E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.
Advertisements

/3024/ SUN MON TUE WED THU FRI SAT JANUARY 2011 February 2011 SMTWTFS
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
LCWS13 at Tokyo, 2013 Nov. 121Eiji Kako (KEK, Japan) Status of STF2 Input Couplers Eiji KAKO (KEK, Japan)
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
Detail plan of S1-Global H. Hayano (KEK),
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
S1G Experiment Schedule Plan
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
FK International School First Term(2017/2018)School Calendar
S1-G Webex meeting Global Design Effort
Runestone Area Education District #
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
KEK injector cryomodule
MON TUE WED THU
Insert Client Logo here with Client Project Name
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Construction and First Coo-down Test of cERL Injector Cryomodule
ANNUAL CALENDAR HOLIDAYS JANUARY FEBRUARY MARCH APRIL MAY JUNE
HOLIDAYS ANNUAL CALENDAR JANUARY FEBRUARY MARCH APRIL MAY JUNE
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
HOLIDAYS ANNUAL CALENDAR JANUARY FEBRUARY MARCH APRIL MAY JUNE
2008 Calendar.
S M T W F S M T W F
January MON TUE WED THU FRI SAT SUN
Sun Mon Tue Wed Thu Fri Sat
1 - January - Sun Mon The Wed Thu Fri Sat
2 0 X X s c h e d u l e 1 MON TUE WED THU JANUARY 20XX FRI SAT SUN MEMO.
Report of TTC-TB meeting at INFN-Milano
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Calendar
Calendar – 2010 (October, November & December)
Calendar.
January MON TUE WED THU FRI SAT SUN
TTC meeting, Milano Global Design Effort
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Sun Mon Tue Wed Thu Fri Sat
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
January MON TUE WED THU FRI SAT SUN
S M T W F S M T W F
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Sun Mon Tue Wed Thu Fri Sat
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
Reviewing Abbreviations
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
2008 Calendar.
S M T W F S M T W F
S M T W F S M T W F
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
Presentation transcript:

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 2 Outline 1st cool-down starts in 7th, June 1. Low Power RF Tests (3, +1 weeks). Fundamental RF parameters. Tuner performance at room temperature, 2. Conditioning of Couplers (2 weeks) 2nd cool-down starts in 6th, September 3. High Power RF Tests (2, 2, 4 weeks). Cavity high gradient performance. Observation and compensation of L. Detuning. Dynamic loss measurement

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 3 June, 2010 Mon Tue Wed Thu Fri Sat Sun Cool-down Start Heat Load Meas. at 4K to 2K 1. Low Power RF Test 2. Low Power RF Test

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 4 July, 2010 Holiday Mon Tue Wed Thu Fri Sat Sun 3. Low Power RF Test INFN (Carlo Pagani) / FNAL Heat Load Meas. at 2K Calib. Meas. at 2K by Heater Warm up 4. Low Power RF Test (spare) (or INFN / FNAL)

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 5 Plan of Low Power RF Tests 22 (Tue)23 (Wed)24 (Thu)25 (Fri) 02 (Fri)01 (Thu)30 (Wed)29 (Tue) 05 (Tue)06 (Wed)07 (Thu)08 (Fri) Cryomodule-C; Carlo Pagani and INFN/FNAL Colleagues

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 6 August, 2010 Mon Tue Wed Thu Fri Sat Sun Himeji Coupler Aging Preparation Coupler Aging A-1, C-1 Coupler Aging A-2, C-2 (maintenance)

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 7 Conditioning of Input Couplers. one coupler individually (one by one) for 3 days per one coupler. 20  s, 50  s, 100  s, 200  s, 400  s, 500  s Pin = 500 kW, 5 Hz. 800  s, 1.0 ms, 1.5 ms Pin = 300 kW, 5 Hz Cryomodule-C; #1 Klystron (2 MW) Cryomodule-A; #2 Klystron (5 MW) Participation from DESY, SLAC, FNAL is absolutely necessary.

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 8 September, 2010 Holiday (Holiday) Mon Tue Wed Thu Fri Sat Sun Cool-down Start Heat Load Meas. at 4K to 2K Tsukuba Coupler Aging A-3, C-3 Coupler Aging A-4, C-4 High Grad. A-1, C-1 High Grad. A-2, C-2 High Grad. A-3, C-3 High Grad. A-4, C-4

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 9 High Power RF Test (1) 21 (Tue)23 (Thu) 24 (Fri)22 (Wed) 28 (Tue) 29 (Wed) 30 (Thu) 01 (Fri) Processing of Cavities Many interesting experiments are planed. S1-Global is really an international work.

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 10 October, 2010 Holiday Mon Tue Wed Thu Fri Sat Sun Lorentz D. A-1, C-1 Lorentz D. A-2, C-2 Lorentz D. A-3, C-3 Lorentz D. A-4, C-4 C-1C-2C-3C-4 A-1A-2A-3A-4 Dynamic Loss Meas. FNAL (T. Peterson)

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 11 High Power RF Test (2) Compensation of Lorentz Detuning 05 (Tue)12 (Tue) 06 (Wed)13 (Wed) 07 (Thu)14 (Thu) 08 (Fri)15 (Fri)

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 12 High Power RF Test (3) Measurement of Dynamic RF Loss 19 (Tue)20 (Wed)21 (Thu)22 (Fri) 26 (Tue)27 (Wed)28 (Thu)29 (Fri) 04 (Thu) 05 (Fri) 11 (Thu)12 (Fri)

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 13 November, 2010 (Holiday) Mon Tue Wed Thu Fri Sat Sun 4 Cavity Control A 4 cav.C 4 cav. Dynamic Loss 8 cav. Dynamic Loss8 Cavity Control DRFS Preparation Heat Load at 2KCalibration by Heater DRFS LLRF

E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 14 December, 2010 Holiday Mon Tue Wed Thu Fri Sat Sun Warm up DRFS