India-CMS Collaboration Meeting Chandigarh, 7-8 Oct 2004 Report to the Collaboration A. Gurtu.

Slides:



Advertisements
Similar presentations
Silicon Preshower for the CMS: BARC Participation
Advertisements

CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Release & Deployment ITIL Version 3
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
 Read out strips production : We will provide 200 strips (100 RE4/2 and 100 RE4/3) Contract with Beijing Gaonengkedi Co. signed on 10-Aug., 3 RE4/2 and.
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 HO Upgrade: QC and Production Preparation in India Shashi Dugad India-CMS Meeting, BARC 30 July 2010.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Fermilab Annual DOE Program Review May 16-18, 2005 JF1 CMS M&O at FNAL Jim Freeman US CMS M&O Manager May 17, 2006.
Status of HO Installation and Commissioning Shashikant Dugad (DHEP, TIFR) India-CMS Meeting BARC, July 2007.
Status of LHC, CMS & India in CMS A. Gurtu Tata Institute of Fundamental Research, Mumbai.
India CERN Meeting, BARC, 28/02/11
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
HCAL DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova for the HCAL DPG October 20, 2011.
Grid Security Vulnerability Group Linda Cornwall, GDB, CERN 7 th September 2005
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1FJPPL-07 1 st Workshop FJPPL ’ 07. 2FJPPL-07 This Joint Laboratory is established by the initiative of Profs. Yoji Totsuka and Michel Spiro to encourage.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Pending mechanics issues for electronics/services (updated 18/08/05 by Ana) Fixation/shielding for 2 LV PS (no fingers):  - Clermont worked out a proposal.
Andris Skuja :: January 2012 Kolkata-Mumbai Workshop Overview1 H C A L Kolkata-Mumbai HCAL Upgrade Workshop Overview of HCAL Upgrade Workshop Andris Skuja.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
DPS/ CMS RRB-T Core Software for CMS David Stickland for CMS Oct 01, RRB l The Core-Software and Computing was not part of the detector MoU l.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
L. M. Pant1 RE Workshop, 19/11/12 Validation of RE4 Cu cooling systems for mass production Validation of RE4 Cu cooling systems for mass production L.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
SDHCAL-GRPC Review I.LAKTINEH For the SDHCAL-GRPC groups.
VELO Replacement Girish Patel University of Liverpool.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
The European DHCAL status
KEK news ( ) S.Tanaka.
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
The SABRE Crystals Frank Calaprice.
India in ILC-detector R&D in
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

India-CMS Collaboration Meeting Chandigarh, 7-8 Oct 2004 Report to the Collaboration A. Gurtu

Status of hardware HO installation progress To do: repair of honeycomb panels by mechanical method, using screws and nuts. Need specialized nuts, special tools to be able to position the nuts deep within the panel, up to a depth of 2 m. After the repair is complete, to then insert the 6 trays and pack up in the wooden boxes for later installation inside the CMS detector. 26 th August Sudhakar and Joshi went to CERN. 1 st Sept rest of team (Birje, Kalmani, Harinder -later) joined them and they have been carrying out the repairs/insertions.

HO repair – contd. Repair procedures validated using pressure application from inside the panel Situation on 3 rd October: - 22 panels are repaired and trays inserted - 5 panels are repaired and awaiting tray insertion Total no. of panels = 72. EXPECT WORK TO BE COMPLETED BY MID-NOVEMBER OR SO.

HO installation schedule Order of installation: R+2, +1, 0, -1, -2 R+2, +1 supposed to be installed by end-2004 R0 (2 layers) and R-1, R-2 only in All cabling work would be done in cables made and carried to CERN for validation of lengths etc. To be done.

Progress in Si-PSD Last meeting: some discrepancies between DU and BARC analyses of detector data. 3-member committee set up to resolve this. It is somewhat delayed, but is being looked into now, with exactly the same data being at both DU and BARC. Hope to resolve soon. More detectors being tested at BEL. Anita Topkar is at CERN now for detector mounting expertise to be set up at BEL.

Project Extension and GRID Project extension Has been passed by DAE. Includes PU and DU requests for and new entrant Visva-Bharati University. For DST responsibility letter has been written to DST Secretary (copy to Asthana). India-GRID proposal envisaging Tier-2 centers at TIFR (India-CMS) and SINP/VECC (India-ALICE) and Tier-3 centers at other India-CMS/India-ALICE institutions has been submitted to Member, Finance in DAE by Joint Secretary (R&D). Awaiting approval.

Future steps – what and how ? For 3 groups (2 in TIFR, PU) hardware fabrication in India is (almost) completed – optical cables remain. For DU and BARC also, things are on track % detectors still to be completed by BEL, and tested by DU/BARC. Mounting of detectors on ceramic and aluminum plates remains. This will be done at BEL, with quality control by DU/BARC (as for detectors). Anita Topkar at CERN for getting this mounting expertise.

Future Plans HO related: Installation, cabling, DAQ expertise, HO-RPC combined trigger test, SLICE test, ….. Test beam analyses, future test beams – Other …. Si-Preshower related: Production, testing of remaining detectors, mounting of all on ceramic, aluminum plates. Test beams ? In Participation in other tests ?

Future Plans -2 BARC (NPD) and Visva-Bharati: 2 new groups Their plans for hardware related activity ? Either new hardware (HI related ?) or as part of test-beam efforts of existing HO or Si-PSD ? Also in software and physics simulation. Question: how best to plan Indian activity to ensure maximum IMPACT in CMS. On what activities to collaborate among ourselves ? How to go about it ? Deputations to CERN for all these activities. Refresh our thinking of the guidelines for 2005 and beyond. Staff member discussion.