VERSUS2 – A new priority project for verification Pj Leader – Angela Celozzi.

Slides:



Advertisements
Similar presentations
Ensemble activities in COSMO C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
Advertisements

Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
Development and Quality Plans
Development plan and quality plan for your Project
Verification Precipitation verification (overestimation): a common view of the behaviour of the LM, aLMo and LAMI Francis Schubiger and Pirmin Kaufmann,
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
COTEKINO Priority Project COSMO WG7 Chiara Marsigli.
12° COSMO General Meeting – Moscow Sept 2010 VERSUS2 Priority Project Report Adriano Raspanti.
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
Common Activities Activities and Tasks in the WBS.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific.
A.Montani; Eurorisk-Preview COSMO meeting, Zurich, September 2005 PREVIEW in some words (PREVention, Information and Early Warning) A project funded.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss News from COSMO COSMO User Workshop 2010.
9° General Meeting Adriano Raspanti - WG5. 9° General MeetingAthens September Future plans CV-VerSUS project future plans COSI “The Score” new package.
Project Life Cycle.
Project Presentation eProcurement System. M.TECH S16- Team S03 Institute of Systems Science Table of Content Project Background Project Requirement User.
11° COSMO General Meeting – Offenbach Sept 2009 VERSUS2 Priority Project Report.
COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
© Mahindra Satyam 2009 Configuration Management QMS Training.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss PP VERSUS2 Status Report VERSUS Meeting 04/03/2010, Langen.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Suggested Projects for the.
Latest results in verification over Poland Katarzyna Starosta, Joanna Linkowska Institute of Meteorology and Water Management, Warsaw 9th COSMO General.
The latest results of verification over Poland Katarzyna Starosta Joanna Linkowska COSMO General Meeting, Cracow September 2008 Institute of Meteorology.
Project Methodology May 2, System Development Life Cycle Overview.
COTEKINO Priority Project COSMO WG7 Chiara Marsigli.
Software Life Cycle The software life cycle is the sequence of activities that occur during software development and maintenance.
Advanced interpretation and verification of very high resolution models National Meteorological Administration Rodica Dumitrache, Aurelia LUPASCU,
WG 6 and Support Activities Plans for the next Year.
COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache, Bogdan Maco National Meteorological Administration of Romania.
T Project Review RoadRunners [IM3] Iteration
10° General Meeting Adriano Raspanti - WG5 – VERSUS PL.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
Overview of WG5 future activities Adriano Raspanti Zurich, September 2005.
Activities of the new WG7 Chiara Marsigli. WP Development of COSMO-LEPS Maintenance and updates of the operational suite at ECMWF (A. Montani) Study,
Short Range Ensemble Prediction System Verification over Greece Petroula Louka, Flora Gofa Hellenic National Meteorological Service.
Science plan S2S sub-project on verification. Objectives Recommend verification metrics and datasets for assessing forecast quality of S2S forecasts Provide.
Overview of WG5 activities and Conditional Verification Project Adriano Raspanti - WG5 Bucharest, September 2006.
VERIFICATION Highligths by WG5. 2 Outlook Some focus on Temperature with common plots and Conditional Verification Some Fuzzy verification Long trends.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
Deutscher Wetterdienst FE VERSUS 2 Priority Project Meeting Langen Use of Feedback Files for Verification at DWD Ulrich Pflüger Deutscher.
© Crown copyright Met Office EUMETNET- SRNWP verification programme -Met Office Responsible member Clive Wilson – Project manager 31st EWGLAM/16th SRNWP.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE: IMGW in COSMO AUTHOR: Michał Ziemiański DATA:
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache National Meteorological Administration of Romania.
New task within PT Support Activities “Support of COSMO licensees”
Report from the Scientific Project Manager
Testing Process Roman Yagodka ISS Test Leader.
Summary of WG6 activities
PT Evaluation of the Dycore Parallel Phase (EDP2)
PP INSPECT report Dmitry Alferov (1), Elena Astakhova (1), Petra Baumann (4), Dimitra Boukouvala (2), Anastasia Bundel (1), Ulrich Damrath (3), Pierre.
COSMO Priority Project ”Quantitative Precipitation Forecasts”
9/18/2018 Department of Software Engineering and IT Engineering
Weather Type Dependant
Workshop Results WG5 COSMO General Meeting
COSMO General Meeting 2009 WG5 Parallel Session 7 September 2009
20th COSMO General Meeting, 3-7 September 2018, St. Petersburg, Russia
Report of the Scientific Project Manager 6th COSMO General Meeting
COSMO-LEPS Verification
Delivery of Solutions Information Management
David Palella, Filodea Pastorelli
WG3b Activities A proposal
Christoph Gebhardt, Zied Ben Bouallègue, Michael Buchhold
X-DIS/XBRL Phase 2 Kick-Off
Selected Priority Projects
Plans in Romania Dr. I.V.PESCARU.
Guidelines for future developments Tiziana Paccagnella, ARPA-SIM
Short Range Ensemble Prediction System Verification over Greece
PP CARMA Common Area with Rfdbk/MEC Application
Presentation transcript:

VERSUS2 – A new priority project for verification Pj Leader – Angela Celozzi

VERSUS2 – WHY? OPEN POINTS: VERSUS has not been planned to cover all the existing verification methods, as well as all the possible products from a NWP and not all types of observation implementation of probabilistic and ensemble forecasts verification; implementation of obj-based and fuzzy verification methods applied to precipitation; New scores for extreme events (e.g. extreme dependency score); Statistical features like Confidence intervals and Bootstrap method; Use of non conventional obs (e.g. radar, satellite, raingauges) and gridded observations (precipitation analysis); and so on-----  VERSUS2!!!

VERSUS2 – Phases and tasks PHASE 1: COSMO year 2009 Task 0: Requirements specification for VERSUS and accepted review Main Activities (or subtasks) Preparation of a “forum” and start of a survey (1,5 months to collect requirements) Survey analysis (1,5 months to gather, organise and edit requirements: delivery of System Design Overview (SDO)) Review of System Design Overview (0,5 months) Drawing up the project (3 months for delivery of a detailed System Architecture Design (SAD), Final acceptance of the System Design Overview and SAD (0,5 months) Deliverables Until : Requirements specification document compiled, reviewed, and approved by the STC. Estimated resources 0,4 FTEs for PL and PL team 0,9 FTEs (total amount) for all the other members

VERSUS2 – Phases and tasks PHASE 1: COSMO year 2009 Task 1a: Implementation of a multiplatform RDBMS version of VERSUS The development of a multiplatform DB for VERSUS is necessary for the installation and use of VERSUS at every service within COSMO. A multiplatform DB shall be provided by means of an interface class which will be set up during the installation of VERSUS. Main Activities Analysis, design, development, and implementation of DB classes; GUI, R package and front-end integration with the above DB classes Test phase Deliverables Until : Multiplatform DB version of VERSUS available for installation. Estimated resources 0,3 FTEs Expected Start: February 2009 (just after the workshop/tutorial for delivery of the initial VERSUS version, ex CV-package, to be held Dec 2008-Jan 2009)

VERSUS2 – Phases and tasks PHASE 1: COSMO year 2009 Task 1b: Installation of multiplatform DB version of VERSUS at every service within COSMO The installation and the use at every service should be reached before the implementation of the any other requirements and functionalities from phase 2. Main Activities Installation and use of VERSUS package original version at every service within COSMO Functionality tests, configuration and production of verification scores Installation of updated multiplatform DB version of VERSUS at every service within COSMO Help Desk by PL team

VERSUS2 – Phases and tasks PHASE 1: COSMO year 2009 Task 1b: Installation of multiplatform DB version of VERSUS at every service within COSMO Deliverables Until : Installation of multiplatform DB version of VERSUS at every service within COSMO. At GM 2009: Presentation of VERSUS-based verification results for all operational deterministic COSMO implementations. Estimated resources 0,1 FTE for every COSMO member for installation of VERSUS and (after May) the multiplatform DB version of VERSUS 0,1 FTE for every COSMO member for functionality tests, configuration and production of verification scores. 0,1 FTE for help desk activities by PL team Expected Start: February 2009 (just after the workshop/tutorial for delivery of the initial version of VERSUS, ex CV-package, to be held Dec 2008-Jan 2009)

VERSUS2 – Phases and tasks PHASE 2: COSMO year It is the actual implementation phase To be defined after the delivery of TASK0 - System Design Document

VERSUS2 – Phases and tasks PHASE 1: (tentative Contributing Scientist) Task 0: Requirements specification for VERSUS and accepted review (responsible person) USAM: Adriano Raspanti, David Palella 0,4 FTE (taking care also of collection of requirements from Arpa-SIM and Arpa Piemonte) MCH: Francis Schubiger 0,15 FTE DWD: Uli Damrath 0,15 FTE HNMS: Flora Gofa 0,15 FTE IMGW: Katarzyna Starosta 0,15 FTE NMA: Rodica Dumitrache (or Aura Lupascu) 0,15 FTE RHM: TBD 0,15 FTE Arpa-SIM: TBD Arpa-Piemonte: TBD

VERSUS2 – Phases and tasks PHASE 1: (tentative Contributing Scientist) Task 1a: Implementation of a multiplatform DB version of VERSUS USAM: David Palella 0,05 FTE DWD: TBD 0,25 FTE Task 1b: Installation of multiplatform DB version of VERSUS at every service within COSMO USAM: David Palella, Angela Celozzi 0,1 FTE ("Help Desk") MCH: Pirmin Kaufmann 0,2 FTE DWD: TBD 0,2 FTE HNMS: T. Andreadis 0,2 FTE IMGW: Joanna Linkowska 0,2 FTE NMA: Rodica Dumitrache (or Aura Lupascu) 0,2 FTE RHM: TBD 0,2 FTE