F Proton Plan Eric Prebys, FNAL Accelerator Division.

Slides:



Advertisements
Similar presentations
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Advertisements

Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Near Term* Plans for the Fermilab Proton Source Eric Prebys FNAL Accelerator Division *Near term = “prior to proton driver”
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Accelerator upgrades for NuMI Robert Zwaska Fermilab August 6, 2006 NBI 2006.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
F Proton Plan Eric Prebys and Ioanis Kourbanis, FNAL Accelerator Division.
MiniBooNE Meeting 4/22/05 Eric Prebys 1 Status of the Proton Source Haud ignota loquor* Eric Prebys *I say things that are known.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Accelerator Status and Plans
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Proton Plan Expectations Eric Prebys AD/Proton Source.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Toward a Proton Plan Eric Prebys Fermilab Accelerator Division.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PAC Meeting, December 12, Prebys 1 The Problem.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Proton Economics Eric Prebys FNAL Accelerator Division.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
Proton Plan (short version) (BEAMS-DOC-1441) Eric Prebys, FNAL Accelerator Division.
Presentation transcript:

f Proton Plan Eric Prebys, FNAL Accelerator Division

f DOE Tevatron Operations Review - Prebys 2 Proton Plan Charge  Develop a plan for a reasonable set of improvements and operational initiatives to maximize proton delivery to NuMI and the Booster Neutrino Beam (BNB) over the next ten years or so.  Estimate the budget and timeline for these improvements.  Estimate proton delivery to both beam lines if the Plan proceeds on schedule.  Note: this plan precedes the Proton Driver replacement of the existing Proton Source (Linac+Booster).

f DOE Tevatron Operations Review - Prebys 3 Staged Approach to Neutrino Program  Stage 0 (now):  Goal: deliver 2.5E13 protons per 2 second MI cycle to NuMI (~2E20 p/yr), limited by MI RF system.  Deliver 1-2E20 protons per year to Booster Neutrino Beam (currently MiniBooNE)  Stage 1 (~2007):  A combination of Main Injector RF improvements and operational loading initiatives will increase the NuMI intensity to 4-5E13 protons to NuMI per 2.2 second cycle (~3E20 p/yr).  This will increase by ~20% as protons currently used for pbar production become available.  It is hoped we can continue to operate BNB at the 2E20 p/yr level during this period.  Stage 2 (post-collider):  In this phase, we will consider using the Recycler as a preloader to the Main Injector and possibly reducing the Main Injector cycle time.  The exact scope and potential of these improvements are under study.  Stage 3 (proton driver or equiv.)  Main Injector RF must accommodate 1.5E14 protons every 1.5 seconds  NuMI beamline and target must also be compatible with these intensities. This plan

f DOE Tevatron Operations Review - Prebys 4 Limits to Proton Intensity  Total proton rate from Proton Source (Linac+Booster):  Booster batch size ~4-5E12 protons/batch  Booster repetition rate 15 Hz instantaneous Prior to shutdown: 7.5Hz average (injection bump+RF)  Beam loss Damage and/or activation of Booster components Above ground radiation  Total protons accelerated in Main Injector:  Maximum main injector load Six “slots” for booster batches (3E13) Up to ~11 with slip stacking ( E13) RF stability limitations (under study)  Cycle time: 1.4s + loading time (1/15s per booster batch) Historically our biggest worry

f DOE Tevatron Operations Review - Prebys 5 Proton Plan Developments Since Last Ops Review  AD Review, July 2005  Director’s Review, August 2005  “Baseline”, September 2005  Since baseline:  Plan tracked with monthly PMG meetings  Change control through formal change request (CR) procedure. So far, five complete CR’s with three more in process

f DOE Tevatron Operations Review - Prebys 6

f 7 Plan Strategy  Increasing the proton delivery from the Booster to NuMI and MiniBooNE  Increase maximum average Booster repetition rate.  Increase acceptance by improving orbit control and beam quality.  Increasing the beam intensity in the Main Injector for NuMI  Main Injector multi-batch operation.  Slip stacking in Main Injector (requires RF upgrade).  Improving operational reliability and radiation limitations  Linac quad supplies  Booster and Linac Instrumentation  Booster RF Upgrade  Alleviate 7835 Problem  Organized along the Run II model  “campaign” rather than “project”

f DOE Tevatron Operations Review - Prebys 8 Significant Elements of Plan  Linac  Stockpile two year supply of spare 200 MHz power amplifier tubes (7835’s), in the event of an interruption in supply  Characterize and improve Low Energy Linac Low Level RF  Booster:  Replace and reconfigure injection bump (ORBUMP) system.  Relocate 8 GeV dump from Booster tunnel to MI-8 transfer line  Make Booster robust to 9 Hz, and understand requirements to go to 15 Hz  Design, build, and install new corrector system  Main Injector:  Replace seven quadrupoles with increased aperture versions, to reduce injection and extraction losses.  Operationally develop multi-batch and multi-batch slip stacked operation  Design and install collimation system, both in the MI-8 line and in the MI ring  Modify injection kicker to allow multi-batch slip stacked operation  Characterize and perhaps make improvements to RF system, to support high intensity operation. Red = to be completed this shutdown

f DOE Tevatron Operations Review - Prebys 9 Level 3 Breakdown with Budget

f DOE Tevatron Operations Review - Prebys 10 Labor Profiles FY06 FY07 FY08 FY Shutdown 2007 Shutdown 2008 Shutdown Build Correctors

f DOE Tevatron Operations Review - Prebys 11 Major Accomplishments This Year  Linac  10/12 strategic spare 7835’s delivered so far  Design of pulsed quad supplies ongoing  LEL LLRF studies well under way  Booster  Operationally supported slip stacking for pBar production, NuMI, and MiniBooNE Required operational cogging Logintudinal properties improved with the intervention of Rapid Response Team (RRT)  Worked in preparation for this shutdown More about this shortly  Main Injector  Initiated routine full 2+5 operation Rate maximum until slip stacking begins after shutdown  Did studies related to full slip stacking Demonstrated accelerated 2+9 operation at low intensity

f DOE Tevatron Operations Review - Prebys 12 Proton Projections  Phases of Operation  Phase I (now) Booster lattice distortions ameliorated Booster limited to 7.5Hz total repetition rate Main Injector limited to 4E13 protons (2+5 operation)  Phase II After present shutdown Injection bump (ORBUMP) replaced Drift tube cooling in Booster RF cooling finished Booster capable of 8-9Hz operation Begin to implement 2+9 full NuMI slip stack operation.  Phase III Full NuMI 2+9 slip stack operation. Might require some MI RF modifications (under study)

f DOE Tevatron Operations Review - Prebys 13 Procedure for estimating Proton Delivery  Assume traditional operational priority:  Protons for pBar production Limited by ability to slip stack Limited by max cooling rate  Protons for NuMI Limited by max Booster batch size Limited by max MI cycle rate Limited by max MI proton capacity (will be) limited by ability to slip stack NuMI protons in MI  Protons for BNB (currently MiniBooNE) Determined by difference between Booster capacity and maximum MI loading. Currently limited by Booster losses, and will continue to be for some time. Ultimately limited by Booster rep. rate. Extremely sensitive to fluctuations in total Booster output

f DOE Tevatron Operations Review - Prebys 14 Evaluate Effect of Booster Improvements  Calculate effect of various improvements based on increased acceptance:  Use: Effective aperture reduction Booster Dump Relocation

f DOE Tevatron Operations Review - Prebys 15 Long Term Projections  Note: these projections do not take into account the collider turning off in 2009  NuMI rates would go up at least 20%  Possibly much higher with Stage II improvements Post Collider

f DOE Tevatron Operations Review - Prebys 16 FY06 Proton to MiniBooNE

f DOE Tevatron Operations Review - Prebys 17 Protons to NuMI