Nikolaus Sires ET-493 Advisor: Dr. Rana Mitra. Problem 1 The site of this senior project is a pond of approximately three acres. I desire to remove one.

Slides:



Advertisements
Similar presentations
Real-time monitoring of Bridge Pier scouring during Flood events Director: Dr. Marlin H. Mickle Co-Director: Dr. Ervin Sejdić Graduate Students: Nicholas.
Advertisements

I E Industrial Equipment Servicing the North State Environmental Cleaning Systems Site Design Comparisons Site Design Comparisons (System Pretreatment)
US Army Corps of Engineers BUILDING STRONG ® Craney Island Dredged Material Management Area AIWA Conference Thomas C. Friberg, P.E. Chief, Operations Support.
Small Wind Production Wind power solutions at home.
Pulse Drying What is it?. Pulse Drying Pulse drying is a relatively new technique for rapidly drying high moisture/medium solids feed streams into a much.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Cascade Charter Township
The SYNERGY system from Quanics Inc. is a revolutionary new above-ground advanced treatment system platform. The self-contained system combines the benefits.
CERT MEOC Mobile Emergency Operations Center Concept designed by Keith Morin & Associates - Tucson, AZ.
Cortney L. Ohs, Ph.D. Aquaculture Ponds. Topics Site Considerations –Water –Soil –Topography –Types of ponds –Cost Construction of ponds –Levee ponds.
Wastewater Storage Pond Design
Water Analysis of the University of Cincinnati, Clermont Campus Bridget Jennings, Brittany Miller, Sara Neel, Kristopher Thomas, Tricia Wright June 6,
1 Math Questions. 2 Length x Width x Water Depth = cubic feet.
Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)
Team 2: Kelly Foster Chad Mills Lirjon Llusho Dave Rosso September 30, 2009.
Josiah Dobson Brett Nicholson Travis Befus Team 11.
From 12/2 – 12/9. DirectionA XA YA ZM XM YM Z North East South West
Best Hills Ranch Lake Sediment Investigation Danelle Russell Josh Peterson Chris Foster Sarah Richardson.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
SUSTAINABLE RESIDENTIAL DESIGN PROJECT SIKESTON HOUSE Project 12 DS 413 MAY 8 TH, 2012.
Local Motion Marco Maffeo-Robinson Sean Horning Justin White Ross Ziskind Tom Kidd Advisor: Professor Coleman Company Contact: Brian Costello.
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
A Florida-Friendly Landscape Adopting University of Florida Fall 2009
Understanding Feasibility Reports TCO 341 Dr. Codone Fall 2002.
Genesis Solar Module Brochure ™
Designing Solar PV Systems (Rooftops ). Module 1 : Solar Technology Basics Module 2: Solar Photo Voltaic Module Technologies Module 3: Designing Solar.
Management of Spills & Leaks Two areas of focus: Prevention: Taking steps to minimize the potential for a spill and properly maintaining equipment to eliminate.
Wes Marshall, P.E. University of Connecticut March 2007
PV System Components Advanced Engineering The Technology Landstown High School.
Model LS-2001 Lift Station Controller Model LS-2001 Lift Station Controller Copyright, 2006 © U-Tap Controls Click on slide to move through presentation.
Presentation of Construction ServicesClient Name // date or name of group Client Name or Client logo G REEN T ENANT G UIDE O VERVIEW A PRIL 2011.
Sustainability in Non Domestic Construction By Professor Christopher Gorse – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike.
A Solar Powered Bus Stop System
1 Batteries Battery Principles Battery Types Battery System.
Water Well Design August 6, 2015 AL/MS AWWA Ralph Hayes, P.E., BCEE Engineering Director MSDH, Bureau of Public Water Supply.
March 9, 2011 Report on Construct & Equip Wells (Moniter, 6400 South, 1330 East)
Why is resource assessment important? It wont work without the resource! (Lawn ornament) It will not provide a return on investment without working! You.
Chapter 3 Dr. Bahaa Al-Sheikh & Eng. Mohammed Al-Sumady Intoduction to Engineering Introduction to Engineering Design 1.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Dr. Cris Koutsougeras Advisor: Edward Rode.
What is my job? To eliminate and reduce pollutant discharges going to storm drains.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Development of Bolt-on Low Profile Overflow / Orifice PIT Tag Antennas for John Day Dam Adult Ladders PTAGIS Field Office Kennewick, Washington November.
Photovoltaic Panels to generate electricity Six “banks” total 6.6kW = home requirement.
ROCK KOSHKONONG LAKE DISTRICT Lake Dredging Project.
Designing for the Other 90% THE WUCKET “the filtering bucket designed for water well use”
Stillwater The Joy of Water Gardening in Oklahoma.
Real-time Parathyroid Visualization System for use in Endocrine Surgery Oral Presentation 2 Jan. 19, 2010 BME 273 Senior Design Group 1 Isaac Pence Advisors:
Senior Project 24’x24’ structure By: Andrew LeBlanc ET-493 Fall 2013-Spring 2014 Advising by: Rudolph Rode and Byron Patterson.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 EPS—Design Lesson 20 Spring 2005.
Evaluation Measures for Municipal Storm Water Management Programs Daniel Rourke Fresno Metropolitan Flood Control District October 15, 2003 Counting Raindrops.
7-3 Circles p Formulas for circles Example 1 A dog is tied in a yard using a 15-foot leash. The leash is anchored 6 feet south and 9 feet west.
May 2010 Photo provided by the Trust for the National Mall U.S. Commission of Fine Arts Concept Review.
Power Generation Wind Power. Wind Power Wind turbine power has been around since 500 BC when the Persians used them for grain-grinding and water pumps.
Culler Lake Bathymetry: Potential Changes Following Dredging Spring 2013 Sampling Methods Class: J. Bruland, M. Dybala, N. Gunther, A. Hoffman, J. Jones,
August 2008 Preparing the Planting Site Developed by: Dr. Teri Hamlin Georgia Department of Education.
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Solar Tank Storage vs Batteries. Two important concepts Water per day –Total water requirements for the application –Pump water during daylight hours.
Can you guess what this is about…
William Burton Fred Kelley Versar, Inc Rumsey Road
Analysis of Qabalan, Water Network , Design of Wastewater
Photovoltaic Systems Engineering Session 15 Stand-Alone PV Systems
Floating Semi-Self Sustaining Housing Unit ET494
Drawing Interpretation
ET 494: Senior Design Design of a New Hammond Head Start Center
Houston, TX Tyler Gentry – Fall09
Small Radio Controlled Dredge
Dunleith Lane drainage Spring 2015
SE 12th Street Roadway Improvements February 8, 2005.
Photovoltaic Systems Engineering Session 19 Solar+Storage Systems
Site and Context. Section from East Section E2 Section E1 Sannidhanam Malikapuram Sannidhanam Malikapuram.
Presentation transcript:

Nikolaus Sires ET-493 Advisor: Dr. Rana Mitra

Problem 1 The site of this senior project is a pond of approximately three acres. I desire to remove one foot of loose sediment from the bottom. This amount of sediment would be approximately 5,000 cubic yards. (A percentage of this will be water)

Problem 2 The site is surrounded by trees, and I desire to minimize the environmental impact to the location. Typical remote controlled dredging systems are large and cumbersome.

Solution I propose the construction of a small, partially radio controlled dredging system. Propulsion could be achieved through the use of a trolling motor/motors. Dredging could be done through the use of a small trash pump mounted to a floating platform, or an electric pump powered by a small generator.

Some ideas Use winches to raise/lower the suction hose and anchors Solar panels to maintain battery life and minimize downtime for charging of these systems Floating discharge hose easily redirected from the bank Radio control system to control trolling motors

Other considerations How to catch the sediment removed How much of one hour can be devoted to actual dredging, and not relocation of the dredge system

Preliminary numbers Typical small trash pump capable of moving up to 16,000 gallons per hours At 50% efficiency and 50% of the material being sediment and not water, this equates to 20 cubic yards per hour with dredge working the entire hour. It took about 8 hours for me to move 1 cubic yard of material (with the pond drained)

Deliverables Examine the pros/cons of a pump centered system vs. a generator based system Take sediment samples from various locations in the pond and determine average pond depth Make selection of system type based upon soil sample findings Draw design plans to allow ease of system access based on findings of average pond depth Complete cost analysis of dredging system costs Study methods to efficiently collect dredged pond sediment Begin purchasing materials and assembly of dredging system

Timeline System type study 3/05/ /19/2015 Take sediment samples 3/16/ /23/2015 Choose system type 3/24/ /26/2015 Design plans 3/21/ /28/2015 Cost analysis 3/28/ /04/2015 Collection methods 4/04/ /11/2015 Purchase materials 4/11/ /04/2015 Begin assembly 4/25/ /25/2015

Sediment Sample Collection

Two samples were taken from four locations. (North, South, East, and West sections of pond)

Initial purchases include a pair of waders, and collection containers (1 quart).

The samples will be allowed to settle for a few days, and I will begin removing the water.