 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.

Slides:



Advertisements
Similar presentations
Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
Advertisements

Stormwater Pollution Prevention Plan (SWP3) Requirements
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Stormwater Regulations and Programs Law Permits Watershed Programs Information available at
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
Stormwater Pollution Prevention Plans
What is NPDES? “National Pollutant Discharge Elimination System”
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
2014 Industrial General Permit Summary of Key Updates Order DWQ Sandy Mathews August 19, 2014.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
1 Common Issues on Plans Recertification Training For Level II Introduction to Design Certified Plan Reviewers and Certified Design Professionals Issued.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Creating a Storm Water Pollution Prevention Plan For Industrial Facilities.
Module 7: Construction Phase
Construction and State Storm Water Permits What does it all mean? February 5, 2015Casper Workshop1.
Expedited Settlement Offer Worksheet Deficiencies Form
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Stormwater Permitting at Airports Julianne Rantala MPCA, Industrial Division.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Environmental Viewer and KPDES Permit Maintenance Managers April 2007.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Welcome to training on Best Management Practices for Erosion and Sediment Control.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Stormwater Control & Design
Purpose of Stormwater Pollution Prevention Plans (SWP3s) for Industries Richard Smith Resource Management Conference Tulsa Garden Center March 26, 2015.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
Test Your Storm Water Knowledge!
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
San Rafael, California November 12, 2015
0 Montana Department of Environmental Quality Permitting and Compliance Division Water Protection Bureau Water Quality Discharge Permits Section Storm.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Pollution Control: For Field Office Construction Sites.
Erosion and Sediment Control Ordinance. City of Southlake Strategy Map Live Our Core Values The City of Southlake provides municipal services that support.
Anticipated Changes to Oklahoma’s Multi-Sector Industrial Permit for Stormwater Discharges (OKR05)
Welcome to the Frog Environmental Winery Compliance Association
MS4 & Construction Storm Water Permits
SWPPP Basics.
TPDES Construction Management at the City of Laredo
EPA Public Meeting Dallas, Texas May 10, 2005
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
John Tinger U.S. EPA Region IX
Stormwater Pollution Prevention Plans
INDOT Storm Water Management
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
Stormwater Construction General Pemit (CGP) TXR150000
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and Design Development Assessment Control Selection and Plan Design Certification & Notification Construction/implementation Final Stabilization Understanding SWPPPs

 Storm Water Pollution Prevention Plan (SWPPP)  CERTIFICATION Written statement – “I certify under a penalty of law…” Signed by the “operator” An “authorized representative” not necessarily the owner  Notice of Intent (NOI) Must be submitted 7 days prior to starting construction SWPPP must be completed prior to issuing the NOI  DYNAMIC Must be a living document…  NOTIFICATION Must be posted ON-SITE (notice at entrance stating where it is) If no location on-site then a notice must be posted where it is Understanding SWPPPs

 Storm Water Pollution Prevention Plan (SWPPP)  Minimum Requirements Identify site operators Function of the project Sequence and timing Total disturbed area General location map Site map Discharges from related industrial activity (dedicated AC plants, PCC batch plants…) Interim and permanent stabilization activities Records Description of practices to divert flows, retain flows… Understanding SWPPPs

 Storm Water Pollution Prevention Plan (SWPPP)  Minimum Requirements (continued) Inspection schedule Post-construction management  AMENDMENTS With-in 7 days of change that has significant effect Must be amended if discharges caused water quality exceedance or if BMPs ineffective Understanding SWPPPs

 SWPPP  The plan must be site specific Includes site location map Includes the erosion control plan Address the site discharge locations Identifies receiving waters…  The plan must be dynamic Site inspection reports Amendments Rain reports Spill response items Includes the BMP wall map (erosion control plan) Understanding SWPPPs

 SWPPP  The plan must be certified The plan is a contract EPA requirements State requirements “I certify under penalty of law (that I will implement this plan…)” The plan must be signed and dated by authorized individuals  The plan identifies the person responsible for implementing the plan Operator – The individual who has operational controls, financial control or ownership on a site Understanding SWPPPs

 SWPPP  Notice of Intent Understanding SWPPPs

 SWPPP  The erosion control plan is part of the SWPPP Understanding SWPPPs

 SWPPP  Soils The plan addresses the soil types anticipated Understanding SWPPPs

 SWPPP  Runoff coefficient and water quality Preconstruction/predevelopment runoff Pre and post construction should be equal California requires that post development runoff be equal to 85% of original existing conditions.  Receiving waters Identifies the where the waters will end up Identifies if these waters are 303(d) listed Could add additional requirements of the project Understanding SWPPPs

 SWPPP  Environmental assessment Addresses the potential threats to threatened and endangered species Identifies if there is an historic aspect to the site Understanding SWPPPs

 SWPPP  Pollutants of concern Sediment Turbidity Hydrocarbons or petroleum products Biological Metals pH Nutrients Solid waste Temperature Hazardous waste and toxic waste Trash Construction materials handling organics Understanding SWPPPs

 SWPPP  Identifies BMPs Site planning and management Erosion control Sediment control Runoff control Good housekeeping and materials management Post construction BMPs Relative BMP placement  Amendments VERY important to constantly amend the plan Makes the plan achievable Most plans contain many “canned” documents and statements Many construction activities will violate the SWPPP and must be amended Understanding SWPPPs

 SWPPP  Monitoring and Sampling Requirements Many sites have sampling requirements Be certain that you are sampling for all required pollutants!  Spill prevention and controls The project’s spill prevention controls and countermeasures program must be included in the SWPPP  Notice of Termination 100% of all work on the project must be complete. Includes all building improvements Achieve final stabilization - 70% vegetation ESTABLISHED Transfer coverage to another authorized party (the owner sells the property) Understanding SWPPPs