Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Copyright 2006, The Johns Hopkins University and Clive Shiff. All rights reserved. Use of these materials permitted only in accordance with license rights.
PRESENTATION FOR CWEA TRAINING Keys to Successful Pipeline/Infrastructure Projects Pipeline Flow Diversion Presented by: Tom Epperson, PE, Tetra Tech.
June 6, 2013 SURFACE RECLAMATION OF THE CAPTAIN JACK MILL SUPERFUND SITE Nick Anton, CDM Smith Todd Bragdon, CDM Smith Mary Boardman, CDPHE Joy Jenkins,
The Water and Sanitation Project The Provision of Water and Sewer Connections to Toilet blocks in Informal Settlements in EThekwini.
Supplemental Specification 802: Constructing and Inspecting Pipe Culverts, Sewers, Drains and Drainage Structures Ted Strickland, Governor Jolene Molitoris,
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Wastewater Treatment Plants & Bacteria: Strategies for Compliance Wastewater Collection Systems Teague Harris Pate Engineers, Inc. John Montgomery Municipal.
Low Pressure Sewer Systems. Presented by: Bob Jordan, Manager Municipal Sales Fluid & Thermal Systems, Inc.
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Various services have to be connected. Here the sewer is being connected and pipes laid for storm water removal.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
Diagnosing a Clogged Sewer Line Tel:(914)
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
1 SEWERAGE SYSTEMS Visual inspection of sewers Michel FAVIER Technical Sales Department January 2003.
Timeline of Key Milestones and Dates DateKey Milestone February 2007Washtenaw County Drain Commissioner’s Office authorizes a project to identify opportunities.
1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Professional Sewer Line Cleaning Services Tel:(914)
Professional Sewer Line Cleaning Services Tel:(914)
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
TRENCHING AND EXCAVATIONS
Hargrave Street Pumpstation – Site Preparation July 2014.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Brief Synopsis of Project Hickahala Creek Hickahala Creek Pipeline Protection Project at milepost Tate County, Senatobia, MS Designed by Submar,
The City of North Bend Sanitary Sewer System
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
You Should Know Bulletin No. 135 © ACPA All Rights Reserved.
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
Wastewater Management
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Mike Baumann Statewide Utility Engineer January 22, 2015.
TVI Resource Development (Phils), Inc. September Gossan Dam Embankment Construction Late July 2005 Placement of Core Zone Material. Placement of.
Lakes Creek Road Waste Transfer Station Construction highlights.
Separating Inflow Reduction From Infiltration Removal Using Simple Tools Frederick Bloetscher, PhD, PE Florida Atlantic University.
Project Highlights of Consultant Managed Utility Coordination Efforts Estill County – KY 89 – Irvine 3-lane Kevin F. Damron, PE, Senior Project Manager.
WATERTIGHT STORMWATER SYSTEMS CREATED BY USING FLEXIBLE CONNECTORS USING FLEXIBLE CONNECTORS.
Backfilling new sewer line trench/excavation Multitask sewer installation: trenching and installing new sewer line followed by trench backfill and compaction.
David Kerr, PE Lessons Learned from recent challenging HDD installation.
Lift Station No. 1 and 2 Force Main Replacement Ronald Wastewater District Summer 2015.
Septic System Construction and Location GET PUMPED!
“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead SDIP City of Charlotte, North Carolina.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Water Main & Sewer Contractors Serving Manhattan For Over 95 Years All Types of NYC House Sewer Connections.
City of Cuthbert FY15 CDBG Sewer System Improvements Lance Renfrow River Valley Regional Commission.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
Sanitary Engineering Lecture 13
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Plaistow BOS Meeting 7/24/2017
Design and Construction of Composite Lined Landfills
Effluent from a septic tank effluent gravity (STEG) or septic tank effluent pump (STEP) system is discharged into a collection system. A typical STEP/STEG.
CTC 450 Review WW Characteristics.
107th & 110th Avenue North Public Utilities Renewal Projects
PERMIT REQUIRED CONFINED SPACE
What is an on-lot sewage system?
NORTH TRUNK SEWER REPLACEMENT PROJECT
NORTH TRUNK SEWER REPLACEMENT PROJECT
Pinole-Hercules Water Pollution Control Plant Upgrade Project
SW Gage Blvd - Street Repair Project
Wastewater Operations and Maintenance
Parkland/Brookdale Interceptor Replacement
Design of A Sewer Network For Tell Village (Sewer collection network)
Colchester Interceptor System Improvements Project
CONTROL AND SERVICE TECHNOLOGY LTD
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
February 2007 Note: Source:.
Ward Park Restroom Timeline
Presentation transcript:

Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe in order to: Reduce the potential for sewage spills from pipe blockage due to tree root intrusion at pipe joints. Reduce infiltration of groundwater from existing manholes, pipe joint problems/failures.

Project Construction Details Contractor: White Rock Construction, Inc. Work Start Date: July 21,2014 Replaced 1420 LF-6” sewer main Replaced 10 sewer manholes Work End Date: September 23, 2014 Notice of Completion: Issued December 2, 2014

Temporary sewage bypass pipe (from one manhole to another)

Removing large boulder from new sewer line trench Large boulder prepared for blasting

New sewer line trench/excavation with shoring and sand shading New sewer manhole and trench alignment/excavation with shoring

Preparing to lift trench box into deep sewer line trench/excavation New sewer line in deep trench with rock shading and trench box shoring