The Challenge of Mesoscale Probabilistic Weather Prediction and Communication Cliff Mass University of Washington.

Slides:



Advertisements
Similar presentations
SPC Potential Products and Services and Attributes of Operational Supporting NWP Probabilistic Outlooks of Tornado, Severe Hail, and Severe Wind.
Advertisements

Unisys Weather Information Services Presentation for NWS Partners Meeting Partner Perspective June 2010 Ron Guy, Director Unisys Weather
Mesoscale Probabilistic Prediction over the Northwest: An Overview Cliff Mass Adrian Raftery, Susan Joslyn, Tilmann Gneiting and others University of Washington.
Concept of Uncertainty - Resources and NRC’s report
2012: Hurricane Sandy 125 dead, 60+ billion dollars damage.
Mesoscale Probabilistic Prediction over the Northwest: An Overview Cliff Mass University of Washington.
1 WRF Development Test Center A NOAA Perspective WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006 Fred Toepfer NOAA Environmental.
Introduction to Weather Forecasting Cliff Mass Department of Atmospheric Sciences University of Washington.
Update on the Regional Modeling System NASA Roses Meeting April 13, 2007.
Update on the Regional Modeling System NASA Roses Meeting April 13, 2007.
Update on the Regional Modeling System Cliff Mass, David Ovens, Richard Steed, Mark Albright, Phil Regulski, Jeff Baars, David Carey Northwest Weather.
Weather Research & Forecasting Model (WRF) Stacey Pensgen ESC 452 – Spring ’06.
JEFS Status Report Department of Atmospheric Sciences University of Washington Cliff Mass, Jeff Baars, David Carey JEFS Workshop, August
Tolman, December 1, 2014The NPS- looking forward, 1/10 The NCEP Production Suite Looking forward Hendrik L. Tolman Director, Environmental Modeling Center.
Ensembles and Probabilistic Forecasting. Probabilistic Prediction Because of forecast uncertainties, predictions must be provided in a probabilistic framework,
Uncertainties about Uncertainty Cliff Mass. Major Issues.
A Brief History of Weather Forecasting. The Stone Age Prior to approximately 1955, forecasting was basically a subjective art, and not very skillful.
Ensemble Post-Processing and it’s Potential Benefits for the Operational Forecaster Michael Erickson and Brian A. Colle School of Marine and Atmospheric.
Chapter 13 – Weather Analysis and Forecasting. The National Weather Service The National Weather Service (NWS) is responsible for forecasts several times.
U.S. Numerical Weather Prediction: Time for a Restructuring? Clifford Mass University of Washington First Symposium on the Weather and Climate Enterprise.
MDSS Challenges, Research, and Managing User Expectations - Weather Issues - Bill Mahoney & Kevin Petty National Center for Atmospheric Research (NCAR)
The Traditional Forecast Process. The Forecast Process Step 1: What is climatology for the location in question? What are the record and average maxima.
Jordan G. Powers Mesoscale and Microscale Meteorology Division NCAR Earth System Laboratory National Center for Atmospheric Research Space Weather Workshop.
Enterprise Effort to Advance the National Ensemble Prediction System …a key initiative in the NWS Science and Technology Roadmap  NOAA and NWS Strategic.
1 NOAA’s Environmental Modeling Plan Stephen Lord Ants Leetmaa November 2004.
Probabilistic Prediction. Uncertainty in Forecasting All of the model forecasts I have talked about reflect a deterministic approach. This means that.
Status of RSA LAPS/MM5 System Sustainment John McGinley, Steve Albers*, Chris Anderson*, Linda Wharton NOAA Earth System Research Laboratory Global Systems.
1 Addressing Critical Skills Shortages at the NWS Environmental Modeling Center S. Lord and EMC Staff OFCM Workshop 23 April 2009.
ADVANCED KNOWLEDGE IS POWER Protect Life and Property Promote Economic Vitality Environmental Stewardship Promote Fundamental Understanding.
1 COMPLETING THE FORECAST: ASSESSING AND COMMUNICATING FORECAST UNCERTAINTY Zoltan Toth Environmental Modeling Center NOAA/NWS/NCEP Acknowledgements: NRC.
Providing data services, tools and cyberinfrastructure leadership Unidata Policy Committee May 2011 Organizational Collaboration, Participation,
Fly - Fight - Win 16 th Weather Squadron Evan Kuchera Fine Scale Models and Ensemble 16WS/WXN Template: 28 Feb 06 Air Force Weather Ensembles.
1 The WRF Developmental Testbed Center (DTC) Bob Gall A facility where the NWP research and operational communities interact to accelerate testing and.
2007 Climate Workshop NWS Eastern Region and Southern Region Chet Ropelewski Climate Assessment and Services Division NOAA Climate Program Office (CPO)
January NWS and Social Science Jennifer M. Sprague Strategic Planning & Policy Office National Weather Service National Oceanic and Atmospheric Administration.
Weather Information for Surface Transportation (WIST) Panel 3 Technical Risks and Challenges Bill Mahoney National Center for Atmospheric Research.
Communicating Climate and Weather Information Chris Elfring, Director Board on Atmospheric Sciences and Climate The National Academies 500 Fifth Street.
HWT Spring Forecasting Experiment: History and Success Dr. Adam Clark February 25, 2015 National Weather Center Norman, Oklahoma.
Hurricane Forecast Improvement Project (HFIP) Overview NOAA Hurricane Conference Ed Rappaport for Fred Toepfer and Bob Gall December 1, 2009.
Celeste Saulo and Juan Ruiz CIMA (CONICET/UBA) – DCAO (FCEN –UBA)
Notes on reforecasting and the computational capacity needed for future SREF systems Tom Hamill NOAA Earth System Research Lab presentation for 2009 National.
Higher Resolution Operational Models. Operational Mesoscale Model History Early: LFM, NGM (history) Eta (mainly history) MM5: Still used by some, but.
1 Agenda Topic: National Blend Presented By: Kathryn Gilbert (NWS/NCEP) Team Leads: Dave Myrick, David Ruth (NWS/OSTI/MDL), Dave Novak (NCEP/WPC), Jeff.
Office of Coast Survey Using Partnerships to Improve NOAA’s Storm Surge Products and Forecasts Jesse C. Feyen Storm Surge Roadmap Portfolio Manager National.
3 rd Annual WRF Users Workshop Promote closer ties between research and operations Develop an advanced mesoscale forecast and assimilation system   Design.
Higher Resolution Operational Models. Major U.S. High-Resolution Mesoscale Models (all non-hydrostatic ) WRF-ARW (developed at NCAR) NMM-B (developed.
1 11/25/2015 Developmental Testbed Center (DTC) Bob Gall June 2004.
1 Update on Enterprise Strategic Implementation Plan for Generating and Communicating Forecast Uncertainty Tom Hamill for Paul Hirschberg and Elliot Abrams,
APPLICATION OF NUMERICAL MODELS IN THE FORECAST PROCESS - FROM NATIONAL CENTERS TO THE LOCAL WFO David W. Reynolds National Weather Service WFO San Francisco.
Slides for NUOPC ESPC NAEFS ESMF. A NOAA, Navy, Air Force strategic partnership to improve the Nation’s weather forecast capability Vision – a national.
UNCLASS1 Dr. Gene Whitney Assistant Director for Environment Office of Science and Technology Policy Executive Office of the President WISP Meeting - July.
1 Partnership Roles NWS Goes Digital Edward Johnson, Director Strategic Planning and Policy.
Date: UMAC Review Highlights at NCEP Production Suite Review (NPSR) UMAC committee Richard Rood and Frederick Carr, co-chairs December 7, 2015.
Ensembles and Probabilistic Prediction. Uncertainty in Forecasting All of the model forecasts I have talked about reflect a deterministic approach. This.
Update on the Northwest Regional Modeling System 2015 Cliff Mass and David Ovens University of Washington.
1 Symposium on the 50 th Anniversary of Operational Numerical Weather Prediction Dr. Jack Hayes Director, Office of Science and Technology NOAA National.
Science plan S2S sub-project on verification. Objectives Recommend verification metrics and datasets for assessing forecast quality of S2S forecasts Provide.
GEO Implementation Boards Considerations and Lessons Learned (Document 8) Max Craglia (EC) Co-chair of the Infrastructure Implementation Board (IIB) On.
DTC Overview Bill Kuo September 25, Outlines DTC Charter DTC Management Structure DTC Budget DTC AOP 2010 Processes Proposed new tasks for 2010.
1 NCEP’s Climate Forecast System as a National Model “Where America’s Climate, Weather and Ocean Services Begin” 32 nd Climate Diagnostics and Prediction.
Fly - Fight - Win 2 d Weather Group Mr. Evan Kuchera HQ AFWA 2 WXG/WEA Template: 28 Feb 06 Approved for Public Release - Distribution Unlimited AFWA Ensemble.
DET Module 1 Ensemble Configuration Linda Wharton 1, Paula McCaslin 1, Tara Jensen 2 1 NOAA/GSD, Boulder, CO 2 NCAR/RAL, Boulder, CO 3/8/2016.
Hurricane Joaquin Frank Marks AOML/Hurricane Research Division 10 May 2016 Frank Marks AOML/Hurricane Research Division 10 May 2016 Research to Improve.
Summary of the Report, “Federal Research and Development Needs and Priorities for Atmospheric Transport and Diffusion Modeling” 22 September 2004 Walter.
University of Washington Ensemble Systems for Probabilistic Analysis and Forecasting Cliff Mass, Atmospheric Sciences University of Washington.
Ensembles and Probabilistic Prediction
A Northwest Consortium for Regional Climate Modelling
Mesoscale Probabilistic Prediction over the Northwest: An Overview
Summary of the 7th NCEP Ensemble User Workshop
Presentation transcript:

The Challenge of Mesoscale Probabilistic Weather Prediction and Communication Cliff Mass University of Washington

Major Points During the next decade, the U.S. atmospheric sciences community must transition from deterministic single-value forecasting to probabilistic weather prediction. Why? Because there is great value in probabilistic weather information for a wide variety of users. U.S. progress in high-resolution probabilistic prediction has been lacking and this country has now lost leadership to others. U.S. capabilities have stagnated.

Major Points This loss of leadership has many causes: lack of resources, lack of coordination and cooperative efforts, not-invented-here attitudes, disconnection between the operational and research communities, and insufficient targeted R&D. The U.S. does have substantial resources available for the probabilistic transition, including a number of regional and institutional efforts. With more active cooperation and increased leadership of the NWS and others, rapid progress is possible. The transition to probabilistic prediction will be difficult and requires the efforts of the entire weather enterprise.

Major Points The time for concrete action has come. Just like the national health plan.

This meeting was designed to review U.S. and international capabilities, promote frank discussion---leading to a plan of action that accelerates U.S. development and operational capabilities.

The importance of the transition to probabilistic prediction has been made clear in a number of national studies, including the recent National Academy report “Completing the Forecast”

Some findings of that report “ All prediction is inherently uncertain and effective communication of uncertainty benefits users’ decisions.” “ … many products from the Enterprise lack uncertainty information or include it ineffectively.” “ Effective incorporation of uncertainty information will require a fundamental and coordinated shift by all sectors of the Enterprise. “

Meteorology is only part of the challenge Developing the science and technology for producing sharp and reliable probabilistic information is only half the battle…and perhaps the easiest part. Probably more difficult is learning how to communicate and display uncertainty information and to make it useful to society. Both physical AND social scientists will be needed.

Our Current Probabilistic Report Card

Some subjects we receive poor grades

Deterministic Forecasting Dominates The overwhelming majority of products disseminated by the government, the private sector, and others is deterministic in form.

Even when we try to provide probabilistic information we are not doing a good job. Lack of active participation of social scientists. National Weather Service Icons Poor Communication

Inadequate National Mesoscale Ensemble System (SREF) Too coarse (32 and 40 km grid spacing) Questionable approach to diversity (breeding) Poor performance (NWS SREF ensemble mean is inferior to GFS deterministic forecasts) Lack of post-processing. Lack of resources and personnel

The U.S. has lost leadership in mesoscale probabilistic prediction Example of a superior non-U.S. system: MOGREPS – 24 km resolution (U.S. SREF 32 and 40 km) – Uses ETKF for diversity (U.S. uses breeding) – Stochastic physics Canadian Meteorological Center is using sophisticated post- processing: BMA

Report Card The Navy and Air Force have not worked together effectively or with sufficient resources to make their Joint Ensemble Forecasting System (JEFS) a success. Probabilistic prediction technology using MOS has been relatively stagnant over the past decades Lack of effective probabilistic verification statistics for a range of parameters. Lack of enterprise-wide prioritization and cooperation for an essentially enterprise issue.

Better Grades The NWS has been more effective in fostering synoptic ensembles both internally and in cooperation with other nations (e.g., NAEFS)

Better Grades A number of U.S. groups have valuable experience with mesoscale ensemble prediction (e.g., NSSL/OK, University of Washington, NCEP EMC, NCAR, NOAA ESRL, NRL Monterey).

Better Grades Strong private sector that has extensive web- weather outlets that could be used as conduits for probabilistic information. National open data policy. Increased computational capabilities by operational agencies. NCAR’s Developmental Testbed Center stands ready to contribute substantially to probabilistic prediction R&D.

A Recognition That We Must Act A number of national reports (e.g., NAS Completing the Forecast) The establishment of the AMS Ad-hoc Committee on Uncertainty Forecasts (ACUF) and their town hall gatherings at AMS annual meetings. The recognition by the NWS that high-quality probabilistic prediction is required to support the FAA NEXGEN system and other needs.

This is not going to be easy The science and technology is not fully ready for the challenge and R&D is still required. Example: We really don’t know how to properly sample model and initial state diversity. Example: We lack the ability to provide high-resolution probabilistic forecasts for secondary quantities (e.g., ceiling, visibility). Example: We are still not sure about the best approaches for post-processing-BMA, EMOS, reanalysis

Not Easy Example: 0-6 hr probabilistic prediction and analysis Example: Ensemble-based data assimilation appears to have great promise but requires more testing and development.

Not Going to Be Easy Even more daunting is the communication and application of probabilistic information. – We don’t know how to package the information to the general public to be accessible. We can’t overwhelm them with a mountain of information. – How can we make this information usable for a wide variety of more sophisticated users.

Editorial If we pull this off, it will represent a new paradigm of enterprise-wide cooperation that could benefit other aspects of weather prediction.

140 years since old “Ol Probs” told us that we must work towards probabilistic prediction Professor Cleveland Abbe Cleveland Abbe issued the first public “Weather Synopsis and Probabilities” on February 19, 1871 It is time for us to complete the work and make high- resolution probabilistic prediction the centerpiece of the U.S. weather forecasting enterprise.

The END