ACS 560 P ROJECT M ICROBLOG 911 Kassie M. Bowman December 6, 2011.

Slides:



Advertisements
Similar presentations
BAPA Business Advertisement / Promotion Application By Will Dombrowski Dave Ladao ACS560 Software Engineering.
Advertisements

ECE 477 Design Review Team 16 Neil Kumar, Scott Stack, Jon Roose, John Hubberts.
A UTONOMOUS T RACKING R OBOT Team 7 Victor Abreu Thomas Schreifer Brent Eisenmann Matthew Beutler Peng Xie Hisham Hassan Sponsor: ECE Department Faculty.
ERP I MPLEMENTATION P ROJECT AGA Professional Development Conference March 26, 2014.
Project Presentation-Phase 2 Requirements Elicitation Specification Validation T ERA S OFT D ISTRIBUTED M EETING S CHEDULER Team Blitzkrieg: ADITYA DHAMANKAR,
M ODELLING AND A NALYZING BASED ON AADL OSATE VERSUS STOOD Farhana Rahman, Carleton University Yu Sun, University of Ottawa.
P RESENTATION ON C OMPONENT B ASED S OFTWARE E NGINEERING Presented by: Richard Akono Burak Çamdereli Yousef Al Sharma Volkan Ozdamar Eastern Mediterranean.
CINEMA BOOKING SYSTEM BY: Toomas Kutt Fraz Tabassam Jens kaae Christensen.
O PTIMIZING LU F ACTORIZATION IN C ILK ++ Nathan Beckmann Silas Boyd-Wickizer.
S URVEILLANCE T OOLS FOR P UBLIC H EALTH D ATA AND M ESSAGE S TREAMS D AVID M ADIGAN D EPARTMENT OF S TATISTICS, I NSTITUTE OF B IOSTATISTICS, & DIMACS.
H EALING T OUCH. T EAM Michael Fore – Testing Lead Jeffrey Newton – Documentation Lead Sean Owen – Project Manager Anh Pham – iPad Lead Jeff Regan – Healing.
Strategic Directions in Real- Time & Embedded Systems Aatash Patel 18 th September, 2001.
P ROJECT C HARTER T EMPLATE V1.0. I NTRODUCTION The Project Charter establishes a partnership between the performing and requesting organizations of a.
INFORMATION RETRIEVAL VECTOR SPACE MODEL IN-DEPTH PART 2 Thomas Tiahrt, MA, PhD CSC492 – Advanced Text Analytics.
ECE 477 F INAL P RESENTATION T EAM 10  S PRING 2013 Ruiyang Lin Vipul Bhat Julia Liston Krithika Iyer.
SCEC: An NSF + USGS Research Center ShakeAlert CISN Testing Center (CTC) Development Philip Maechling Information Technology Architect Southern California.
DART P ROJECT Development & Financial Community Involvement.
CIS 895 – MSE P ROJECT Cooperative Robotics Organization Simulator (CROS) Presentation 1 on Mar 1 st, 2011 Daniel Christopher Greene 1.
CIS 895 – MSE P ROJECT KDD- Service based Numerical Entity Searcher (KSNES) Presentation 2 on March 31 st, 2009 Naga Sowjanya Karumuri 1.
FPP | 10 th December 2009 | IKARUPROJECTS DOCVIEWER.
CSE Senior Design I Superior Designs, Inc. Summer 2012 Approved Projects (for delivery December 2012) Instructor: Mike O’Dell.
A Development Process Lecture Oo13 Objectory based method.
W EB A PPLICATIONS & W EB S ERVICES DEVELOPMENT USING Z END F RAMEWORK Sayed Ahmed B. Sc. Engineering in Computer Science and Engineering M. Sc. in Computer.
A UTONOMOUS R ESCUE V EHICLE (T EAM 10) Team members: Julia Liston, Vipul Bhat, Krithika Iyer, Ruiyang Lin.
TIME MANAGEMENT Definition: Time management is a set of principles, practices, skills, tools, and systems that work together to help you get more value.
W IND T URBINE D ESIGN AND I MPLEMENTATION P HASE III P ROJECT O VERVIEW Our senior design team expanded a previous wind energy project led by Dr. Ajjarapu.
Monica Gloudemans Ekaterina Schwartz Gloudemans/Schwartz ACS 560 CMAP.
1 3n’s InstaCom™ Meeting the needs of Higher Education Ann Chamberlin Sales Director 3n (National Notification Network)
WIRELESS CONTROLLED TOXIC GAS DETECTING ROBOT Amrinder Chawla, Anurag Kadasne, Enkuang Wang, Gowtham Tamilselvan, Saurabh Pandey, Robert Brown ECE 4007.
Academic and pedagogical options in CIM laboratory CIM in universities.
P ROJECT M ANAGEMENT, PMI A PPROACH (PMP) P ROJECT I NITIATION P HASE Sayed Ahmed BSc. Eng. in CSc. & Eng. (BUET, Bangladesh) MSc. in CSc. (University.
COMP 415, Spring T ABLE OF C ONTENTS 1. Problem Formulation 2. Solution Features 3. Solution Architecture 4. Major Systems 5. Project Timeline 6.
6. Application mapping 6.1 Problem definition
PRESENTATION OUTLINE: I. P ROJECT B ACKGROUND II. A NALYSIS # 1 : BIM I MPLEMENTATION 1. W AYS T O P AY F OR BIM 2. C REATING A BIM M ODEL III. A NALYSIS.
The Regional Traffic Operations Center Project in Massachusetts: A Case Study for Incident Management Bart Cima – IBI Group for Ammar Kannan - IBI Group.
4-H A RTS -I N W ARM -U PS. Q UICK O VERVIEW 1. Day’s Schedule 2. Warm Ups 3. Activities.
Near Real-Time Verification At The Forecast Systems Laboratory: An Operational Perspective Michael P. Kay (CIRES/FSL/NOAA) Jennifer L. Mahoney (FSL/NOAA)
ACS 560 M ICROBLOG 911 P ROJECT S TATUS Kassie M. Bowman September 27, 2011.
P12022: LVAD P OWER T RANSMISSION T EST R IG Erin McNally Pedro Baez Paul Parthemore Kris Stichter.
Clay Packard, PE ITS GC Software Project Manager Florida Department of Transportation WAZE – FDOT Integration.
ACS 560 M ICROBLOG 911 P ROJECT S TATUS Kassie M. Bowman November 29, 2011.
DES509 – M AJOR D ESIGN P ROJECT By Sinead Moore.
MainConsole V V3.5 Release!! Windows Active Directory Auto Backup 3 rd Party Integration Boosting Recording Privacy Mask Edge Motion Detection Multiple.
HOME APPLIANCES CONTROL SYSTEM. INTRODUCTION With the Evolving technology, once the realm of science fiction, the Smart home – a fully automated, centrally.
BAPA Business Advertisement / Promotion Application By Will Dombrowski Dave Ladao ACS560 Software Engineering.
P ROJECT O VERVIEW Company Health Challenge Super Computer Services, Inc. Your Name.
SIMULATION AND MODELING WORKING GROUP REPORT PDS MANAGEMENT MEETING – 2016 FEB 4-5.
C OLEMAN S TEWARDSHIP S ERVICES W EBSITE Ashley Cooper Stephanie Locher Matt Schultz Justin Turney.
Flame & Smoke Detection System Flame & Smoke Vision Detection is an intelligent vision-based analytics system which can timely detect suspicious fire or.
S OFTWARE ENGINEERING On the importance of planning…
1 Advanced Computer Programming Software Modeling UML Copyright © Texas Education Agency, 2013.
TSS Scoping Study Results AoH Meeting – Tempe, AZ November 16/17, 2005.
DEVRY CIS 321 Week 4 Milestone 4 Part 1 Check this A+ tutorial guideline at For.
DEVRY COMP 220 I L AB 2 R ESISTOR L AB R EPORT AND S OURCE C ODE C HECK THIS A+ TUTORIAL GUIDELINE AT HTTP :// WWW. ASSIGNMENTCLOUD. COM / COMP -220/ COMP.
How Artificial Intelligence is Changing the Supply Chain
Figure Legend: From: An escape from crowding
Business Advertisement / Promotion Application
Hire Toyota Innova in Delhi for Outstation Tour
Social Media Data Mining
Managing Human Resources and Labor Relations.
2018 Real Cisco Dumps IT-Dumps
بسم الله الرحمن الرحیم روش تحقیق و مقاله نویسی موضوع:
Company Health Challenge Super Computer Services, Inc. Presenter Name
Computer-Aided Software FMEA Herbert Hecht, Xuegao An and Myron Hecht
Supplemental Figure 1A Pt Pt Pre-treatment
Laura Marshall & Alexander Wall CSE 403 Project Proposal
Water Storage Investment Program
Software Engineering Practices
Similarities Differences
System + Database ①​​ Post ② Push Notification ③ Approved ④ ⑤ ​​ Push Notification.
Presentation transcript:

ACS 560 P ROJECT M ICROBLOG 911 Kassie M. Bowman December 6, 2011

P ROJECT O VERVIEW Emergency detection using microblog data Benefits Real-time information Instant notification to relevant parties Challenges Timeliness without false alarms 2

M AIN C MAP 3

P ROJECT S CHEDULE 4

I NCEPTION P HASE 5

I NCEPTION C MAP 6

A PPLICATION A RCHITECTURE 7

D ESIGN M ATRIX 8

D ESIGN S TRUCTURE M ATRIX 9

E LABORATION P HASE 10

E LABORATION C MAP 11

QFD H OUSE OF Q UALITY 12

UML - C OMPONENT D IAGRAM 13

UML – C LASS D IAGRAMS 14

UML – A CTIVITY D IAGRAM Emergency detection algorithm Process posts Group similar posts Score groups Cumulative followers Cumulative reposts Create emergency 15

P ROJECT S UMMARY 16

D ELIVERABLES – I NCEPTION P HASE Vision Document (v2) Application Architecture (v2) Software Requirement Specification (v4) FMEA (v1) Design Matrix (v2) Design Structure Matrix (v2) 17

D ELIVERABLES – E LABORATION P HASE Project Management Plan (v5) QFD House of Quality (v1) System Architecture (v2) Software Design Description (v3) Project Schedule (v3) 18

T HANK Y OU. Any questions?