Intensity Stabilization Servo Plan Yuta Michimura Department of Physics, University of Tokyo November 23, 2015.

Slides:



Advertisements
Similar presentations
Enhanced LIGO Laser System S. Wagner, B. Schulz, R. Wachter, C. Veltkamp, M. Janssen, P. Weßels, M. Frede, D. Kracht.
Advertisements

Present status of the laser system for KAGRA Univ. of Tokyo Mio Lab. Photon Science Center SUZUKI, Ken-ichiro.
Lab book samples What goes in the lab book -- everything.
LIGO-G W Performance of the LIGO I PSL at the LIGO Hanford Observatory Rick Savage LIGO Hanford Observatory Laser Zentrum Hannover November 15,2000.
LIGO-G W LIGO II Pre-stabilized Laser System Design Requirements and Conceptual Design David Ottaway, Todd Rutherford, Rick Savage, Peter Veitch,
Performance of the LIGO Pre-stabilized Laser System Rick Savage LIGO Hanford Observatory Ninth Marcel Grossmann Meeting on General Relativity Rome 2000.
Optical Pumping Intense light source at h  (e.g. flash lamp) Excites to a metastable state to achieve population inversion With fast flashing, initial.
Optical Amplifiers An Important Element of WDM Systems Xavier Fernando ADROIT Group Ryerson University.
Electronics and Cables around IMC Common Mode Servo Board Yuta Michimura Ando Group Department of Physics, University of Tokyo August 10, 2015.
Servos Servos are everywhere. Elements of servo System -- to be controlled Sensor or detector -- measure quantity to be controlled Reference -- desired.
LIGO-G v5 1 Pre-stabilized Laser System (PSL) Technical Status NSF Review of Advanced LIGO Project Benno Willke, AEI Hannover and the AdvLIGO PSL.
6 x 99 Think: round off 99 to 100 So… 6 x 99 becomes 6 x 100 = 600 Then subtract: 600 – 6 = x 79 4 x 80 = 320 – 4 = 316.
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
Optical Gyroscopes for Ground Tilt Sensing in Advanced LIGO The need for low frequency tilt sensing The optics in Advanced LIGO’s suspensions must be very.
VIRGO_LCGT Meeting Laser & Mirror 5 November, 2010 Norikatsu Mio.
Current status of Laser development 2nd Korea - Japan Workshop on KAGRA 2012/5/28(Mon)
Pre-stabilized laser (PSL) for AdV Scope of the system Main tasks Requirements Reference solution and status of the design Plans towards completion Technical.
Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008 LIGO G Z Benno Willke for the PSL team.
New iKAGRA Configuration Yuta Michimura Department of Physics, University of Tokyo 11th KAGRA F2F (University of Tokyo) Feb 6, 2015.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo December 8, 2015.
Status of the Advanced LIGO PSL development LSC meeting, Baton Rouge March 2007 G Z Benno Willke for the PSL team.
Laser system for LCGT Norikatsu MIO.
Ultra-stable, high-power laser systems Patrick Kwee on behalf of AEI Hannover and LZH Advanced detectors session, 26. March 2011 Albert-Einstein-Institut.
Summary of iKAGRA Test Run Mar 25-31, 2016 Yuta Michimura Department of Physics, University of Tokyo April 12, 2016JGW-T
LIGO-G W Status of the LHO PSLs Rick Savage LIGO Hanford Observatory LIGO Scientific Collaboration Meeting August 13-16, 2001.
Arm Length Stabilization Conceptual Configuration Yuta Michimura Department of Physics, University of Tokyo JGW-T November 14, 2016.
bKAGRA PSL Design Study
Daniel Sigg, Commissioning Meeting, 11/11/16
Main Interferometer Subsystem
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Apr 11-25, 2016
A study of Arm Length Stabilization in KAGRA
Yuta Michimura Department of Physics, University of Tokyo
Electronics and Cables around IMC Common Mode Servo Board
J. Kovalik, LIGO Livingston Observatory
GEO – VIRGO joint noise hunting project
Lasers for Advanced Interferometers
Interferometer Design for bKAGRA Phase 1 and Beyond
Present status of the laser system for KAGRA
Arm Length Stabilization Conceptual Configuration
Arm Length Stabilization Conceptual Configuration
Cartoon of the optical layout around IMC, IFI and IMM
Development of Optical Resonant Cavities for laser-Compton Scattering
Interferometer Design for bKAGRA Phase 1 and Beyond
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1 and Beyond
R&D of Freedback-Free Optical Resonant Cavity
Interferometer Design for bKAGRA Phase 1 and Beyond
bKAGRA PSL EOM Layout ~180W ? to IMC Laser EOM (fPMC, PM) PMC EOM
Summary of Issues for KAGRA+
Interferometer Design for bKAGRA Phase 1 and Beyond
Commissioning Procedure for bKAGRA Phase 1 ( )
Commissioning Procedure for bKAGRA Phase 1
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Interferometer Design for bKAGRA Phase 1 and Beyond
Beam Propagation for bKAGRA Phase 1 with flat ETMs
Summary of iKAGRA Test Run Mar 25-31, 2016
Intensity Stabilization Servo Plan
Interferometer Design for bKAGRA Phase 1
Intensity Stabilization Servo Plan
Arm Length Stabilization Conceptual Configuration
KAGRA ISC Electrical Components Layout
Yuta Michimura Department of Physics, University of Tokyo
Transmission System Design
Measurement of radiation pressure induced dynamics
KAGRA ISC Electrical Components Layout
Presentation transcript:

Intensity Stabilization Servo Plan Yuta Michimura Department of Physics, University of Tokyo November 23, 2015

Start discussion on the sevo topology of the bKAGRA intensity stabilization servo (ISS) Start from following the aLIGO design Related documents: - Optics Express 20, (2012) (aLIGO ISS/FSS paper) - Optics Letters 34, 2912 (2009) (aLIGO ISS paper) - LIGO-T (aLIGO PSL Final Design) - JGW-G (bKAGRA laser development status) - JGW-T (requirement from MIF; Fig. 4.8, 4.9)Optics Express 20, (2012)Optics Letters 34, 2912 (2009)LIGO-T JGW-G JGW-T Scope 2

see related documents for the real spectra Requirement 3

aLIGO Topology 4 NPRO FI AOM FI PMC Finesse: 130 Round trip length: 2.02 m high power oscillator medium power amplifier IMC Finesse: 475 Round trip length: 32.9 m

bKAGRA Topology Plan 5 NPRO AOM FI solid state amplifier fiber amplifier IMC Finesse: 500 Round trip length: 53.3 m PMC Finesse: 155 ? Round trip length: 1.95 m ? PMC design not fixed yet We can implement noise eater servo (pick off right after NPRO and feedback to NPRO) Any feedback to the current to the fiber amps and/or the solid state amps?