Assembly Line Balancing

Slides:



Advertisements
Similar presentations
Line Balancing Problem A B C 4.1mins D 1.7mins E 2.7 mins F 3.3 mins G 2.6 mins 2.2 mins 3.4 mins.
Advertisements

9 Layout Strategies PowerPoint presentation to accompany
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Facility Decisions: Layouts © The McGraw-Hill Companies, Inc., 2003.
Chapter 4: Manufacturing Processes. Learning Objectives How production processes are organized Trade-offs to be considered when designing a production.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Welcome.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Roberta Russell & Bernard W. Taylor, III
MGT3303 Michel Leseure Facility Decisions Learning objectives: –To discuss facility location decisions –To discuss capacity planning –To discuss factory.
Chapter 10 – Facility Layout
Operating Processes process  A process is a set of tasks to be performed in a defined sequence  A process uses inputs to create outputs that are of value.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
AB EH C D F G I 10 Min Example Balance for 3 units/hour and compute theoretical min number of stations (primary: longest task time; secondary:
COMSOAL Computer Method for Sequencing Operations for Assembly Lines Lindsay McClintock OPERMGT 345 – 004 May 6, 2003.
Operations Management Layout Strategy
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
Assembly Line Balance Balance.
Facility Layout Dr. Everette S. Gardner, Jr.. Facility Layout2 Machine shop process layout Receiving Grin- Mills ders Raw matl. Large number of storage.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 5 Facilities To Accompany.
Manual Assembly Lines Chapter 4 Sections:
Chapter 9 : Layout Strategies
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
McGraw-Hill/Irwin.
Process Analysis process  A process is a set of tasks to be performed in a defined sequence  Process analysis describes how a process is doing and can.
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
Line Balancing Problem
Assembly Line Balancing
Assembly Line Balancing
Workstation. The assembly design is based on the demand for the peak quarter of year 5 Cycle Time = sec./unit There will be three assembly lines.
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Process Layout Chapter 7 July 20, 2005.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Capacity & Facilities Operations Management Chapter 7 Roberta.
Line Balancing. Example problem - Golf Club mfg/assy firm Customer demand requires production volume of 24 finished clubs in an 8 hour shift Customer.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Assembly Line Balancing Introduction to Industrial Engineering.
1 Lean Office – Layout & Cells
Assembly Line Balancing Boeing Corporation
Operations Fall 2015 Bruce Duggan Providence University College.
Chapter 7s Class 1.
OPERATIONS MANAGEMENT for MBAs Fourth Edition 1 Meredith and Shafer John Wiley and Sons, Inc. Chapters 8 & 8S : Capacity, Forecasting Topic 2: Capacity.
Dr. Ron Lembke.  Situation: Assembly-line production.  Many tasks must be performed, and the sequence is flexible  Parts at each station same time.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 9 Facility Layout. Objectives of Facility Layout Minimize material handling costs Utilize space efficiently Utilize labor efficiently Eliminate.
Facility Layout Objectives of Facility Layout Basic Types
Part 3.
Revision BUSI 2301 B. Averaging methods b). Moving average - sample problem Compute a three-period moving average forecast for period 6, given the demand.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Supply Chain Customer Order Decoupling Point
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
Additional line balancing notes
Analytical Tools for Process Analysis and Improvement
1. Draw the precedence diagram.
Process Design and Analysis
Facility Layout Chapter 6A.
Assembly line balancing
FACILITY LAYOUT Facility layout means:
Chapter 5 Process Analysis.
3 Assembly Line Balancing CHAPTER Arranged by
Chapter 6 Network-Based Scheduling
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
How can we make a robot more energy efficient?
Chapter 6A Facility Layout 2.
Process Layout Chapter 8 L L M M D D D D L L M M L L M M G G L L G G A
Using the queuing-theoretic approximations for the performance of “push” and “pull” production lines to address Design Problems.
Chapter 5 Process Analysis.
Presentation transcript:

Assembly Line Balancing The process of equalizing the amount of work at each work station on an assembly line.

How to Balance a Line Specify the task relationships and their order of precedence. Draw and label a precedence diagram. Calculate the desired cycle time (Cd). Calculate the theoretical minimum number of workstations (N). Group elements into workstations recognizing cycle time & precedence. Evaluate the efficiency of the line (E). Repeat until desired line efficiency is reached. Specify task relationships and order of precedence – this determines what order the tasks need to be done in to complete one product. Draw and label precedence diagram – this creates a visual layout of the process. Work elements are usually represented by circles or nodes and connected by arrows to show precedence. Desired cycle time – calculates the maximum amount of time the product can stay at a workstation in order to meet a targeted production amount. Theoretical minimum number of work stations –the sum of the task times divided by the desired cycle time. Group elements into work stations – this is the trial and error portion of the process, begin arranging the tasks into workstations to determine the most efficient line. Evaluate efficiency – this calculates the sum of the task times divided by the number of workstations times the actual cycle time. Repeat – if you do not get a line with your desired efficiency the process must be repeated. Next few slides will run audience through how to balance a line by hand.

Order of Precedence Joe’s Sub Shop Specify the task relationships and their order of precedence. Joe’s Sub Shop Task Work Element Precedence Time (min) A Receive Order — 2 B Cut Bread 1 C Prepare Toppings D Assemble Sandwich B,C 3 E Wrap Sandwich F Deliver Sandwich This is an example of a precedence chart for making a sub sandwich. Each step in the process of making a sandwich is listed out, then task precedence is determined, in addition to the time it takes to complete each task. Next you will see how to draw a precedence diagram.

The Precedence Diagram Draw and label a precedence diagram. B 1 min A 2 min Here is the start to the precedence diagram. Each task is labeled then connected to each preceding task.

The Precedence Diagram Draw and label a precedence diagram. B 1 min D 3 min E 1 min F 3 min A 2 min This shows the completed precedence diagram for a sub sandwich. C 2 min

Cycle Time Calculate the desired cycle time (Cd). Cd = Cd = If Joe’s Sub Shop has a demand of 100 sandwiches per day. The day shift lasts 8 hours. Cd = production time available desired units of output Next the desired cycle time must be calculated. To calculate desired cycle time, you divide the production time available by the number of units desired. If Joe’s Sub Shop has a demand of 100 sub sandwiches per day, and the day shift is 8 hours long, what is the desired cycle time? The desired cycle time is 4.8 minutes. This means that the sandwich can only stay 4.8 minutes at each workstation in order to meet Joe’s demand of 100 sandwiches per day. Cd = 8 hours x 60 minutes/hour 100 sandwiches Cd = 4.8 minutes

 ti Minimum Work Stations j Calculate the theoretical minimum number of workstations (N). If Cd = 4.8 minutes N =  ti Cd j ti = completion time for task i j = number of tasks Cd = desired cycle time Next the theoretical minimum number of workstations must be calculated. If Joe’s Sub Shop has a desired cycle time of 4.8 minutes, what is the theoretical minimum number of workstations possible? i =1

 ti Minimum Work Stations j Calculate the theoretical minimum number of workstations (N). If Cd = 4.8 minutes N =  ti Cd j N = 2 + 1 + 2 + 3 + 1 + 3 4.8 The theoretical minimum number of workstations is 2.5. This means that the sandwich can can theoretically have 2.5 workstations in order to meet Joe’s demand of 100 sandwiches per day. Since it is not possible to have half of a work station, we will round this up to 3 workstations. i =1 N = 2.5 workstations  3 workstations

Workstation Time (min) Order Work Stations Group elements into workstations recognizing cycle time & precedence. Joe’s Sub Shop Workstation Task Element Time (min) Workstation Time (min) 1 A 2 3 B C D 4 E F Here is a completed chart of possible workstations. Notice that no workstation time exceeds the desired cycle time of 4.8 minutes. Now lets calculate the efficiency of the line.

 ti Line Efficiency j Evaluate the efficiency of the line (E). nCa If Ca = 4 minutes and n = 4 work stations. E =  ti nCa j ti = completion time for task i j = number of tasks Ca = actual cycle time n = actual number of workstations This is the equation for calculating the assembly line efficiency. It is the sum of the task times divided by, the number of workstations times the actual cycle time. The actual cycle time is the maximum workstation time on the line. The actual cycle time for this problem is 4 minutes. i =1

 ti Line Efficiency j Evaluate the efficiency of the line (E). nCa If Ca = 4 minutes and n = 4 work stations. E =  ti nCa j E = 2 + 1 + 2 + 3 + 1 + 3 4 * 4 The efficiency of the assembly line, using this group of workstations, is 75.0%. i =1 E = 75.0% effective

Workstation Time (min) Trial and Error Repeat until desired line efficiency is reached. Joe’s Sub Shop Workstation Task Element Time (min) Workstation Time (min) 1 A 2 4 C B D 3 E F Because Joe’s Sub Shop wants a higher rate of efficiency than 75.0%, we must continue to try different combinations of workstations until a desired line efficiency is reached. (click to 2nd part of slide) Notice how task B was moved from workstation 1 to workstation 2 and C was moved to workstation 1. (Click to next part of slide) This combination is 100% effective. Now let’s try working a simple problem together. E = 100.0% effective

Class Exercise A sample precedence chart A — 3 B 5 C 2 D B,C 4 E Task Time (min) A — 3 B 5 C 2 D B,C 4 E This is a sample precedence chart. We are going to balance this line by hand. Write this chart down in your notes.

Class Exercise Draw and label a precedence diagram. A 3 min B 5 min Here is the start of the precedence diagram. Now you try to draw the rest of the diagram. (Allow time for audience to complete diagram)

Class Exercise Draw and label a precedence diagram. A 3 min B 5 min D Here is the completed precedence diagram. Is this what you came up with? Now we need to calculate the desired cycle time and the theoretical minimum number of workstations. C 2 min

Class Exercise Calculate the desired cycle time (Cd). Cd = Cd = If, there is a demand for 100 units to be produced every 12 hours. Cd = production time available desired units of output Now calculate the desired cycle time if there is a demand for 100 units to be produced every 12 hours. (Allow time for the audience to calculate) The desired cycle time is 7.2 minutes. If you got 0.12 as an answer you forgot to convert the number of available hours into minutes. Cd = 12 hours x 60 minutes/hour 100 units Cd = 7.2 minutes

Class Exercise Calculate the theoretical minimum number of workstations (N). If Cd = 7.2 minutes N =  ti Cd j ti = completion time for task i j = number of tasks Cd = desired cycle time Next the theoretical minimum number of workstations must be calculated. If the desired cycle time of 7.2 minutes, what is the theoretical minimum number of workstations possible? i =1

Class Exercise Calculate the theoretical minimum number of workstations (N). If Cd = 7.2 minutes N =  ti Cd j N = 2 + 5 + 2 + 4 + 2 7.2 The theoretical minimum number of workstations is 2.08. Since it is not possible to have part of a work station, we will round this up to 3 workstations. Now comes the fun part… i =1 N = 2.08 workstations  3 workstations

Workstation Time (min) Class Exercise Group elements into workstations recognizing cycle time & precedence. Workstation Task Element Time (min) Workstation Time (min) ? A 3 B 5 C 2 D 4 E Now try to fill in the number of work stations and the time for each workstation. Remember that no workstations time can exceed 7.2 minutes but you can change the order of the work elements as long as you keep precedence in mind. (Give the audience plenty of time to try and figure this out)

 ti Class Exercise j Evaluate the efficiency of the line (E). nCa ti = completion time for task i j = number of tasks Ca = actual cycle time n = actual number of workstations Now calculate the efficiency of the line you created. Remember, the actual cycle time is the maximum workstation time on the line. (Give audience time to calculate) What did everyone come up with? i =1

Workstation Time (min) Class Exercise The most efficient set up of the line Workstation Task Element Time (min) Workstation Time (min) 1 A 3 5 C 2 B D 4 6 E This is the most efficient set up of the line. E = 83.3% effective