1 IS-2000 Release A Sync Channel Problem Resolution MotorolaNokia.

Slides:



Advertisements
Similar presentations
SAR Overview Business Case Review Logical SARPhysical SAR Implementation Review 1.
Advertisements

1 Methods to Handle the Motorola/Nokia Sync Channel Problem for cdma2000 Revision A Common Channel Deployments Single Carrier Solution 6 August 2002 Qualcomm.
Technical Issues Related to Standards -- Band Class 5 Band Plans Dr. Edward Tiedemann Chair, 3GPP2 TSG-C Working Group 3 CDMA450 Evolution.
Interoperability and Health Information Exchange Workgroup March 10, 2015 Micky Tripathi, chair Chris Lehmann, co-chair.
ISO 9001:2008 What did the November 2008 amendments to ISO 9001 mean to you?
The OMII Perspective on Grid and Web Services At the University of Southampton.
1 Title: Comments on CDMA2000 1x Rev E One-Bit-Fix in SPM Abstract: This contribution proposes comments on the one-bit-fix in SPM of cdma2000 Rev E to.
1 cdma2000® Data Service Transition to NULL Support Jun Wang Ravi Patwardhan June 5, 2003 Recommendation -
February 24, 2004 TR-45 Lawfully Authorized Electronic Surveillance (LAES) Activity FCC/TIA Status Meeting on LAES Terri L. Brooks Chair TR-45 LAES Ad.
1x Device Binding Framework Overview to TSG-AC 3GPP2 TSG-AC AC Source: TSG-SX WG4 Contact(s): Anand Palanigounder,
Sam Samra-CDG CDMA Development Group. CDGOperators Subscriber Equipment Network Infrastructure Network Enhancement/ Optimization Revenue Management/ Enhancement.
February 24, 2004 TR-45 Lawfully Authorized Electronic Surveillance (LAES) Activity Industry Meeting on LAES Terri L. Brooks Chair TR-45 LAES Ad Hoc 817.
1 MEID (Mobile Equipment Identifier) in TSG-C WG2 WG-II February 13, 2004 Notice ©2004 Third Generation Partnership Project Two (3GPP2). All rights reserved.
T-MPLS Update IETF70 December 2007 Stewart Bryant
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
1 Title:Using group of artificial pilots to identify target femtocell during active hand-in Source:Peerapol Tinnakornsrisuphap, Ravindra Patwardhan QUALCOMM.
T-MPLS Update (abridged) IETF70 December 2007 Stewart Bryant
1 TSG-C WG1.6 Comments to TSG-X Sept.15-19,2003 Calgary, Alberta D.Neeley - Nokia TSG-C Working Group 1.6 “Location Services” New Features for C.S
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
GTP (Generic Tunneling Protocol) Alessio Casati/Lucent Technologies Charles E. Perkins/Nokia Research IETF 47 draft-casati-gtp-00.txt.
Information Technology Procurements RFP Review Process April 27, 2009.
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
Doc.: IEEE /0231r3 Submission March 2010 John R. Barr, JRBarr, Ltd. & NiCTSlide 1 Efficient Methods for Coexistence with Other 60GHz Systems Date:
Distributed Nodes Cellular Systems for IEEE m Document Number: IEEE S802.16m-07_214, Date Submitted: Source: Yunzhou Li, Xibin Xu, Xin.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
1 Enhanced ECCLM & EGSRDM: SWG23 Status Ragulan Sinnarajah Chair, SWG23 Qualcomm Incorporated 1/11/05.
Cdma2000 Release C (1xEV-DV) Status and Summary. Outline Cdma2000 1xEV-DV Release C Overview –Design compatibilities –Release C enhancements to cdma2000.
Active Call Hand-in in cdma2000 1x Airvana Qualcomm October 27 th, GPP2 Seoul, Korea Notice ©2008. All rights reserved. The contributors grants a.
M2M Study Item 3GPP2 Orlett W. Pearson May | 3GPP2 M2M Study Item | May GPP2 M2M This study will include the following study targets: 
Page 1 C.S Bug Fix Masa Shirota, QUALCOMM Inc. October 25, 2010 Recommendation: FYI Notice QUALCOMM Incorporated.
Machine-to-Machine(M2M) Communication for cdma2000 Systems Orlett W. Pearson, 3GPP2 LS to TR-50 April 2011.
22 July 2004 C.R Over-the-Air Service Provisioning for MEID-Equipped Mobile Stations in Spread Spectrum Systems - Overview - TSG-C WG1 SWG4.
08/20/01 1 IS-2000 Sync Channel Issue The IS95 Sync Channel Message length is increased in IS2000 Release 0 (11 bits) and Release A (14 to 81 bits) Legacy.
1 Stage 1 WLL Service Definitions Submit toTR45.5/3GPP2 Committee by CDG-WLL Team Presented by Julia Kwok, Vice Chair of CDG-WLL Team October 11, 1999.
Technical Issues Related to Standards -- Band Class 5 Band Plans Dr. Edward Tiedemann Chair, 3GPP2 TSG-C Working Group 3 CDMA450 Evolution.
Doc.: IEEE /759r0 Submission November 2002 Bruce Kraemer, Intersil TK Tan, PhilipsSlide 1 Proposal to Amend a to address Japanese bands.
Doc.: IEEE Submission March, 2014 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
1 Title: A Proposal for Identifying Hand-In Femto Cell Sources: ZTE Contact: Yonggang Fang Xiaowu Zhao
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC D.
C August 19, 2003 Page 1 SMS Push Teleservice Nobuyuki Uchida QUALCOMM Incorporated Notice ©2003 QUALCOMM Incorporated. All rights reserved.QUALCOMM.
20 September 2004 C R4 0 Proposed Process for TSG-C Work Items Source Alberto Gutierrez Motorola
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Some Considerations about 16m Network Architecture Document Number: C80216m-08_491 Date Submitted: Source: Qu Hongyun, Fang Huiying, Liu Yang,
<January 2002> doc.: IEEE <02/139r0> 10/3/2017
Proposal for Document Structure
Information Technology Procurements RFP Review Process
Railway Mobile Communication System Future Dan Mandoc,
Sept 2004 doc.: IEEE a Nov 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
July 2010 doc.: IEEE /0xxxr0 A summary of draft LS from 3GPP in response to IEEE 802 LS in March May 2017 Authors: Name Company Phone.
SG-13 / SSG Information Sharing Session Geneva - 05 November 2002
Standards and Certification Training
Wireless ATM PRESENTED BY : NIPURBA KONAR.
BLUETOOTH (I) Bluetooth technology aims at so-called ad hoc piconets, which are local area networks with a very limited coverage and without the need for.
Submission Title: [Channel Page/Number Proposal]
November 2008 doc.: IEEE November 2008
Comment resolution on BSR CID 8426
Sept 2004 doc.: IEEE a Nov 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of CID 139] Date Submitted:
July 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Bit Order Issues] Date Submitted: [ “1 July,
WG10 Activity Report 11th October Brussels.
Comment resolution on BSR CID 8426
July 2010 doc.: IEEE /0xxxr0 A summary of draft LS from 3GPP in response to IEEE 802 LS in March May 2017 Authors: Name Company Phone.
Comment resolution on BSR CID 8426
Response to Coexistence Presentations
September 2002 doc.: IEEE /xxxr0 September 2002
General Discussion Conclusions:
TIA (3GPP2) Activities on Technology Evolution
Sept 2004 doc.: IEEE a Nov 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Response to Official Comments
SM Power Save for 11ay Date: Authors: August 2017
Presentation transcript:

1 IS-2000 Release A Sync Channel Problem Resolution MotorolaNokia

2 Outline Review of 3GPP2 Steering Committee (SC) Guidance Reason for Standards-based Solution Proposed Solution –Overview of 3GPP2 TSG-C Actions –Overview of Technical Solution Impacts to Deployed Equipment Impacts to Release A Mobiles Impacts to Release A Networks

3 3GPP2 SC Guidance (SC r4) Resolution of the Sync Channel issue shall: Maintain a single specification Be available by March 15 if a specification change is required Approach: TSG-C to release – without sync channel fix – Release A Addendum 2 and Release B during Seattle meeting (Feb 4 – 8) Establish an Ad Hoc Group in SC to find solution SC Ad Hoc Group to identify solution and agree by consensus SC Ad Hoc Group shall submit the agreed solution to TSG-C for approval

4 3GPP2 SC Guidance (SC r4) Ad Hoc Group Requirements: Single specification such that a Release A mobile is interoperable with Release A and prior standards compliant infrastructure Resolve the Sync Channel Issue such that there is no impact to currently deployed equipment (BS & MS)

5 Reason for Standards-based Solution Fundamental aspects of problem: “28 Octet” problem requires infrastructure to transmit an IS-95 Sync Channel Message since IS-2000 Sync Channel Message is too long. IS-95 Sync Channel Message can only direct a mobile to a Paging Channel. Cannot direct it to BCCH/F-CCCH (new common channels introduced in Release A). There is no information on the Paging Channel to direct Release A mobiles to a BCCH/F-CCCH. Therefore, a standards-based solution is needed to address this issue.

6 Proposed Solution Motorola proposes the following course of action, consistent with SC guidance, to resolve the Sync Channel Issue: Publish Release A, Addendum 2 and Release B during the Seattle TSG-C meeting (Feb 4 – 8) without inclusion of the sync channel fix Create Release A, Addendum 3 to address the sync channel problem This addresses the “single specification” requirement of the SC

7 Overview of Technical Solution New fields added to the end of the existing Extended CDMA Channel List Message on the Paging Channel. –This is the minimum standards addition necessary to fix the sync channel problem. –Release A base stations optionally include the extra fields. If fields not included, then no impact to the BS. –Release A mobiles compliant to Addendum 3 must be able to process these fields. –No explicit statement of a Release A base station transmitting an IS-95 Sync Channel Message – this is handled outside of the standard –This addition does not cause any compatibility or performance issues in existing infrastructure or mobile equipment and is necessary to ensure a Release A mobile is interoperable with deployed networks per SC guidance. Leverages work done by TSG-C WG2

8 Overview of Technical Solution Release A Addendum 3 Fix. Inclusion of the following fields at the end of the Extended CDMA Channel List Message (ECCLM) when sent on the Paging Channel:

9 Impacts to Deployed Equipment No impacts to already deployed mobiles –ECCLM did not exist in IS-95 – no impacts to IS-95 mobiles. –Per the standard, Release 0 mobiles will ignore additional fields at end of ECCLM defined in Release A Addenda for sync channel fix. No impacts to already deployed networks –ECCLM did not exist in IS-95 – network will not transmit ECCLM. –Release 0 network will not transmit additional fields at end of ECCLM as defined in Release A Addenda for sync channel fix. Therefore, IS-95 and IS-2000 Release 0 mobiles not impacted by fix, and do not have roaming issues related to fix.

10 Impacts to Release A Base Stations Release A Addendum 3 (A3) base station required to support at least 1 new bit -- NON_TD_SEL_INCL field. –If operator does not deploys sync channel fix, this bit set to ‘0’ and no additional fields required. –If operator deploys sync channel fix, this bit set to ‘1’ and additional fields are included in ECCLM.

11 Impacts to Release A Mobiles Release A Addendum 3 (A3) mobile required to process new fields defined in Addendum 3 A3 mobiles can roam into any (A3, Release 0, IS- 95) network However, A2 mobiles, if they exist, may not obtain all Release A features if operating in an A3 network that has the fix deployed. –REASON: A2 mobile will ignore the additional fields being sent by the A3 base station, and will therefore not be redirected to the Release A capable frequency.