Considerations on laser-p+ beam merging for CB, BG, PM.

Slides:



Advertisements
Similar presentations
EMMA Magnet Design Ben Shepherd Magnetics and Radiation Sources Group ASTeC STFC Daresbury Laboratory.
Advertisements

Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Magnet rotated by 5.9 degree Distance from entrance point to magnet right bottom corner m.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
PSB h- injection Layout issues –Are 3 or 4 KSW needed –Geometry of the injection –Element lengths and locations Element performance specifications H 0.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
AWAKE Electron Spectrometer Simon Jolly, Lawrence Deacon, Matthew Wing 28 th January 2015.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
B. FaatzS2E workshop, August 18-22, XFEL simulations with GENESIS Outline: Undulator layout (real/simulated) Matching Genesis.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
BL1U at TRIUMF UCN Beamline Septum & Dipole Magnets (April 12, 2010)
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
New Gantry Idea for H + /C 6+ Therapy G H Rees, ASTeC, RAL 4 th September, 2008.
Simulation of multipacting thresholds G. Iadarola and A. Romano on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, 8 September, 2015.
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
Primary beam production: progress - Extraction from LSS2 - Switching from TT20 at 100 GeV B.Goddard F.Velotti, A.Parfenova, R.Steerenberg, K.Cornelis,
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
Extraction and beamline progress B.Goddard TE/ABT.
Cornell ERL-FFAG Lattice Using Dejan’s doublet arc cell September 2014Stephen Brooks, FFAG’141.
Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Shielding the 140 mm option F. Cerutti, L.S. Esposito on behalf of CERN FLUKA team.
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
A Possible Source of the Tune Drift on the Front Porch in the Tevatron.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
Beam transfer considerations for LAGUNA Angelina Parfenova, W. Bartmann, L. Ducimetiere, B. Goddard, V.Kain, M.A. Kowalska, M. Meddahi, B. Puccio, F. Velotti.
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
April 17, Dejan TrbojevicFFAG07 -Non-Scaling FFAG gantries1 Non-Scaling FFAG Gantries Introduction: Motives: The most challenging problem in the carbon/proton.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
PS2 WG Injection and extraction systems Basics and assumptions
Oleksiy Dolinskyy 1st December, 2014
Primary Beam Lines for the Project at CERN
eRHIC FFAG Lattice Design
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
Options and Recommendations for TL and Dumps
The Interaction Region
Arc magnet designs Attilio Milanese 13 Oct. 2016
2nd Workshop on a Super B-Factory INFN-LNF, Frascati, Italy
AD & I : BDS Lattice Design Changes
Y. Iwashita, T. Mihara, S.Nakamura,
ILC BDS Emittance Diagnostics: Design and Requirements
SCU Next Phase Meeting July 8, 2014.
The 2mrad horizontal crossing angle IR layout for the ILC
PS2 Injection/Extraction Layout
Collider Ring Optics & Related Issues
MEBT1&2 design study for C-ADS
Negative Momentum Compaction lattice options for PS2
IR Lattice with Detector Solenoid
AXEL-2011 Introduction to Particle Accelerators
MEIC Shifting Magnet Tim Michalski August 6, 2015.
Transfer Line for EIC.
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Update on JLEIC Electron Ring Design
Compensation of Detector Solenoids
Possibility of MEIC Arc Cell Using PEP-II Dipole
ILC Beam Switchyard: Issues and Plans
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Option 1: Reduced FF Quad Apertures
Sha Bai CEPC AP meeting Work summary Sha Bai CEPC AP meeting
Presentation transcript:

Considerations on laser-p+ beam merging for CB, BG, PM

Some info/issues/questions Minimum distance of mirror to IP is about 20 m, maximum distance is about 50 m Laser beam size as a function of S from plasma cell (done) – can change by altering the laser  * at the plasma cell centre Additional tolerances for position adjustment, stability etc. should be small (maybe ~1 mm) Entrance window between p+ and laser vacuum can be separated from the p+ beamline and away from the turning mirror Co-linearity is assumed between laser and p+ beam (could be angled to help with merging but would then need more powerful laser – keep as ‘2 nd choice’ option) Volume of the turning mirror and positioning system will need maybe 50 cm longitudinal free space in the lattice (Also of note: we should update the beam loss estimates to include instruments, commissioning, setting up and accident cases)

First ideas: resuse p+ beamline switch between TT40 and TT41 Rotate everything 90 degrees to make vertical bend In TT40, 8x MBSG magnets needed (3.0 m, ½ MBB length) Total ‘merging bend’ length is 40 m (inside the quads). Too long

Combine merging and bends and triplet... Separate vertical bends for RP considerations QD Basic ideas MBA/B? MBB? QF Laser QF MBA? QD Triplet

Sagitta in MBB chambers With 2.1 T we have already a 25 mm offset at the exit of one MBB, 100 mm after two MBB, so at maximum only two MBA/B magnets possible (by offsetting the axis)

First attempt at merging region layout* Use 3.0 m quadrupoles, 6.3 m MBA/B, 0.5 m inter-magnet drifts, and 1.0 m drift for turning mirror All quadrupoles centred on p+ beam axis 0.6 degree total bend (need 3 more MBA/Bs for 2 degrees) 22 m from mirror to exist of last triplet quad... Turning mirror *upside down and back to front

P+ beam Laser beam ~40 mm ~30 mm In Central triplet QD

In MBA ~30 mm ~100 mm

At turning mirror ~30 mm ~110 mm

Next steps Optics with such a triplet! – Required spot size – Drift distance to plasma cell entrance – Beam envelopes, apertures – Element strengths Add real laser envelope function and determine beam sizes along the line Will certainly need some iteration(s)

Other possibilities MBS type magnets – no H apertue limit for laser beam Problem is that only one spare exists – but anyway will need to design and build new ones for the switch from TT60!

MBS(G) magnets used to switch between beamlines – open C-core

MBS magnet cross-section 56 mm

MQA quadrupoles? If needed, more aperture vertically Also coil window between 190 and 300 mm, so passage at about 220 mm comfortable – easier than QTL in terms of merging angle. Horizontal gap between coils about 50 mm (45 inside chamber)