BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.

Slides:



Advertisements
Similar presentations
Project Cost Management Chapter 7
Advertisements

Budget Management (PERT Method & Contingency). Estimates “Trying to predict the future is like trying to drive down a country road at night with no lights.
BSBPMG508A Manage Project Risk 11.3 Perform Qualitative Risk Analysis Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Project Time Management
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
BSBPMG501A Manage Project Integrative Processes 4.3 Direct and Manage Project Execution This is the process of performing the work defined in the project.
What is Project Cost Management?
Project Cost Management
The Project Management Body of Knowledge (PMBOK)
6-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 6 Estimating Project,
4.2 Develop Project Management Plan
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
BSBPMG407A Apply Risk Management Techniques 1 Apply Risk Management Techniques Project Risk Processes Part 2 C ertificate IV in Project Management
Click on Next to continue Introductio n Inputs Tools and Techniques Outputs Next 12.2 Conduct Procurements: Introduction The process of obtaining seller.
BSBPMG508A Manage Project Risk 11.4 Perform Quantitative Risk Analysis Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 5 AND 6: PROJECT PLANNING – TIME AND COST PLANNING AND MANAGEMENT.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
BSBPMG502A Manage Project Scope 5.3 Create Work Breakdown Structure The process of sub dividing project deliverables and project work into smaller, more.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
BSBPMG403A Apply Cost Management Techniques Apply Project Cost Management Techniques Project Cost Processes C ertificate IV in Project Management
Software Project Management (SPM)
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Quality Assurance vs Quality Control
BSBPMG501A Manage Project Integrative Processes 4.4 Monitor and Control Project Work The process of tracking, reviewing and regulating the progress made.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
11.1 Plan Risk Management The process of defining how to conduct risk management activities for a project Detailed risk planning enhances the overall probability.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
Management & Development of Complex Projects Course Code - 706
BSBPMG505A Manage Project Quality 8.1 Plan Quality Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of identifying.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Project Time Processes – Introduction and Part 1 C ertificate IV in Project.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 1 C ertificate IV in Project Management
BSBPMG504A Manage Project Costs 7.2 Determine Budget Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of aggregating.
BSBPMG508A Manage Project Risk Manage Project Risk Project Risk Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Agenda Interthink – 2003 Organizational Project Management Baseline Study –Industry Profile –Country Profile –Organization Size –Data On Schedule –Data.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
BSBPMG504A Manage Project Costs Manage Project Costs Project Cost Processes Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG504A.
BSBPMG504A Manage Project Costs 7.3 Control Costs The process of monitoring the status of project expenditure Involves updating the project budget with.
BSBPMG503A Manage Project Time 6.4 Estimate Activity Duration The process of approximating the number of work periods needed to complete individual activities.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
11.2 Identify Risks The process of determining which risks may affect the project and documenting their characteristics This is an interactive process.
BSBPMG503A Manage Project Time 6.3 Estimate Activity Resources The process of estimating the type and quantities of material, people, equipment or supplies.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
BSBPMG407A Apply Risk Management Techniques Apply Risk Management Techniques Project Risk Processes Part 2 C ertificate IV in Project Management
4.5 Perform Integrated Change Control
BSBPMG502A Manage Project Scope 5.1 Collect Requirements The process of defining and documenting the needs of stakeholders Encompasses the requirements.
BSBPMG508A Manage Project Risk 11.6 Monitor and Control Risks Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
12.1 Plan Procurement: Introduction
SOFTWARE PROJECT MANAGEMENT
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit.
1 Estimating. 2 Cost Management According to the PMBOK ® Guide, Project Cost Management knowledge area includes the processes involved in planning, estimating,
Project Cost Management
7.4 Control Costs The process of monitoring the status of the project costs and managing changes to the cost baseline. Involves updating the project budget.
CHAPTER:7 Project Cost Management
Plan Schedule Management
7.3 Determine Budget The process of aggregating the estimated costs of individual activities or work packages in order to establish an authorised cost.
11.3 Perform Qualitative Risk Analysis
Plan Risk Management Outputs T &T Inputs Project Management Plan
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Project Cost Management
Chapter 7: Project Cost Management
CIS12-3 IT Project Management
What is Project Cost Management?
Project Time Management
Presentation transcript:

BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing an approximation of the monetary resources needed to complete project activities Cost estimates are a prediction based on the information known at any point in time Includes the identification and consideration of costing alternatives to initiate and complete the project Cost trade offs and risks need to be considered Occurs during Planning

BSBPMG504A Manage Project Costs 7.1 Estimate Costs Inputs to Estimate Costs Scope Baseline Cost Management policies and procedures Project Schedule Human Resource Plan Risk Register Tools and techniques to Estimate Costs Adapted from PMBOK 4 th Edition Reserve Analysis Expert Judgement Analogous Estimating Parametric Estimating Software Three-point Estimates Bottom-up Estimating Vendor Bid Analysis

BSBPMG504A Manage Project Costs 7.1 Estimate Costs Analogous Estimating Uses previous similar projects to estimate costs Least costly and least time consuming, also least accurate Accuracy improved when combined with Expert Judgement Most common form of cost estimation Parametric Estimating Uses statistical relationships between historical project data and variables for estimation of time and costs Some industries publish estimating tables, prominent in the construction and engineering industries Standard cost estimates for activities InitiationPlanning ExecutionClose Monitor Control Adapted from PMBOK 4 th Edition

BSBPMG504A Manage Project Costs 7.1 Estimate Costs Bottom-up Estimating Starts with the cost of individual activities or work packages and builds a bottom up estimate Detailed costs are rolled up to provide the overall budget Accuracy is influence by the size and complexity of the project Three-Point Estimates - PERT Calculates the Expected activity cost based on the weighted average of the Most Likely, Optimistic and Pessimistic estimates Often more accurate than other methods and quantifies the range of uncertainty InitiationPlanning ExecutionClose Monitor Control Adapted from PMBOK 4 th Edition

BSBPMG504A Manage Project Costs 7.1 Estimate Costs Reserve Analysis Inclusion of contingency Can be calculated for each activity Can be calculated for entire project Often a percentage based on risk or complexity Cost of Quality Estimates cost of quality control and quality assurance activities Enables tracking of these costs More in Project Quality unit InitiationPlanning ExecutionClose Monitor Control Adapted from PMBOK 4 th Edition

BSBPMG504A Manage Project Costs 7.1 Estimate Costs Project Management Estimating Software Cost estimating applications, spreadsheets and tools Becoming widely accepted Vendor Bid Analysis Looks at estimates made by vendors for components of the project Normally only one component of project cost and other methods required to estimate other activities to provide the total cost More in Procurement Unit InitiationPlanning ExecutionClose Monitor Control Adapted from PMBOK 4 th Edition

BSBPMG504A Manage Project Costs 7.1 Estimate Costs Outputs of this process include – Activity Cost Estimates –Quantitative assessments of the probably cost of the project work Basis of Estimates –Information supporting the cost estimates –Assumptions and Constraints –Range of possible estimates –Level of confidence in estimates –Recommendations for contingency amounts Project Document Updates –Most particularly updates to the Risk Register and Risk Management Plan Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control

BSBPMG504A Manage Project Costs 7.1 Estimate Costs Cost estimates often include some form of range of possible results Most common form of range is plus or minus - e.g. $10,000 +/- $500 – the activity could cost between $9,500 and $10,500 $10,000 +/- 20% - the activity could cost between $8,000 and $12,000 Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control