Vapor Recovery Requirements for E85 Dispensing Facilities Meeting to Discuss Vapor Recovery Requirements for Facilities that Dispense E85 February 2, 2006.

Slides:



Advertisements
Similar presentations
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Advertisements

June 16, 2010 California Air Resources Board LaMar Mitchell1 Basic Guide to Gasoline Vapor Recovery at the Gasoline Dispensing Facility Gasoline vapor.
Petroleum Equipment Institute
November 14, 2003 Aboveground Storage Tank Enhanced Vapor Recovery.
California Integrated Waste Management Board Agreement with Air Resources Board for Surveillance Assistance Special Waste Committee Meeting May 10, 2006.
SPILL PREVENTION CONTROL AND COUNTERMEASURE (SPCC) Title 40 CFR 112.
Georgia Environmental Protection Division Stage II Vapor Recovery Decommissioning Testing 1. Test Notification & Protocols 2. Test Procedures.
Heavy Duty OBD Testing Requirements
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002.
Public Workshop Proposed Modifications to the Clean Fuels Regulations Regarding Clean Fuel Outlets March 18, 1999 California Environmental Protection Agency.
LOW CARBON TRANSIT OPERATIONS PROGRAM [SB 862 (2014)] DECEMBER 2014.
OPERATOR, Tester & INSTALLER Licensing WWQRR, Chapter 17, Part L
Safety Report Treatment of Safety-Critical Systems in Transport Airplanes Office of Research and Engineering.
MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update.
California Air Resources Board Enhanced Vapor Recovery.
MassDEP Stage I Vapor Recovery Program
Overview Enacted July 9, 2008 Provides $650 Million in Funding and Tax Credits for Alternative Energy and Conservation Creates Two Funding Streams: –$500.
Unihose Dispenser Workshop June 16, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental Protection Agency.
Mobile Source Control Division November 13, 2002 Planning and Technical Support Monitoring and Laboratory Division California Air Resources Board Proposed.
California Air Resources Board December 12, 2002 Enhanced Vapor Recovery Technology Review.
12/25/2009 Pleasure Craft Proposal Draft Pleasure Craft Evaporative Emissions Regulation and Standards.
Gasoline Dispenser Hose Permeation Workshop November 13, 2003 Monitoring and Laboratory Division Air Resources Board California Environmental Protection.
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
Enhanced Vapor Recovery Amendments Workshop June 18, 2002 Air Resources Board California Environmental Protection Agency.
1 ENHANCED VAPOR RECOVERY An Update Presented by Laura McKinney at the Petroleum Equipment Institute’s CONVEX2000 October 2, 2000 California Environmental.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Vandenberg Air Force Base E-85 Fueling Facility California Air Resources Board E-85 Workshop Presented by Stu S. Webster Metcalf & Eddy 02 February 2006.
California Air Resources Board Workshop November 3, th Street, Room 202 1:30 - 3:30 p.m. Aboveground Storage Tank Enhanced Vapor Recovery.
AC Transit Hydrogen Energy Station / Oakland Fire Department Project AC Transit Hydrogen Energy Station / Oakland Fire Department Project You want to do.
Proposed Amendments to Enhanced Vapor Recovery Regulations November 18, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental.
Monitoring and Laboratory Division April 25, 2002 Planning and Technical Support Division Mobile Source Control Division California Air Resources Board.
E85 Fuel Dispensing at LBNL CARB E85 Workshop, February 2, 2006 Slide # 1 Berkeley Lab’s Involvement in the California Air Resources Board’s Research and.
Air Resources Board’s 2005 Distributed Generation Technology Review DG Workgroup Meeting June 2, 2004 California Environmental Protection Agency Air Resources.
Workshops on Discussion Draft of Guidelines December 2014.
Enhanced Vapor Recovery Amendments Workshop September 9, 2002 Air Resources Board California Environmental Protection Agency.
Demonstration Testing l Purpose: Assurance that major monitors are able to detect a malfunction and illuminate the MIL with emissions below the malfunction.
Monitoring and Laboratory Division July 2, 2003 California Air Resources Board Small Off-Road Engine Workshop Evaporative Emission Program.
MLD - Proposed TP Proposed Vapor Recovery Test Procedure TP DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES.
13/3/2010 Spark-Ignition Marine Engine Draft Proposal.
PVE Testing l Assurance that the OBD system is working properly in-use and meets the requirements of the regulation l Testing done close to the start of.
Applications due Oct 16, 2015 Megan Ottesen
1 Public Hearing for Amendments to Rule 2020(Exemptions) Rule 4621(Gasoline Transfer into Stationary Storage Containers, Delivery Vessels, and Bulk Plants)
REPLACING, REMOVING, OR UPGRADING UNDERGROUND STORAGE TANKS (RUST) PROGRAM Janice Clemons, RUST Program Manager.
Regulatory Issues Associated with the Use of Higher Ethanol Blends Ann Seha Assistant Commissioner Minnesota Pollution Control Agency.
Joe Stapinski Senior UST Inspector (317)
LOW CARBON TRANSIT OPERATIONS PROGRAM AUGUST 2015.
Portable Fuel Container Public Workshop California Air Resources Board Monitoring and Laboratory Division November 19, 2003.
California Air Resources Board Evaporative Emission Proposal John McKnight IBEX Miami Beach Convention Center October, 13, 2009.
Engineering Evaluation Unit Monitoring and Laboratory Division California Air Resources Board (916) ABOVE GROUND STORAGE TANK (AST) VAPOR RECOVERY.
30th Space Wing Team Vandenberg - HAWKS 1 California Airborne Toxic Control Measures for Particulate Matter Emissions from Diesel-Fueled Engines John Gilliland.
AST Stakeholder Meeting California Air Resources Board Stakeholder Meeting February 17, th Street, Room :00 a.m. - 12:00 p.m.
Presented at the Fifth Annual California Unified Program Conference February 6, 2003 Enhanced Vapor Recovery Cindy Castronovo Air Resources Board Cal-EPA.
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING April 17, 2002.
 To discuss MassDEP’s draft revisions to the following regulations:  Stage II – 310 CMR 7.24(6)  Stage I – 310 CMR 7.24(3)  Definitions – 310 CMR.
Phase II Enhanced Gasoline Vapor Recovery and In-Station Diagnostics
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
1 Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board Aboveground Storage Tank Enhanced Vapor.
Shariq Husain, PE INDOT Roadway Review Engineer Highway Design and Technical Support Proprietary Materials – Approval Process.
State Allocation Board Meeting November 3, 2010 Presented By.
Leon Wirschem, REHS/HMS County of San Diego Department of Environmental Health Hazardous Materials Division
California Desert Air Working Group 2008 Conference California Air Resources Board Regulatory Update Embassy Suites Hotel and Spa La Quinta November 6.
Steve Griffith February 28th, 2017
California Department of Education
Methane Emission Standards for Crude Oil and Natural Gas Facilities
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
Spill Prevention, Control and Countermeasures (SPCC)
This event will begin at 10:00 AM
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Presentation transcript:

Vapor Recovery Requirements for E85 Dispensing Facilities Meeting to Discuss Vapor Recovery Requirements for Facilities that Dispense E85 February 2, 2006 Alex Santos California Air Resources Board

2 E85 Dispensing Facilities Subject to Control of Vapor Emissions “Gasoline” means any petroleum distillate with an RVP>4.0 psi and meeting the requirements of CCR, Title 13, section 2250 et seq. (CCR, Title 13, Section 94010) E85 (Ethanol 85%, 15% gasoline) meets the definition of gasoline. –California has a specification for E85 (CCR, Title 13, Section ) California Health and Safety Code (HSC) authorizes ARB to control gasoline vapor emissions and certify vapor recovery systems (HSC Section et seq.)

3 CARB Must Certify E85 Vapor Recovery Systems Before They Are Installed, Sold, or Offered for Sale E85 dispensing facilities are considered “novel” facilities, which are certified under Certification Procedure (CP)-205 CP-205 allows ARB staff discretion in determining certification requirements Currently, no certified vapor recovery (VR) systems for E85

4 Proposed CP-205 Certification Requirements for E85 Previously Certified VR Systems (Gasoline) Existing certified VR systems… Aboveground storage tanks (ASTs) Enhanced Vapor Recovery (EVR) Pre-EVR …may be certified for use with E85, if the VR systems meet following criteria: Materials Compatibility Pressure Integrity 180 day field demonstration Engineering Evaluation

5 Proposed CP-205 Certification Requirements for E85 New Design VR Systems for E85 Facilities That Use Aboveground Storage Tanks Requirements based on the Interim Guidelines for Certifying Vapor Recovery Systems Using Above Ground Storage Tanks, November 30, Materials Compatibility

6 Proposed CP-205 Certification Requirements for E85 New Design VR Systems for E85 Facilities That Use Underground Storage Tanks Must be certified to EVR requirements (CP-201) Materials Compatibility

7 Research and Development Facilities Used to Generate Data In Support of Certification Five E85 Research and Development (R&D) facilities in California One facility open to general public – San Diego Four facilities fueling private fleets – Vandenberg AFB, Berkeley, Livermore, Sacramento Two are AST systems, three are UST systems Each facility is required to provide ARB with quarterly test results

8 Research and Development Facility Quarterly Test Results are Not Part of Certification Testing The purpose of R&D approval is to allow the installation of uncertified equipment for the purpose of generating data that used to support a certification application New R&D facility applications will only be considered if the VR system to be tested represents a change in system design from existing certified and R&D systems R&D TESTING DOES NOT QUALIFY AS CERTIFICATION TESTINGR&D TESTING DOES NOT QUALIFY AS CERTIFICATION TESTING

9 Overview of Pathway to Certification of E85 Vapor Recovery Equipment: Apply for Certification Application includes: VR system description Evidence materials compatibility with E85 Evidence of Reliability of VR System Installation and maintenance requirements of system Warranty information Challenge or failure modes and test protocols Proposed Test Station Information Approvals from Other Agencies

10 Overview of Pathway to Certification of E85 Vapor Recovery Equipment: Evaluation and Certification ARB Staff Responsibilities –Evaluate application, test data, and other information –Conduct certification testing in accordance with existing or new procedures –Document the certification process –Prepare Executive Order to certify or letter if certification is denied –Submit invoice to reimburse ARB for the time spent for system certification –Certification Report –Executive Order

11 Executive Order is the Blueprint for E85 Vapor Recovery System Installations Once certified, the E85 VR system can be offered for sale, sold and installed throughout the State

12 E85 Contacts Joe Guerrero (916) Alex Santos (916)

13 Questions?