PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.

Slides:



Advertisements
Similar presentations
EMMA Upgrade: Slow Acceleration with Low-Frequency Cavity J. Scott Berg Brookhaven National Laboratory 12 March 2010.
Advertisements

Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
A longitudinal damper for the PS (preliminary ideas) 24 April 20121M. Paoluzzi BE/RF.
Experimental Study of the Inductance of a Toroidal Ferrite Core at High frequencies Michelle Walker North Carolina A&T State University Supervisor: Dave.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
KEK Participation in the LHC Injector Upgrades C. Ohmori, KEK/J-PARC M. Paoluzzi, CERN 10 PSB cavitiesPS Damper cavities.
Limits of MA cavity C. Ohmori KEK. What kind of limit? Voltage Field Gradient Temperature (cooling) –below 200 deg. C for long term (Hitachi Metal Co.).
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Very preliminary! E. Jensen, 29-May-08.  Present PS 10 MHz system:  10+1 cavities, 2 gaps/cavity, 10 kV/gap  2.7 … 10 MHz tuning range  longitudinal.
Contents Overview of 150 MeV FFAG Accelerator
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.
RF System for HESR Status report, January 2006 F. Etzkorn / A. Schnase, with help from S. An, K. Bongardt.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
FFAG Studies at RAL G H Rees. FFAG Designs at RAL Hz, 4 MW, 3-10 GeV, Proton Driver (NFFAGI) Hz,1 MW, GeV, ISIS Upgrade (NFFAG) 3.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
PSB Finemet upgrade: overview, preliminary results & planning LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J. Sanchez Quesada (RF/FB, RF/CS)
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
RF 1/33 ALBA RF system why, how and other questions Francis Perez.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Brief summary of Finemet Review 9-10 September S. Gilardoni.
Measurements and potential improvements of the amplifier for the 10 MHz cavities G.Favia, V.Desquiens, M.Morvillo.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Barrier RF Stacking Weiren Chou and Dave Wildman Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim, Germany,
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN,
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
650 MHz Solid State RF Power development at RRCAT
RF System for Bunch Rotation C. Ohmori ( KEK). Contents PRISM RF –Introductions –Present status –RF for 6 cell ring –Upgrade plan High Duty RF system.
Longitudinal Limitations of Beams for the LHC in the CERN PS 0.
Prospects for developing new tubes
The ISIS Dual Harmonic Upgrade
Bunching system for SPES project
Considerations on RF systems of SPPC collider and its injector chain
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
10 MHz amplifier status G. Favia
Physics design on Injector-1 RFQ
Acknowledgments: LIU-PT members and deputies, H. Bartosik
PSB rf manipulations PSB cavities
LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J
Junji Urakawa (KEK) for ATF International Collaboration
Bunch Separation with RF Deflectors
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
PSB magnetic cycle 160 MeV to 2 GeV
Status of the ASTRID2 RF systems
PSB magnetic cycle 900 ms MeV to 2 GeV
PSB rf Power limitations with Linac4
Parameters Changed in New MEIC Design
RF Parameters for New 2.2 km MEIC Design
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151

C02 : 4 cavities in 2 straight sections freq= MHz Vgap=8 kV Rs≈350Ω seen by the beam C04 : 4 cavities in 1 straight section freq MHz Vgap=8 kV Rs≈350Ω seen by the beam C16 : 4 cavities in 1 straight section freq MHz Vgap=6 kV Rs≈2 kΩ seen by the beam 11/23/20152

Consolidation foreseen C02, C16 Replacement of ITL, power supplies, cables (rebuilt the systems keeping the cavities and amplifiers) Possibly move AVC and Tuning loops to Low Level Consolidation foreseen C04 Same as above but power stage replacement (improve mean available power and current for beam loading compensation) Is it the time to envisage a technology change? 11/23/20153

Narrow band Tuned systems Highly optimized Almost no room for Vgap increase Further reduction of Rs very difficult 11/23/20154

Finemet LEIR Cavity A single cavity covers the range 0.35÷5 MHz Cavity length 0.5 m Gap voltage 4 kV (tested at 5 kV) No tuning AVC integrated in Low Level But… … diameter incompatible with PSB overlapped rings 11/23/20155

Finemet in PSB Maximum outer diameter OD=330mm Inner diameter ID=200mm Standard Finemet thickness 25mm Two kind of material: Standard LEIR like : FT3M (data available from small rings) New low loss : FT3L (Thanks to KEK and Chihiro Ohmori for providing data) 11/23/20156

Air cooling test on small rings (OD=133mm) : - Simple blower on each ring side - With 500kW/m 3 t MAX ≈70°C - Maximum inside temperature unknown - Limit temperature - Suggested from Hitachi t MAX ≤100°C - KEK booster experience t MAX ≈100°C - J-PARC experience t MAX ≈200°C for few hours 11/23/20157

Minimum peak voltage 380V for FT3L 300V for 1 MHz Note: f Injection ≈1 MHz with LINAC4 One C04 cavity contains 50 rings In the range 1÷4 MHz : V GAP =15÷17 kV with FT3M V GAP =19÷29 kV with FT3L 11/23/20158

Basically working on a capacitor Almost no difference with increased number of rings 11/23/20159

Alternative approach based: use two rings (FT3L) and 1 gap Each ring can accept 500pF and still cover the 1÷4 MHz band. R Pmin is ≈100 Ω (per ring) P≈1500W for 700V across two rings This can be supplied by a solid-state amplifier (in PSB solid state amps used since 1987!!!) 11/23/201510

Beam current 11/23/2015 w/o acceleration, the h1 bunch length: φ L  138 o (2.4 rad or 220 ns Total charges per bunch= 2 E13 h1 (sinus shape approx.) For a pure h1 or h2 beam, the beam peak current is 22.7 ej 1 st rf harmonic : Î H1 = 9.56 A 2 nd rf harmonic: Î H2 = 6.06 A φ L, T L Sine shape approximation 11 Slide provided by A. Blas CERN BE-RF

MRF157 Mosfet 600W up to 80MHz To provide 800W (2 units push-pull) I D-peak ≈32A I D-DC ≈10A 11/23/ MRF151 Mosfet 150W to 175MHz To provide 200W (2 units push-pull) I D-peak ≈12A I D-DC ≈4A

Shunt resistance of each gap Rs≈200 Ω To get the present 8kV need 12 gaps Total impedance seen by the beam Rs tot ≈2400 Ω Impedance of present cavities (including FB) ≈350 Ω We must reduce Rs tot and compensate beam loading with: ≈20 dB RF feedback seems possible with 10 ns delay in the loop. 1 turn feedback: difficult (nevertheless possible) because revolution time is only ≈500 ns at extraction. Combination of both 11/23/201513

The cavity could be used as combiner for push-pull operation and driven by 2 amplifiers similar to the LEIR 1kW drivers. The total power could easily be brought to 2 x 2 kW simply increasing the DC supply by 15%. The 120W (200W) power module delay is 12 ns and the 9 ways combiner 4ns. Both could be reduced and 10 ns total seems within reach. 11/23/201514

11/23/ Simulated system response: 1 Finemet ring driven by 9 combined 200W modules and feedback including delay. Amplification chain response. 200W module. 1 ring impedance.

Advantages Modular system. Reduced machine space and/or increased installed voltage. Possibility of installing spare cavities as hot back-up. No tuning loop. Simplified solid-state system. Risks Additional new system at restart with LINAC4. New technology and configuration. Complete new design. 11/23/201516

How could we proceed… Design and produce a first section. … if successful then: 2012 produce and install and test a full set of cavities for the required 8 kV. They should fit in the place of one of the present C04 cavities Tests with beam (1 ring and C02 system still in place) … if successful then: Proceed with full scale construction and C02/C16 renovation 2016 Installation … but for security 2011 Design a first C04 improved RF power amplifier Produce and install C04 improved RF power amplifier Tests with beam (1 ring) Depending on 2013 tests start C02/C04/C16 renovation or stop C04 renovation it and proceed with new system Installation 11/23/201517