1 W-band Module Production and Other Fermilab Contributions Proposed Significant Partnership in QUIET-II to the Fermilab PAC in November 2009 Modest Fermilab.

Slides:



Advertisements
Similar presentations
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advertisements

Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
Effective Methods for Software and Systems Integration
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
From Research Prototype to Production
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
US CMS/D0/CDF Jet/Met Workshop – Jan. 28, The CMS Physics Analysis Center - PAC Dan Green US CMS Program Manager Jan. 28, 2004.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
1 QUIET The Search for B-Mode Polarization in the Cosmic Microwave Background Using Coherent HEMT Detectors A Proposed New Initiative for Fermilab April.
QUIET Experiment Rencontres de Moriond 2010 March 14 th, 2010 Akito KUSAKA (for QUIET collaboration) University of Chicago, EFI and KICP.
GBT Focal Plane Array Development Program Steven White Program Manager.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Natick Public Schools Technology Update October 6, 2008 Dennis Roche, CISA Director of Technology.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
CERN-IT Oracle Database Physics Services Maria Girone, IT-DB 13 December 2004.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
HEPiX 2 nd Nov 2000 Alan Silverman Proposal to form a Large Cluster SIG Alan Silverman 2 nd Nov 2000 HEPiX – Jefferson Lab.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
1 Our Proposed Involvement in QUIET Phase II Assembly of ~1500 W-band Polarization Analyzer Modules ~ 2 year production run Collaborative effort with Caltech.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
1 Injecting W-band power (from Gunn oscillator) into QUIET receiver module KEK and Fermilab Collaborating at Lab 3 Status of QUIET-II at Fermilab Fritz.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
K-Band Focal Plane Array Steven White Program Manager.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
1 CF lab review ; September 16-19, 2013, H.Weerts Budget and Activity Summary Slides with budget numbers and FTE summaries/activity for FY14 through FY16.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
UK RFD Pre-Series cryomodule
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: MREFC Budget Summary Victor L
GLAST Large Area Telescope
NSS integrated installation plan workshop Introduction
Preliminary Project Execution Plan
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

1 W-band Module Production and Other Fermilab Contributions Proposed Significant Partnership in QUIET-II to the Fermilab PAC in November 2009 Modest Fermilab involvement in QUIET-I Hardware Calibration Tools 3 trips to CIT/JPL to study modules Shifts in Chile Hosted a QUIET Collaboration Meeting at Fermilab in June 09 Access to QUIET-I Data Pier Oddone, Fermilab Director DOE Field Work Proposal In Preparation

2

3 Module bias optimization using Grid Before Wire grid LN 2 receiver After KICP Lab in Chicago

4 Commissioning Detector using Rotating Sparse Wire Grid Polarizer

5 The Science Team Tooling Fabrication: J. Korienek, C. Lindenmeyer, Mechanical Assembly and Cryogenics: D. Butler, B. Gonzales, T. Hawke, W. Newby, J. Wilson System Controls: S. Hansen, J. Montes, J. Zimmerman Electrical Engineering and Testing: D. Kubik CMB Theory: S. Dodelson, A. Stebbins RF Technology: D. McGinnis Detector Fabrication: F. DeJongh, H. Nguyen The Technical and Engineering Team Significant Experience Silicon Tracking Detectors for HEP Fermi-Glast Satellite Veto Shield Dark Energy Survey Camera

6 Our Proposed Involvement in QUIET Phase II Assembly of ~1500 W-band Polarization Analyzer Modules ~ 2 year production run Collaborative effort with Caltech and JPL Precision Placement of 106 components Components as small as 200  m x 200  m Very delicate HEMT components Precision control of silver epoxy die bonding Over 200 wirebonds per module Harsh Cryogenic and Vacuum Environment Technical Challenges

7 Upgrade Machines with powerful Labview and Vision System Software Meeting the Production Goals Utilize 4 Coordinate Measurement Machines to Perform Automated Assembly Strong interests from ATLAS and CMS in using automated assembly tools at Fermilab for the LHC silicon detector upgrades A natural synergy between QUIET and Fermilab/HEP Work to be performed at the Fermilab Sidet Facility

8 Differences between Phase I and Phase II Assembly and Testing Phase I Phase II Module Housing Machining at JPL Module Housing Machining by Vendor using new technique Die Bonding by NxGen New Die Bonding Technique developed at Fermilab Manual Conductor Bonding at JPL Automatic Conductor Bonding at Fermilab - Quality Assurance of Conductor Bonding Mechanical Strength - Quality Assurance of Epoxy Bonding Mechanical Strength Comprehensive Testing of Module Power Draw and RF response - at 20K and Room T Comprehensive Testing of Power Draw at Room T Comprehensive Testing of RF Response at Room T Comprehensive Thermal Cycling of Modules to 20K Sample Testing of Power Draw at 20K Sample Testing of RF Response at 20K Goal: Guarantee quality components and robust procedures in order to reduce need for comprehensive testing.

9 Micro Assembly Tools New Tools for Die Bonding Automated Wirebonding Machines at Sidet Facility Will perform R&D of bonding mechanical strength in vacuum and cryogenic environment: R&D to Guarantee High Assembly Yield Reduces Need for Extensive Cryogenic Production Testing.

10 Quality Assurance is Critical Epoxy Lap Shear Strength Measurements and Thermal Cycling down to 28 Kelvin “Instron” Measurement of Die Bonding Adhesion of Epotek H20F Silver Epoxy Expected breaking point Manufacturer’s data on cold-temp degradation does not exist. Epotek is interested in our thermal-cycling result !

11 Quality Assurance is Critical Al-Au Wirebond Strength Measurements and Thermal Cycling to 28 Kelvin

12

13 Module Assembly and Receiver Integration Schedule Q1 Tooling Development Module Housing and Non-InP Parts Fabrication Assembly and Testing of 1st 500 Modules Assembly and Testing of 2nd 500 Modules Assembly and Testing of 3rd 500 Modules Fabrication and Delivery of InP Parts from CIT/JPL Integration of 1st Receiver and deployment Fermilab CIT/JPL Chicago-Fermilab Integration of 2nd Receiver and deployment Integration of 3rd Receiver and deployment KEK/Princeton Q2Q3Q Q1Q2Q3Q Q1Q2Q3Q Q1Q2Q3Q Responsibility

14 Major Subsystem Costs W-Band Module Production and Testing: Caltech, JPL, Fermilab Component Delivery Date NSF Cost DOE Cost DOE Contingency. Module Housing/Parts K - - Tooling Materials K 28K Tooling Fabrication and Controls Programming K 31K Production Labor to K 59K Testing Labor “ - 594K 148K Total 466K 1074K 266K W-band Receiver Integration: Chicago, Fermilab Component Delivery Date NSF Cost DOE Cost DOE Contingency Materials to K 10K Technician Labor “ - 80K 20K Engineering Labor “ - 94K 24K Total - 225K 54K

15 Summary Project Construction Tasks Delivery of 1500 W-band modules in ~2 year production run Integration and commissioning of 1 Receiver at Fermilab Calibration tools and window engineering analysis Request to Fermilab/DOE: Project Cost = $ 1.75M (includes contingency) Operations Cost = $ 224K Technical and Engineering Labor (no Scientist Labor) Production tooling material costs Contribution to Chile site operations cost Funds for Travel to Chile for Shifts and Installation All overheads have been included

16 Hogan’s Backup Slides

17

18