate units facilitates intermediate planning. But to put this plan into action we should translate it, decompose it, disaggregate.
Introduction to Materials Management
CHAPTER 14 MRP and ERP.
Introduction to Materials Management
What would improve the RAG status when amber or red
Problem DC 10-1, Page 547 (Original Problem)
Use the ten frames to help solve the problems
Master Production Scheduling (MPS)
Presentation transcript:

11 Material Management Class Note # 2 MPS Practices – Available-to-Promise ( ATP ) Prof. Yuan-Shyi Peter Chiu Feb. 2011

22 ~ MPS Practices ~ Order Promising : The process of making order delivery commitments  The delivery date is negotiated  Whether we can promise delivery on certain date or not ?! Extended MPS Record  Forecast  Customer orders (actual received)  Projected Available  Available–To–Promise (ATP)  MPS (scheduled shipments)

33 Projected Available = (Beginning inventory) + (MPS shipment) — max. [ (the period’s forecast),(actual customer orders) ] Period Forecast Customer orders Projected available Available – to – promise MPS (shipments Received) * the beginning inventory is 110 Then using formula, we obtain projected available as shown in red eg.

44 eg. (with projected available) Period Forecast Customer orders Projected available ATP MPS (shipments) Projected Available

55 ATP (Available–To–Promise) : The uncommitted portion of a company’s inventory and planned production, maintained in the MPS to support order promising  ATP action bucket : for current period  ATP future : for future replenishment periods

66  ATP action bucket = (beginning inventory ) + (MPS shipment) — (Customer orders before next replenishment)  ATP future = (MPS shipment) — (Customer orders between current MPS shipment and next scheduled replenishment) Period Forecast Customer orders Projected available ATP MPS (shipments) * ATP action bucket = – ( ) = 50 * ATP 3 = 125 – ( ) = 80

77 * ATP 5 = 125 – (15) = 110 * ATP 7 = 125 – 0 = 125 * ATP 8 = 125 – (10) = 115 * ATP 11 = 125 – (10) = 115  The ATP records show how much inventory is available to satisfy customer demand, to support order promising

88 * update customer order in period 5 to 200, below : Period Forecast Customer orders Projected available ATP MPS (shipments) * update projected available & ATP PA 5 = ( ) – max {75, 200 } = – 40 ATP 5 = 125 – ( ) = – 90 & PA 6 = (– 40) – max {75,15} = – 115 & so on. Using ATP practices Can you promise a customer’s purchase  Example # 1 : Can you promise a customer’s purchase of 200 units delivery set in period 5 ? of 200 units delivery set in period 5 ?

99  TWO rules to remember here ◇ rule #1 : A negative number in the projected available row is sometimes a problem ◇ rule #2 : A negative number in the ATP row is always a problem

10 Period Forecast Customer orders Projected available ATP MPS (shipments) * Use uncommitted units in period 3, ATP 3 = 80 – 80 = 0 and in period 1, ATP 1 = 50 – 10 = 40 i.e. mark 10 boxes in period 1 & 80 boxes in period 3 & 110 boxes in period 5 with the same client’s name  Example # 1Can you promise a customer’s purchase  Example # 1 : Can you promise a customer’s purchase of 200 units delivery set in period 5 ? of 200 units delivery set in period 5 ? ∴ we can promise a customer’s purchase of 200 units, delivering in period 5 delivering in period 5

11 Using ATP practices  Example # 2 : Can you promise next order for 50 units for period 4 delivery ? for period 4 delivery ? Period Forecast Customer orders Projected available ATP MPS (shipments)

12  Example # 2 : Can you promise next order for 50 units for period 4 delivery ? Period Forecast Customer orders Projected available ATP MPS (shipments) * Entering 70 in period 4 instead of 20; ∴ ATP 3 = 125 – ( ) = -50 & PA 4 = 30 – max { 50,70} = -40 & so no for PA 5 ……PA 12 By rule #2 : A negative number on ATP is always a problem ! But No prior available–to-promise units can satisfy this 50 units. (although APT 1 =40) Means, everything else has been promised. ∴ We can not accept this purchase order for period 4 ∴ We can not accept this purchase order for period 4 the earliest is in period 7 (why?) the earliest is in period 7 (why?)

13 Using ATP practices  Example # 3 : Can you promise an additional order for 50 units to be delivered in period 8 ?  Example # 4 : An additional 30 units for period 12 ? Period Forecast Customer orders Projected available ATP MPS (shipments)

14  Example # 3 : Can you promise an additional order for 50 units to be delivered in period 8 ?  Example # 4 : An additional 30 units for period 12 ? Period Forecast Customer orders Projected available ATP MPS (shipments) Yes, we can accept these orders ! Yes, we can accept these orders ! (see above)

15 §. Class Problems & Discussion Period Forecast Customer orders Projected available ATP MPS (shipments)  Problem #1 : Can you accept an order of 80 units for period 7 ?  Problem #2 : Continues on problem #1 ( using the result from #1 ) Can an additional order for 90 units, to be delivered at period 10, be accepted ?  Problem #3 : Continues on problem #2 ( using the result from #2 ) Can you accept an additional purchase order of 75 units for period 9 delivery ?

16 Period Forecast Customer orders Projected available ATP MPS (shipments) Accept the order {i.e. 80 units for period 7 }  Problem #1 : Can you accept an order of 80 units for period 7 ?

17 Period Forecast Customer orders Projected available ATP MPS (shipments)  Problem #2 : Continues on problem #1 (using the result from #1) Can an additional order for 90 units, to be delivered at period 10, be accepted ? Accept the order {i.e. 90 units for period 10 }

18 Period Forecast Customer orders Projected available ATP MPS (shipments) * Violates rule #2 ATP 8 = – 50, need to be solved * using 45 units from ATP 7, ∴ ATP 7 = 45 – 45 = 0 5 units from ATP 1, ∴ ATP 1 = 40 – 5 = 35 * Marking : 5 units at period 1 & 45 units at period 7 & 25 units at period 9 for this client’s name.  Problem #3 : Continues on problem #2 (using the result from #2) Can you accept an additional purchase order of 75 units for period 9 delivery ? 0 35

19 Period Forecast Customer orders Projected available ATP MPS (shipments) Accept the order {i.e. 75 units for period 9 }  Problem #3 : Can you accept an additional purchase order of 75 units for period 9 delivery ?

20 The End

21 Period Forecast Customer orders Projected available Available – to – promise MPS Class Note# 2 Class Note # 2 ATP - Problem #5 J.C. Sweaters has authorized the following MPS for her Exclusive line of cashmere sweaters. She wants to use the MPS record for promising future orders. Current order promises are included. The MPS order quantity is 60 units. Beginning inventory is 0. Complete the Following Projected available & ATP records.

22

23 Period Forecast Customer orders Projected available Available – to – promise MPS Projected available is calculated as Projected available = Beginning inventory + MPS shipment – the greater of the period’s forecast or the customer orders promised for delivery. Therefore, the projected available at the end of period 1 is 45 units (the beginning inventory of 0 plus the MPS shipment of 60, less the forecast of 15). The correct projected available quantities are shown here.

24 The ATP quantity in the action bucket is 25 units: a beginning inventory of 0 plus an MPS shipment of 60 units, less the customer order of 35 units before the next replenishment (12 in Period 1, 10 in Period 2, 8 in Period 3, and 5 in Period 4). Use the formula for ATP at MPS replenishments to calculate the order ATP quantities. ATP = MPS shipment – customer orders between current MPS shipment and next scheduled replenishment. Compare your answers with those shown on the previous page.

25 Class Note# 2 Class Note # 2 ATP - Problem #6 Jeannette, the owner of J.C. Sweaters has received several additional orders to consider. Using the ATP record calculated in Solved Problem #5, calculate which of the new order Jeannette should accept. The new orders are: (1) 20 units for delivery in period 4, (2) 50 units for delivery in Period 8, (3) 40 units for delivery in Period 12.

26 Period Forecast Customer orders Projected available Available – to – promise MPS /3 Projected available is calculated as Projected available = Beginning inventory + MPS shipment – the greater of the period’s forecast or the customer orders promised for delivery. Therefore, the projected available at the end of period 1 is 45 units (the beginning inventory of 0 plus the MPS shipment of 60, less the forecast of 15). The correct projected available quantities are shown here. Accept the order {i.e. 20 units for period 4 }

27 Period Forecast Customer orders Projected available Available – to – promise MPS /3 Projected available is calculated as Projected available = Beginning inventory + MPS shipment – the greater of the period’s forecast or the customer orders promised for delivery. Therefore, the projected available at the end of period 1 is 45 units (the beginning inventory of 0 plus the MPS shipment of 60, less the forecast of 15). The correct projected available quantities are shown here. Accept the order {i.e. 50 units for period 8 }

28 Period Forecast Customer orders Projected available Available – to – promise MPS /3 Projected available is calculated as Projected available = Beginning inventory + MPS shipment – the greater of the period’s forecast or the customer orders promised for delivery. Therefore, the projected available at the end of period 1 is 45 units (the beginning inventory of 0 plus the MPS shipment of 60, less the forecast of 15). The correct projected available quantities are shown here. Accept the order {i.e. 40 units for period 12 }

29 Period Forecast Customer orders Projected available Available – to – promise MPS The first step is to put the new orders into the MPS record and consider the implications. The updated MPS record is shown here. Note : Jeannette can accept order 1 for delivery of 20 additional sweaters in Period 4. She can also accept order 3 for 40 units delivered in Period 12. However, Jeannette has a problem accepting order 2. The ATP quantity in Period 8 is – 20, which means Jeannette must ensure that enough sweaters are available to satisfy that order.

30 Period Forecast Customer orders Projected available Available – to – promise MPS Projected available is calculated as Projected available = Beginning inventory + MPS shipment – the greater of the period’s forecast or the customer orders promised for delivery. Therefore, the projected available at the end of period 1 is 45 units (the beginning inventory of 0 plus the MPS shipment of 60, less the forecast of 15). The correct projected available quantities are shown here.

31 Period Forecast Customer orders Projected available Available – to – promise MPS Since the ATP quantity in Period 5 is 45 sweaters, Jeannette can set aside 20 of these sweaters so that she has enough to satisfy order 2. Therefore, she can accept all three orders. On the revised MPS record, we see that the customer order in Period 8 is reduced 20 units to 30 units, which are transferred to Period 5, and make customer orders to 40 units in period 5. The 20 units transferred to Period 5 are the 20 units that were not available in Period 8. Look at the changes in the updates MPS record.

32 The End