Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the www.delphisuppliers.com Websitewww.delphisuppliers.com Revised.

Slides:



Advertisements
Similar presentations
This orientation will familiarize you with some basic operations of WebStudy. Before your course activates, we will go over some of the basic tools that.
Advertisements

TA and Sessional / Lecturer PHASE II June – Sept 2011.
Empowering the Education Community to Improve Student Performance through the Intelligent Use of Practical Data EdGate Training: Part 3 - SchoolNotes.
Enrolling a member into the eGrants Portal. Please note: This is a two-step process. The first step is the “Invite Member” phase. The second step is the.
How To Use NCA’s Online Grant Application System
Online Submission and Management Information -- Authors
How to get started RMA Portal ZEBRA TECHNOLOGIES March 19, 2015.
BlackBoard Online Submission Annual Assessment Updates
UConn ECE is your opportunity to take UConn courses while still in high school. The UConn ECE courses you will take are equivalent to the same course at.
Chapter Accreditation Online System Usage Tutorial Department of Member Relations & Grants National Children’s Alliance.
Submitting Book Chapters via Manuscript Central A Short Guide for Wiley-VCH Authors.
Literature Direct The New Literature Fulfillment System “In by noon, out by noon.” Visit the web address above and save the.
Diversey Rebates Distributor User Manual. Link: CLICK.
GFP in the IUID Registry – A Basic Look Walt Clark, CPPM Raytheon IIS.
1 Welcome to GE! The attached presentation has been put together to assist you in completing your required I-9 form through the use of our I-9 wizard.
Online Community Involvement Tracking Hour Republic has developed a community involvement solution where students can track their hours online, with integrated.
Washington Campus Compact New Time Log Database Note to users: You should use Internet Explorer to use this database. In other programs (i.e. Firefox)
Welcome to BLT Online NQT Induction. Points We Will Cover: What is BLT Online NQT Service? What are the advantages of using it? User roles on the site.
Online Reporting Guide
ENTERING ELIGIBLE ENERGY RESOURCE APPLICATIONS IN DELAFILE Version 2.0 August 25, 2015.
Nipissing’s ROMEO e-System Internal Research Funding (IRF) Internal Research Grant Application Form (IRG)
Log on to the site using your User ID and Password and select journal and click “Log In” Click here to create a new account Click here to check the system.
Revised 12/27/13 Supplier/Vendor Instruction Manual Presented by Department of General Services, Procurement Division Office of Small Business & DVBE Services.
WELCOME to the QSNY Portal Public School Self-Study 1.
SFY 2016 OLGA TRAINING. REGISTERING FOR AN ACCOUNT All OLGA users need to have an account on the Turnstile by going to the department website, or right.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
First Look Program for Non Profit Buyers Tutorial.
Online Bid Submission in Bid4Michigan Screen Walk Tutorial Compiled by Christine Mitchell 1/4/2011.
SFY 2016 OLGA TRAINING. REGISTERING FOR AN ACCOUNT All OLGA users need to have an account on the Turnstile by going to the department website, or right.
At the Workforce Development and Continuing Education Student Menu select Register for Noncredit course(s) under Registration.
Online Submission and Management Information -- Authors AMS Annual Conference / AMS WMC Click on play to begin show.
Public Purchase Vendor Registration & Responding to a Bid Copyright © The Public Group, LLC - This document is confidential and intended only for the use.
Walk Through of VEEP Online System Updated May 2011.
Carnegie Corporation of New York Submitting a Proposal 1 This document will guide you through submitting a proposal to Carnegie Corporation of New York.
Adviser Panel. Go to All DD Track Advisers: Click “Advisor Login”
Revised 6/24/13 Supplier/Vendor Instruction Manual Presented by Department of General Services, Procurement Division Office of Small Business & DVBE Services.
Proprietary + Confidential1 Supplier iPPAP Training.
Reliance PPAP Application. Reliance - PPAP The PPAP application is designed to generate and track the entire Purchase Part Approval Process. Reliance.
ELISTING How to use eListing to conveniently and quickly file your personal property listing online. DEPARTMENT OF ASSESSMENTS King County To navigate.
How to CORRECTLY Complete a TEASE Access Request Form.
Submitting Your Thesis/Dissertation into Digital Southern.
ACCESSING AND UTILIZING THE PROVIDER PORTAL MEDICAL AUTHORIZATION UNIT 1.
How To Use NCA’s Online Grant Application System.
Online Submission and Management Information -- Authors
Production Part Approval Process
E-JPPAP User Guide _ Supplier
DSQR Training Reliance System
Journal of Mountain Science (JMS)
Training Documentation – Replacing GSPR with RFQ 2.0
Supplier Production Part Approval Process (PPAP)Training
Diversey Rebates End User Manual.
SUBMITTING A PAYMENT REQUEST FORM
At the Workforce Development and Continuing Education Student Menu select Register for Noncredit course(s) under Registration.
First Look Program for Non Profit Buyers
Hiring Process Training Guide
Materials Engineering Product Data Management (ePDM)
Navigating Procureware
Battelle Supplier Onboarding
HEATING, COOLING & WATER HEATING PRODUCTS
E-permits Tutorial for first-time users
To the ETS – Encumbrance Online Training Course
Online Training Course
Distributor Want aka. Dis-WAnt
Production Part Approval Process
Guide to Editors (ED) Journal of Mountain Science (JMS)
TPP Online Filing Instructions
To the ETS – Encumbrance Online Training Course
Journal of Mountain Science (JMS)
Volunteer Notetakers A complete guide on how to to sign-up as a Notetaker with the MU Disability Center.
Using the Bartlett Diagnostic Sample Submission Program (Plants)
Presentation transcript:

Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised 5/30/12

These instructions apply to any of the following PPAP submission scenario’s for Delphi E&S components. For Purchased Components:  Select the drop Down Box (see page 8) “Delphi E and S PPAPs” –Initial part approval for all components –Circuit Board routing to punching (normal course of business) changes –New tools to replace worn out tools changes –Additional cavities being added/approved in an existing tool where other cavities have been approved on the initial part approval –Approvals to additional revisions on custom, Product Line owned parts (i.e. brackets, trimplates, pushbuttons, circuit boards, etc.) where the PL has already approved the change  Select the Drop Down Box (see page 8) “DE PPAP for SCRs and DWG Update”. –All other changes to parts that have Full PPAP approval and do not fit the examples above.

1) Go to If you are logging on the first time and need to request an account, select “External Users Request Account” and submit a request for an account. If you already have an account, select “External Users Login”.

2) After logging in, read the non-disclosure agreement and click “accept” at the bottom of the page.

3) After a successful log-in, you will select “Upload File” from the screen shown below.

How should your PPAP file be structured?  The PPAP file you upload needs to be zipped. It can be in a PDF format or it can be multiple files that are zipped together.  Please make sure your file name contains the Delphi part number.  Please make sure your PPAP file has the 18 elements of PPAP (as defined in the 4 th edition AIAG PPAP manual), and make sure they are clearly identified to assist the approvers in locating their particular sections easily.  Please submit one part number per PPAP package. The only exception would be parts on charts.

4) In the Upload File screen enter the file name or use the browse button to select the “file to upload”.

5) Select “Delphi E and S PPAPs” from the Group List menu. DO NOT USE the “Select User” dropdown list. - For subsequent PPAP submissions related to SCR (Supplier Change Requests) use “DE PPAPs for SCRs & DWG Updates”. Note: Refer to page 2 if unsure what types of PPAPs are to be submitted to this drop box. PPAP packages affected by condidions (execptions) noted on slide 2 shall be submitted as Initial PPAP Packages not as SCR PPAP packages. 6) Type in any comments you think may be helpful in the “File Comment” box.

7) When complete, the “Upload File” screen should look something like what is shown below. After you have completed filling out the “Upload File” screen, click the “Upload File” button below the File Comments box to submit the PPAP. You should receive an saying the file was successfully uploaded.

Where do you send mechanical part samples if applicable? Mechanical part samples should be shipped directly to the Delphi E&S engineer your company is working with. If you do not have the Delphi contact information for shipping samples, then you can use the following address information below. Please include a copy of the PSW you submitted with your electronic PPAP package when shipping sample parts. Mailing Address for Mechanical samples for Initial PPAP: If you are not sure where to ship the samples, ship to the following docks at Delphi E&S to the attention of PPAP Coordinator Jo Ellen Feazel. This is not applicable for samples associated with Supplier Change Requests (SCR). Delphi E&S CTC, Plant E. Lincoln Rd. Kokomo, IN 46904

 The PSW (part submission warrant) must show  the part drawing revision that is being PPAPed  the correct manufacturing duns code that will supply the part  the IMDS tracking number if the part is a purchased part  The drawing must be officially released in the Delphi drawing system.  The part must be officially sourced if it is a purchased part. Requirements for a PPAP to be processed

Requirements for PSW / PPAP  PSW MUST be compliant to the AIAG Production Part Approval Process PPAP Manual, 4 th Edition  Reference Appendix A “Completion of the Part Submission Warrant (PSW)” PPAP 4 th Edition, page 22 – 23.  PPAP submissions for Chart Drawings ONLY, MUST have an attached form with each part number listed as indicated.  All PPAP documentation MUST be in English or include an accurate English translation on them.

Requirements for PSW Delphi Part Name as on Delphi Drawing Delphi Part Number Delphi P/N Supplier P/N Delphi Drawing Revision Delphi Drawing Date Supplier Mfg / Fab Site & DUNS Supplier Mfg / Fab Site Address Delphi Electronics & Safety Check yes with IMDS number Complete remaining form as specified in PPAP 4 th Edition, page 22 IMDS Number kg X Red wording is required - blank spaces put N/A if not applicable

Complete section per PPAP 4 th Edition Instructions Additional remarks as needed. For mechanical/tooled parts include Supplier Weekly Capacity (____) & Weekly Delphi Program Requirements (_____) Supplier Electronic Signature Complete Supplier Name Supplier Phone Number Supplier Title Supplier Fax Number Production rate and hours is a requirement for PPAP submissions X Check Level 4 when in doubt Red wording is required - blank spaces put N/A if not applicable Check correct box X Requirements for PSW

Delphi will not return a signed PSW to the submitting organization (supplier) Use the Parts Approval Letter in-lieu-of the signed PSW ed by the Delphi PPAP administrator

PART NUMBER IS FOUND HERE PART REVISION & DATE IS FOUND HERE  Drawing Revision PSW Drawing Revisions (single part number)

Chart Drawing Cover Page Chart part number Do Not Use on PSW Chart Revision Do Not Use on PSW PSW Drawing Revisions (Chart part numbers)  Drawing Revision

Use this part Number & Revision Number for the PSW PSW Drawing Revisions (Chart part numbers)  Drawing Revision

PSW Drawing Revisions (Chart part numbers) Chart Drawing Cover Page USE THIS DATE ON PSW