Maintenance Specifications For Jan. 2014 and beyond.

Slides:



Advertisements
Similar presentations
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Advertisements

Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Welcome to WebCRD.
Contractor Desktop Electronic Bid System Training.
Home This training presentation is designed to introduce the Residency Management Suite to new users. This presentation covers the following topics: Login.
FAMIS TRAINING The Basics. Basic FAMIS Training (Logging on & off, & basic screens.)  Before beginning this training you must request your user id and.
OneOffice is the basis of recording and documenting all pay quantities. Pay quantities may be entered directly into OneOffice or transferred from other.
Web Store Training. Table of Contents Sign In : Accessing the site My Profile : Managing your account Catalog Navigation : Finding items and ordering.
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Division of Housing & Community Development
Step by Step Process. Checklist and Form Instructions A checklist is provided on the website to help applicants track their progress in completing the.
Gateway Program Go to along the left side, in the third section, click on The Gateway.
Reference Guide Module 5: Billing November 2014 Reference Guide Module 5: Billing November 2014.
OneOffice has provisions to add Pay Items for modifications to the Contract by Supplemental Agreements, Change Orders and for work covered by Standard.
Page 1 of 21 This module will describe the procedure for a Metis Bid Request and how to upload the Metis supporting documentation. Welcome To the ETS –
PRE-QUALIFICATION AND BID ENTRY WEB APPLICATIONS CONTRACTS ADMINISTRATION Presenters: Juanita Moore Leila Griffin September 9, 2003.
EProcurement Job Aid Requisitions & Receipts. Table of Contents Creating a Requisition Define Requisition Vendor.
TAXABLE CIGARETTE WHOLESALE DEALER’S REPORT (Taxable CWD)
Welcome to State of Michigan Central Finance Expense Entered for Employee Tutorial Brought to you by the Office of Financial Management.
NITAAC Customer Support Phone: Website: NITAAC.nih.gov Customer Guide for using the electronic Government.
Entering a Purchase Request Draft Departmental User Instructions June 2014.
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
MEGS+ Michigan Electronic Grants System Plus Office of Special Education May 2012.
TIMS LOGIN AND APPLICATION INFORMATION Spring
1 Los Angeles Unified School District Facilities Services Division Facilities Contract Services/ Facilities Construction Contracts Contract Closeout Application.
Automated OUTLAY REPORT. The is an Excel spreadsheet which is used to track all funds related to the project, from beginning to end.
MyFloridaMarketPlace MyFloridaMarketPlace Icons Job Aid Revised Date: 12/17/03.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
NetLink II User Guide PCO Module 1. 1.Name and access level 2.The “Red Bar” 3.Project Modules 4.Project search options 5.Search entry field 6.Timeout.
ENTERING ELIGIBLE ENERGY RESOURCE APPLICATIONS IN DELAFILE Version 2.0 August 25, 2015.
Principal’s Per Session Application Screen Shots
Allen Hughes State Materials Office
How to Use the Gateway Budgets Application in 2014 Ryan Burke Program Coordinator 1.
Transaction Fee Reporting System User Guide for State Term Contract and State Purchasing Agreement Vendors.
Family Resource Centers in ePlan August 2015 Adding a Budget in ePlan.
OPAC Training aid (Library solutions & Library world)
In-state Cigarette Importer’s Report. Log in with the User Id and Password provided through the EDS registration process and click on the Login button.
CREATING TEMPLATES CREATING CUSTOM CHARACTERS IMPORTING BATCH DATA SAVING DATA & TEMPLATES CREATING SERIES DATA PRINTING THE DATA.
Home NEW INNOVATIONS Resident/Fellow Introduction NEW INNOVATIONS Resident/Fellow Introduction This presentation includes the following topics: Login Notifications.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
2015 Form 471 Step-by-Step for Filing the Form 471 Using DPI 470/RFP for Internal Connections and Managed Internal Broadband Service 1.
Page 1 Non-Payroll Cost Transfer Enhancements Last update January 24, 2008 What are the some of the new enhancements of the Non-Payroll Cost Transfer?
Cigarette Distributing Agent’s Report. Log in with the user id and password provided through the EDS registration process and click on the Login button.
1 Los Angeles Unified School District Facilities Services Division Facilities Contract Services/ Facilities Construction Contracts LAUSD Contracts Application.
Ceridian Time Solutions Hourly/Non-Exempt & (Non- Contracted) Per Diems Key Entry.
Vendor’s Malt Manufacturing Return. Log in with the user id and password provided through the EDS registration process and click on the Login button.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Hubnet Training One Health Network South East Asia Network Overview | Public and Members-only Pages; Communicating and Publishing using Blogs and News.
New FY2016 Form 470 Application Lorrie Germann, State E-Rate Coordinator.
2016 Filing a Form 470 For C1 Using ITS as the Secondary Billed Entity Step-by-Step for Creating and Submitting your 470 Application in the EPC Portal.
ELISTING How to use eListing to conveniently and quickly file your personal property listing online. DEPARTMENT OF ASSESSMENTS King County To navigate.
This is the Home Page, enter your username and password.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
ORACLE TRAINING iPROCUREMENT
2017 Filing a Form 470 For Voice Step-by-Step for Creating and Submitting Your 470 Application in Your EPC Portal.
NOODLETOOLS SIGN-IN Student ID #
To the ETS – Metis Bid Request Online Training Course
The Voluntary Pre-K Application in ePlan
Construction Oversight
A Step by Step Tutorial This PowerPoint presentation is intended to show eDMR users how to login and use the eDMR system.
Web address to access School of Medicine Applications:
SUBMITTING A PAYMENT REQUEST FORM
PO INVOICE ENTRY Creating a PO Invoice Let’s Get Started
Welcome to the Cox Machine VIP Portal! cmivendorportal.com
Completing the State Aid Payment Request
New MyFD JV Feature Demo Webcast August 1, 2018
AmeriCorps Member Tutorial – OnCorps Reports 2.0, Standard Reports
To the ETS – Metis Bid Request Online Training Course
SOP 3: Submit New User Request
APAC eQuote
Presentation transcript:

Maintenance Specifications For Jan and beyond

What’s going on? Changes in format and naming convention for Maintenance Specifications Maintenance Special Provisions are now Modified Special Provisions Putting the specifications package together How do I do that? Goal: To provide a better understanding of the changes to Maintenance specifications and how it impacts the preparation of Maintenance specifications packages.

Current Hierarchy of Specifications Documents: ConstructionMaintenance Modified Special ProvisionMaintenance Special Provision Standard Maintenance Special ProvisionSpecial ProvisionTechnical Special ProvisionDevelopmental SpecificationSupplemental SpecificationStandard Specifications

Proposed Hierarchy of Specifications Documents: ConstructionMaintenance Modified Special Provision (MSP)Maintenance Special Provision MSP Standard Maintenance Special ProvisionSpecial ProvisionTechnical Special ProvisionDevelopmental Specification Supplemental Specification (Construction)Supplemental Specification (Maintenance)Standard Specifications

Proposed Governing Order of Documents ConstructionMaintenance Special Provisions* Technical Special Provisions Plans Design Standards Developmental Specifications Supplemental Specifications* Standard Specifications * The terminology for Special Provision and Supplemental Specifications is the same for both Construction and Maintenance as they are equivalent. The specification files will be separate in Spec on the Web and specific to either Construction or Maintenance. The web site will contain separate pages with separate workbooks for Construction and Maintenance 5-2 Coordination of Contract Documents

This crosswalk shows the changes to the Maintenance Specifications beginning January 2014.

Modified Special Provisions (MSP) are: Changes to Special Provisions, Supplemental Specifications or Standard Specifications. A Modified Special Provision Request form including a redline version of the proposed spec change is completed and submitted by the District and approved by Central Office for use on a specific project. MSP used repeatedly by a District may be approved as Blanket MSP and will be input into Specs on the Web. Once approved by Central Office, Blanket MSP do not have to be approved by Central Office for each repeated use as long as the MSP has not been modified and the usage note is complied with.

MODIFIED SPECIAL PROVISION APPROVAL REQUEST (REV ) Date: Enter the today’s date.District: 1 Type: Project Specific Letting Month: 1/14 FPID Number: Requested by: Enter the name of the requestor. Office/Phone: Enter a phone number. Specification being modified: Enter the spec file name. Affected Pay Items: Enter the affected pay items. *Expected Cost Impact to this project: Enter the cost impact to the project. Give an estimate of dollar impact (added cost or cost savings) to the project if this Modified Special Provision is used in lieu of the corresponding statewide implemented specification. Project Description: N/A Background Data: Enter detailed background information (i.e., why is the spec change needed, project information, etc.). *Name and PE Number of PE signing and sealing the Modified Special Provision: Project Specific Modifications to the Standard Specifications or Workbook Specifications must be signed and sealed by the Professional Engineer responsible for this Special Provision under the following statement and kept in the Project Files maintained in the District. PE Name: PE Name. PE Number: PE Number. I hereby certify that this Specification was prepared under my responsible charge, and that it has been reviewed in accordance with procedures adopted and implemented by the Florida Department of Transportation. INSERT REDLINED/STRIKE-THROUGH DOCUMENT HERE.

When approved, project specific MSPs are signed and sealed by the professional engineer for the project. The document must be kept on file by the District. The MSP is then inserted into the specifications package (Word document) merged from Specs on the Web. When blanket MSPs (recurring MSPs) are approved, they are signed and sealed by the professional engineer and the document must be kept on file by the District. Central Office will load the blanket MSP into Specs on the Web for use by the District.

PROPOSAL REQUIREMENTS AND CONDITIONS – PREQUALIFICATION OF BIDDERS. (REV ) (1-14) ARTICLE 2-1 is deleted and the following substituted: 2-1 Contractor Experience. The Department does not require a Contractor to have a certificate of qualification if bidding Maintenance contracts. Maintenance contracts may require potential bidders to have and document certain experience in the type of work required for the contract. If this requirement is applicable to a contract, detailed experience requirements will be listed in the advertisement and a form will be included with the bid package to document such experience. The form must be fully and accurately completed by the potential bidder and received by the Department before or at the opening of the bids. A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit the following: a. A bid on a contract to provide any goods or services to a public entity. b. A bid on a contract with a public entity for the construction or repair of a public building or public work. c. Bids on leases of real property to a public entity. A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section F.S., for Category Two. All restrictions apply for a period of 36 months from the date of placement on the convicted vendor list. PROPOSAL REQUIREMENTS AND CONDITIONS (REV ) (01-14) SUBARTICLE (page 12of the Standard Specifications for Road and Bridge Construction) is deleted and replaced by the following: This contract is for an indefinite quantity whereby the Contractor agrees to furnish the services and perform the work required under this Contract, pursuant to separately issued Work Documents, on an as needed basis, at the Contract unit prices, during the 365 calendar day term of this Contract, or such extended or renewed term as may be later established pursuant to the terms of the Contract. The Department does not guarantee that any specific quantity of work or services will be requested under the Contract, all of which are subject to and contingent upon need as determined by the Department and the availability of funds, budgetary restrictions, and legislative appropriations. The total of all Work Documents is limited to $50, unless the Contract is amended by Supplemental Agreement. AWARD AND EXECUTION OF CONTRACT. (REV ) (FA ) (1-14) ARTICLE 3-1 (Page 16) The first paragraph is expanded by the following: In the event of any discrepancy in the three entries for the price for any item, the Department will evaluate the bid based on the unit price as shown in words unless the extension and the unit price shown in figures are in agreement with each other, in which case, the Department will evaluate the bid based on the amounts in agreement over the unit price shown in words. Insert the Modified Special Provision into the specifications package in order by Section, Article and Subarticle.

SPECS ON THE WEB The tool we use to create the specifications package.

Specs on the Web Enter your FDOT User ID and your Mainframe Password in the two fields on the Log-In screen.

The Home page –

 In the central portion of this page is “Preview a Workbook!”.  Using the dropdown fields, select the 1) Letting Date, 2) your District ID, and 3) Maintenance Contract Type Click the Blue “Go!” A list of the specifications available for the letting date input appears on the screen for browsing.

Workbook Preview The first column is the specification file name. The second column is for browsing the spec. When you click on “Browse”, the file opens for reading or saving to your computer. The third column is the Description of the spec, the last revision date and the date the spec is implemented. The forth column is the Usage Note giving guidance on the use of the specification.

Begin a Specification Package Click on “Create a Package” in the menu column to the left of the page. Enter the name(s) of the persons preparing the package. Enter the financial project number. Select the Contract Type “Maintenance”. Select the Spec Book Year. Federal Funding, Multiple FPN, Reissued, and Manual Signature are all yes or no check boxes. Using the drop downs, select the Letting Date (month and year), the District, and the County. Click “Start Package”.

You may print the selection screens for review from the options at the top of the page. Using the check boxes to the left of the file names in the Select column, click to select the specs desired in the specifications package. Be sure to include the Section Heading pages for Special Provisions and Supplemental Specifications. (When needed, select the Developmental Specifications, Appendix and TSP heading pages.) When all files desired have been selected, click Merge Specifications from the menu area on the left side of the screen.

When the dialogue box appears, choose “Save as” to save the document in Word to the location desired on your computer or server. When the merged document has been saved, click “Open” from the pop up at the bottom of your screen.

The cover page for the package contains the information input on the Specification Detail screen. The Signature and Seal statement applies only to the preparation of the package. The Signature and Seal block should be completed in full. If a FDOT Engineer will be signing and sealing the package, the Certificate of Authorization will be N/A.

To create the Table of Contents, right click on the test below that appears on the second page of the document.

For more information or help, please contact the State Specifications Office. Ray Haverty Frances Thomas