incorporates gas collection, storage and compressor system leachate collection, storage and treatment facilities. prevent leachate leakage into ground water
gas leakage detection p robes. leachate monitoring well and ground water monitoring well
Design & operation SLF Several important factors must be considered: land area cover material cell design and construction equipment requirement personnel requirement finance drainage
spread and compaction water supply fire prevention facilities fencing - gatehouse operation time land use after completion of landfill wheel cleaning notice board
Population protection site location rainfall temperature Soil type wind Hydrological properties and water table
compaction landfill essential to reduce settlement take about 2 years prevent fire eliminates odour, flies & vermin for building structure – 10 – 12 years
ideally compacted fill should have density of 900 – 950 kg/m 3 densities are measure by using backhoe method and auger method. the values depend on:
Type of waste Pretreatment Composting of waste Time of landfill Moisture content Type of landfill Stage of compaction
Leachate define as liquid that has percolated through solid waste and has extracted Dissolved or suspended material
average amount of leachate generated is 150L//tonne contain organic matter, nitrogen (ammoniacal), suspended solid salts & colouring matter. constration of eluted matters will be highest the first 3 – 8 years.
quantity of leachate produced depend on factors: Soil type Waste composition Degree of composition Rainfall Evaporation Landfill type and age
incorporates gas collection, storage and compressor system leachate collection, storage and treatment facilities. prevent leachate leakage into ground water
gas leakage detection p robes. leachate monitoring well and ground water monitoring well
Design & operation SLF Several important factors must be considered: land area cover material cell design and construction equipment requirement personnel requirement finance drainage
spread and compaction water supply fire prevention facilities fencing - gatehouse operation time land use after completion of landfill wheel cleaning notice board
Population protection site location rainfall temperature Soil type wind Hydrological properties and water table
compaction landfill essential to reduce settlement take about 2 years prevent fire eliminates odour, flies & vermin for building structure – 10 – 12 years
ideally compacted fill should have density of 900 – 950 kg/m 3 densities are measure by using backhoe method and auger method. the values depend on:
Type of waste Pretreatment Composting of waste Time of landfill Moisture content Type of landfill Stage of compaction
Leachate define as liquid that has percolated through solid waste and has extracted Dissolved or suspended material
average amount of leachate generated is 150L//tonne contain organic matter, nitrogen (ammoniacal), suspended solid salts & colouring matter. constration of eluted matters will be highest the first 3 – 8 years.
quantity of leachate produced depend on factors: Soil type Waste composition Degree of composition Rainfall Evaporation Landfill type and age