1 OPTIMA PROJECT Third Management Board Meeting, Gumpoldskirchen, Austria, May 18/20, 2006 Tunisia case study By Ahmed EZZINE.

Slides:



Advertisements
Similar presentations
UNSD-CELADE Regional Workshop on Census Cartography for the 2010 Latin America’s census round Census Cartography: Organizational and Institutional Issues.
Advertisements

Let’s recap… definition of a resource and a region importance of water as a resource in Australia geographic characteristics of the Murray-Darling Basin.
Getahun Wendmkun Adane March 13,2014 Groundwater Modeling and Optimization of Irrigation Water Use Efficiency to sustain Irrigation in Kobo Valley, Ethiopia.
Spatial analysis tools for biodiversity indicators on habitats and ecosystems Expert meeting on multi-scales mapping and integrated analysis of landscape.
19/12/2006 CNTD-2006 OPTIMA PROJECT Tunisia case study Fourth Management Board Meeting December 19-20, 2006 Milano.
George Büttner et al.: Institute of Geodesy, Cartography and Remote Sensing (FÖMI) Remote Sensing Centre Budapest, Hungary Construction.
SMART INCO-MED 1 st Management Board Meeting, June NCRS, Beirut WaterWare Data Requirements DDr. Kurt Fedra ESS GmbH, Austria
1 New data to update the models: After the stakeholders workshop Third Management Board Meeting Gumpoldskirchen May 2006.
OPTIMA PROJECT Fourth Management Board Meeting December 19-20, 2006, Milano STAKEHOLDERS’ INVOLVEMENT.
WATER RESOURCES SIMULATION
Use of Remote Sensing and GIS in Agriculture and Related Disciplines
Optimization for Sustainable Water Resources Management (OPTIMA) Presentation of Jordan Case Study Zarqa River Basin to the Third Management Board Meeting.
West Hills College Farm of the Future. West Hills College Farm of the Future Where are you NOW?! Precision Agriculture – Lesson 3.
GIS-Data Sources Francisco Olivera, Ph.D., P.E. Srikanth Koka Department of Civil Engineering Texas A&M University.
OPTIMA INCO MPC 1 st MANAGEMENT BOARD MEETING APRIL , IZMIR TURKEY.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
OPTIMA Optimization for Sustainable Water Resources Management Kick-off Meeting, Malta October 2004 Lebanon Partner 8 WP 5 – Land use change: Remote Sensing.
GEOCODING AND CENSUS MAPPING WITH GIS IN NAMIBIA BY Ms Ottilie Mwazi Central Bureau of Statistics Tel: +264.
HAMMAMET CASE STUDY PROGRESS September 2004 Realization of an Hydrogeologic Information System of Nabeul-Hammamet region.
Soil Water Assessment Tool (SWAT) Model Input
Spatial data Visualization spatial data Ruslan Bobov
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
URBAN AND NATURAL ENVIRONMENT CONSULTANTS European Commission 6 th Framework Programme for research and Technological Development Optimisation For Sustainable.
Predicting land use changes in the Lake Balaton catchment (Hungary) Van Dessel Wim 1, Poelmans Lien 1, Gyozo Jordan 2, Szilassi Peter 3, Csillag Gabor.
Hydrosphere. The hydrosphere is formed by all bodies of water on the Earth’s surface. Some parts are: oceans, rivers, streams, lakes, underground, atmosphere.
EU, SIXTH FRAMEWORK PROGRAMME Optimisation for Sustainable Water Management EU funded Project: OPTIMA INCO-MPC Partner: INTERGEO Environmental Technology.
Dr. R.P.Pandey Scientist F. NIH- Nodal Agency Misconception: A DSS takes decisions ---(No)
Geographic Information Systems Other Digital Data.
Geo-referenced Information Processing System. ISPRS Geoprocessing Technologies to collect and treat spatial information for a specific goal. Geoprocessing.
MARS Geodatabase (5.1.1): and Pressure data Ljubljana.
Characterization Report Module 2: Water Budget, Pressures and Impacts, Significant Water Management Issues, Monitoring, Characterization Report Characterization.
1 OPTIMA INCO-MPC Project kick-off Meeting, October 28/29 Malta DDr. Kurt Fedra ESS GmbH, Austria Environmental Software.
BELARUSIAN STATE TECHNOLOGICAL UNIVERSITY R E P OR T A B O U T R E S E A R C H W O R K 2.5. Define necessary data set for monitoring and tracking the dynamic.
MRC Water Utilisation Programme 20 May 2003 Knowledge Base & DSF Software Presenter: Dr Jon Wicks, Software Integration Specialist in association with.
WaterWare concepts and data requirements DDr. Kurt Fedra ESS GmbH, Austria Environmental Software & Services A-2352.
Proposed EEA approach to establish an environmental- compatible wind energy potential in Europe Hans Eerens MNP Netherlands Copenhagen 9 November 2006.
OPTIMA October 2004 WP01 Requirements and constraints.
STRATEGIC APPROACHES TO INTEGRATED MANAGEMENT OF LAND, WATER AND LIVELIHOODS IN THE ABYAN DELTA, YEMEN Dr. Khader Balem Atroosh WLI Focal Point, Yemen.
CLIMATE CHANGE AND WATER MAKING RIVER BASIN MANAGEMENT PLANS “CLIMATE PROOF” IN SPAIN.
MEDITATE - Kick-off meeting - Montpellier, 07-08/05/04 IWRM Integrated Water Resources Management EAU/RMD Sandra Lanini.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND BERG WMA.
OPTIMA Optimisation for Sustainable Water Resources Management October 28, 29 th 2004 Malta kick-off meeting National Centre for Remote Sensing - TUNISIA.
National and regional activities for environment observations Natalya Shulgina Uzhydromet World Environmental Day Round Table GEO CBC7 Meeting 5 June,
Water Productivity A Road to Sustainable Agriculture Dr. Saeed Nairizi President, ICID Jan
19 June 2003, Athens, Greece INTEGRATED MANAGEMENT THE RIVER BASIN PERSPECTIVE The Jucar River Basin - First results Teodoro Estrela Júcar PRB Coordinator.
Collecting, Processing and Distributing of Water Statistics in the Republic of Belarus Zhanna Vasilevskaya, Belarus International Work Session on Water.
What is geography? What is the location of the Atlantic Ocean relative to Africa?
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
BASIN SCALE WATER INFRASTRUCTURE INVESTMENT EVALUATION CONSIDERING CLIMATE RISK Yasir Kaheil Upmanu Lall C OLUMBIA W ATER C ENTER : Global Water Sustainability.
OPTIMA OPTIMA Optimisation for Sustainable Water Resources Management The Case of the Gediz River in Turkey 28–30 October 2004 Senglea, MALTA.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
GUASEEAW: 2nd Co-ordination Meeting GUASEEAW: 2nd Co-ordination Meeting The main objectives of GuaSEEAW project are: 1.To obtain detailed.
Corn Yield Comparison Between EPIC-View Simulated Yield And Observed Yield Monitor Data by Chad M. Boshart Oklahoma State University.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
HYDROCAREHYDROCAREHYDROCAREHYDROCARE PP6 - Laboratory of Hydrology and Water Resources Management1 PP6: Laboratory of Hydrology and Water Resources Management.
Physical and Human Geography
Romanian’s experience in waste water statistics National Institute of Statistics ROMANIA.
CASE STUDY: LITANI LOWER BASIN Progress Gumpoldskirchen May 2006.
Review of RRSF Implementation ICT and Geo-information
Optimization   for Sustainable Water Resources Management (OPTIMA)
WaterWare description
Environmental modeling application domains
GISCO Torbiörn Carlquist Statistical Office of the European Commission
WaterWare description
WP05: Turkey Land Use Change Model
Presentation of Jordan Case Study Second Management Board Meeting
INTERNET-BASED APPLICATION FOR RURAL ELECTRIFICATION STATUS AND PLANS VISUALISATION IN BURKINA FASO GEONET©
Presentation of Jordan Case Study First Management Board Meeting
Presentation transcript:

1 OPTIMA PROJECT Third Management Board Meeting, Gumpoldskirchen, Austria, May 18/20, 2006 Tunisia case study By Ahmed EZZINE

2  METHODOLOGY  CONCLUSION  PRODUCTS / REALIZATION  WATERWARE MODELS (RRM & WRM) Table of Contents

3 METHODOLOGY Primary data Collection Analysis and data Processing Geographic Information Conception WaterWare system Bibliography Satellite map, maps (topo,soil…) Hydrogeologic data Socio-economic data Meteorological data IMPLEMENTATION OF RRM & WRM

4 Case Study Water use  Domestic  Industry  Agriculture Increase Melian basin Area = 553Km² Population = inhabitants 4 subcatchments Dense Drainage network Aquifer Lithology = plio-quaternary Groundwater storage = MCM/ year Exploitation = 28.1 MCM / year Nbre of Bore hole = 494 State = overexploitated Noeuds Barrages: El H’ma 26 mountains lakes 2500 wells Case study: Melian basin, TUNISIA

5 Input of WaterWare 2 land use maps PRODUCTS / REALIZATION A geographic database 40 vector layers 6 raster data Hydrogeologic, Hydrologic and Climatologic database in order to determine the: Hydrological characteristics Hydrogeological characteristics

6 Geographic database Thematic map Soil map Hydrographic map Topographic map Geologic map Soil Type Contour line, road network Railway, bench mark… Lithology, tectonic Corine land cover Aerial photos 2000 Spot image 1988 Land use map (1988 & 2000)

7 Hydrologic study of the catchment areas m m m m m m m m 0-77m Hydrography Elevation Digital Elevation Model of the drainage basin of Melian Catchment geometry Catchment relief Drainage network Water inflow in the catchments

8 The methodology of the cartographic edition Land Use map Natural areas Arable land Permanent crops Pastures Heterogeneous agricultural Spot XS Agricultural areas environment Artificial Surface environment Urban fabric Industrial, commercial area Dump and mine Forest Water bodies Photo-interpretation and classification LAND USE MAP Aerial photography Corine land cover legend

9 Land use map (1988)

10 Land use map (2000)

11 No change Change Land Use Change

12 Statistical Land Use Change Classesarea1988(m²)area2000(m²)LUC /total (%) Artificial Surface ,60 Agricultural Area ,76 Forest and Semi-natural area ,17 Water Bodies ,98 ClassesCode area(m²) % area Artificial Surface 11: Urban fabric ,794,12 12: Industrial, commercial and transport units ,183,68 13: Mine, dump and construction sites ,370,95 Agricultural Area 21: Arable land ,092,31 22: Permanent crops ,764,07 23: Pastures ,55 24: Heterogeneous agricultural areas ,21,56 Forest and natural area 31: Forest ,577,29 32: Herbaceous vegetation association , : Open spaces with little or no vegetation ,020,05 Water Bodies 51: Inland waters ,432,6 52: Marine waters ,320,08

13 Index of Areas changes

14 Hydrogeologic Information System(HIS) Hydrogeologic Information System Hydrologic dataHydrogeologic data Environmental dataMeteorological data  Management of the catchments area  Management of the regions  Determination of the hydrologic characteristics  Calculate the inflow Water in each Catchment  Characteristics of 2460 Well  Dams and lakes characteristics  Climat data: Temperature Rainfall Wind Evaporation  Treatment station plant Generality of STEP Affluents STEP Effluents STEP  Hydrogeologic characteristics of the Groundwater

15 Hydrologic data Hydrogeologic data Meteorological data Environmental data GIS data Main interface of the HIS

16 Interest of the Hydrogeologic Information System  A Data Bank with a maximum of data about region’s feature (hydrological, hydrogeological, environmental, meteorological, soil, GIS data…)  Regroup and organize data in the same frame. The scatting of the hydrogeological data about the catchment area will be a hurdle behind researches  Update will be very easy since data will be centralized  Simulation of water inflow in the catchment  Conception allowing making additions of new frames and modules  We can manage a SHP files without using ArcView

17 WATERWARE MODELS (RRM & WRM)

18 RAINFALL/RUNOFF MODEL (RRM)

19 Implementation of RRM model

20 Parameters of RRM model

21 Elevation distribution (area/elevation)

22 Land use distribution

23 Results of RRM

24 Results of RRM

25 Results of RRM

26 WATER RESSOURCE MANAGEMENT MODEL (WRM)

27 Water nodes  Dams: name, coordinates, sector, year of construction, storage capacity, irrigated area, inflow water, name of catchment…  Collection of historic data related to observation wells in the groundwater  Mountains Lakes: name, coordinates, realization year, name of catchment, area of the catchment, storage capacity, delegation…  Observation well: name, coordinates, year, dry residue, standing water level…  Collection of 2500 wells built in the case study: complete information is available concerning: wells depth, diameter, usage, exploitation, equipment, standing water level, dry residue…  Collection of hydrologic, hydrogeologic and meteorologic data

28 WaterWare nodes chart

29 Melian basin Rmel basin Melah basin Hma basin Hma reservoir TP Tourristic Domestic Industry Medgerda Canal Irrigation Groundwater Sea Topologic model Demand node Start node End node Treatment node Reservoir node

30 Implementation of WRM model

31 Reservoir node

32 Irrigation node

33 Diversion node

34 Results of WRM

35 Results of WRM

36 Planned Work Identification and analysis of indicators (physical & economic) and investigation of water quality related impacts Dissemination of experience and results on the local and international scales. Refinement and updating of GIS data base Refinement and updating of GIS data base Try to run the WRM model with new time series collected from stakholders Try to run the WRM model with new time series collected from stakholders Optimisation scenarios Optimisation scenarios WP04 Water Technologies WP04 Water Technologies

37 CONCLUSIONS  Geographic database  40 layers SHP and 6 raster data  Two Land use map (1988 & 2000)  Land Use Change map  Hydrogeological database  Information about 2460 wells (depht, standing water level, salinity,…)  Information about the groundwater (phreatic and profond)  Information about nodes:  Lake, dam…  Observation well, bore hole…  Vectors layers and raster data technical report  Hydrological technical report  Determination of the inputs user in WaterWare Realized works:

38  Implementation of RRM and WRM model  GIS data sent to NCRS  Topologic model of the basin has been identified  Establish the Stakholders database Realized works:  Stakeholders Workshop

39 THANK YOU FOR YOUR ATTENTION!